BIM-BASED PLANNING OF TEMPORARY FACILITIES FOR CONCRETE CONSTRUCTION

  • Kyungki Kim;Jochen Teizer
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.1-6
    • /
    • 2013
  • Concrete construction requires utilization of many temporary facilities such as formwork, shoring, and scaffolding. Appropriate use of these temporary facilities greatly impacts the quality, cost, schedule, and safety of concrete construction. The current practice in design and planning of temporary facilities is often manual, error-prone, and re-active based on construction site layout, status, and progress in the field. Early design and planning of temporary facilities for concrete construction using Building Information Modeling (BIM) technology offers a potential solution. Although some commercially-available software exists that assists in the generation of temporary facility designs, the construction industry lacks tools that support detailed planning and design of many other temporary facilities. This research presents our early work in automating the design and planning of temporary facilities utilizing BIM. Algorithms were developed to automatically assess geometric conditions of work space to detect required temporary facilities and design them. The proposed methodology was implemented in a test model. By automatically incorporating temporary facilities into BIM, more realistic construction models can be created with less effort and errors. Temporary facilities-loaded models can finally be used for communication, bill of materials, scheduling, etc. and as a benchmark for field installation of temporary formwork, shoring, and scaffolding systems.

  • PDF

농촌지역 이재민 임시주거시설 지정 현황 및 개선 방안 (Analysis of Temporary Housing for the Displaced People in Rural Area Emergencies)

  • Lim, Changsu;Lee, Seung-chul;Kim, Eun-Ja;Park, Mi-Jung
    • 한국재난정보학회 논문집
    • /
    • 제13권4호
    • /
    • pp.413-421
    • /
    • 2017
  • 본 연구에서는 전국 실제 이재민 임시주거시설 지정 현황에 대한 면밀한 조사와 분석을 통하여 농촌지역과 도시지역의 이재민 임시주거시설의 격차를 해소하고자, 전국의 이재민 임시주거시설의 현황을 파악하였다. 분석결과, 도시지역의 지정된 이재민 임시주거시설이 농촌지역보다 시설면적이 크고 수용능력이 높은 시설 위주임을 추정 할 수 있으므로 농촌지역 역시 많은 인원을 수용할 수 있는 능력을 갖춘 새로운 시설 지정이 필요하다고 판단된다. 또한 농촌지역 대표지역 이재민 임시주거시설 분석결과 지자체마다 이재민 임시주거시설 종류가 상이하게 지정 되었으며, 개소수 역시 지자체별 편차가 크게 나타났다. 이에 지자체에서 이재민 임시주거시설을 지정하는 절차와 체계의 개선이 필요할 것으로 판단된다.

가시설 안정성 검토에 관한 인천국제공항 시공 사례 연구 (Case Study for the Stability of Temporary Shoring Facilities at Inchon International Airport)

  • 최인걸;조현모;류승철
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 1999년도 봄 학술발표회 논문집
    • /
    • pp.97-104
    • /
    • 1999
  • This case study has been prepared to provide the practical data about construction of temporary shoring facilities (i.e. braced sheet pile excavation) and to utilize the case study information effectively for design and construction of future facilities. This case study includes information such as 1) installing measurement devices to monitor the deformation of the sheet pile walls and the subsoil in the vicinity after establishing the criteria for the sheet pile deflection; 2) monitoring the actual movement of the temporary facility after setting up the survey control standard (due to the movement of the temporary facility) : 3) inspecting the suitability of the temporary facility construction: and 4) analyzing and studying the result of the tension test after installing ground anchors.

  • PDF

A Study on the Efficiency of Children's Shelter in Korea using DEA Analysis Method

  • Jeong, Seong-Bae;Joo, Mi-yeon
    • 한국컴퓨터정보학회논문지
    • /
    • 제25권6호
    • /
    • pp.207-217
    • /
    • 2020
  • 본 연구는 DEA분석 방법을 사용하여 한국 아동복지시설의 효율성을 분석한 후 한국 아동복지시설의 효율적 운영을 위한 정책 제안에 그 목적이 있다. 본 연구 분석을 위한 투입변수는 종사자수, 시설수, 정원수로 하였고, 산출 변수는 현원으로 하였다. 연구 결과는 다음과 같다. CCR분석 결과 효율적인 시설은 양육시설, 보호치료시설, 자립지원시설로 나타났고, 비효율적 시설은 일시보호시설, 종합시설로 나타났다. BCC분석 결과 효율적인 시설은 양육시설, 보호치료시설, 자립지원시설, 종합시설로 나타났고, 비효율적인 시설은 일시보호시설로 나타났다. SE분석 결과 자립지원시설이 가장 초효율적이었고, 가장 비효율적인 시설은 일시보호시설로 나타났다. 기여도 분석결과 시설 수와 종사자 수가 가장 기여도가 높고, 가장 비효율적인 시설인 일시보호시설의 개선 가능성은 정원을 조정하는 것으로 나타났다. 연구결과를 중심으로 다음과 같은 제언을 제시하겠다. 첫째, 일시보호시설의 정원 조정이 요구된다. 둘째, 아동복지시설 종사자의 전문성 강화가 요구된다. 셋째, 아동복지시설장의 전문성 강화가 요구된다.

현장중심의 건설가설기술요소 분류체계 구축 (Development on Breakdown Structure of Construction Site centered Construction Temporary Technology Index)

  • 박준모;김옥규
    • 한국건설관리학회논문집
    • /
    • 제15권4호
    • /
    • pp.77-85
    • /
    • 2014
  • 건설가설공사는 타워크레인, 리프트와 같은 가설양중설비나 사무소, 창고, 시험소 등의 가설건축물 및 각종 작업에서 사용되는 비계, 작업발판, 동바리, 거푸집 등을 일시적으로 조립, 설치하여 사용하고 공사가 완료된 후에는 철거하는 건설공사의 주요 과정인 동시에 핵심공종이다. 새로운 요구사항에 대한 건설현장의 발 빠른 대응과는 달리 국내의 건설가설분야의 기술체계는 실무에서 효용성이 낮아 개선이 필요한 실정이다. 이에 본 연구에서는 기존 기술체계와 현업에서 활용되고 있는 새로운 기술과 기법 등을 정리하고, 현장관리자의 의견과 검토를 통한 가설기술의 기초가 되는 기술요소의 분류체계를 구축하였다. 이를 바탕으로 향후 건설가설기술요소에 대한 성능과 활용성에 대한 연구를 통하여 지식정보체계로 거듭날 수 있도록 개선해 나갈 예정이다.

재난재해에 대응 가능한 보급형 실내 임시주거시설의 계획에 관한 연구 (A Study on the Planning of Suppliable Indoor Temporary Housing Facility that is Possible for Disaster)

  • Ju, Jaeseong;Park, Mijin
    • 한국재난정보학회 논문집
    • /
    • 제13권4호
    • /
    • pp.519-528
    • /
    • 2017
  • 국내에서도 홍수, 지진, 산사태, 화재 등의 다양한 재난재해로 인하여 이재민이 발생하고 있으며, 이 중 대다수가 이재민 임시주거시설로 대피하고 있다. 그러나 이재민 임시주거시설 내에서 개인공간을 확보할 수 있는 실내 임시주거시설의 배치와 성능에 관한 계획은 미비하다. 이에 이재민 임시주거시설 내 거주환경을 개선하기 위하여, 국민안전처에서 지정한 1인당 최소 수용면적 $3.3m^2$로 실내 임시주거시설의 모듈을 구축, 모듈의 배치계획을 진행하였으며, 실내 임시주거시설의 형태, 재료, 성능에 대한 평가 방향을 제시하였다.

The Performance Analysis to Identify the Reuse and Assembly Impact of Temporary Equipment

  • Bae, Sung-Jae;Park, Jun-Beom;Kim, Jung-Yeol;Kim, Young-Suk;Kim, Jun-Sang;Jo, Jae-Hun
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1252-1252
    • /
    • 2022
  • Temporary work that utilizes temporary equipment (e.g., system scaffold and system pipe support) in construction work is one of the most vulnerable work from a safety perspective in South Korea. Typically, temporary equipment is reused at construction sites. The Korea Occupational Safety and Health Agency announced guidelines regarding the performance standards for reusable temporary equipment to prevent the accidental collapse of temporary facilities. Nevertheless, temporary facilities' collapse still occurs, which could be attributed to a degradation in the performance due to the reuse of temporary equipment. Therefore, this study investigated the performance of simple temporary structures assembled with new and reused equipment. To this end, an experimental module was designed based on previous research cases, and two experimental models were constructed, in which one was assembled using new equipment (Model A), and the other was built using reused equipment (Model B). To determine the performance of each model, a load test was conducted to measure the maximum load that each model could withstand. The experimental results revealed that the maximum load of Model B was 15% lower than that of Model A. This indicates that there is a meaningful performance difference between those two models. Based on this result, the authors decided to perform additional tests with more realistic models than previous ones. The new experimental module was designed to ensure compliance with the Korean design guidelines. In this presentation, the authors show details of the first tests and their results and plan for the additional test.

  • PDF

영향요소 분석에 의한 고층건축공사의 가설계획시스템 개발 (Development of Temporary Facility Planning System for High-rise Building Constructions through the Analysis of Influence Factors)

  • 장명훈
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.164-173
    • /
    • 2002
  • 도심지 고층건축공사는 인접 건물과 도로에 의해 둘러 쌓여 있어 여유공간이 부족하고, 소음과 분진 등에 의한 문제가 발생한다. 이러한 문제들은 철저한 공사계획을 통해 여유공간을 효율적으로 활용하고, 공사 지원시설을 적절히 사용하는 가설계획을 통해 해결될 수 있다. 본 연구는 고층건축공사의 가설계획의 영향요소를 분석하고, 이를 활용한 가설계획의 대안 평가와 선정 방법을 제시하고 있다. 가설계획을 수립하는 과정에서 필요한 지식을 체계화하고 대안평가 방법을 적용하여 현장 관리자가 계획을 수립하는 과정을 지원할 수 있는 시스템을 구현하였다. 제안된 대안 평가 및 선정 방법과 구현된 시스템의 타당성을 검증하기 위해 사례 연구를 수행하였다.

  • PDF

재실 리모델링 공사 기간 중 공간구조와 쇼핑객 통행량의 상관성 변화 연구 - 코엑스 쇼핑몰을 대상으로 - (The Change of Relationship between Spatial Configuration and Pedestrian Movement during Inhabited Remodeling - Focused on Coex Shipping Mall -)

  • 김민수;김영욱
    • 대한건축학회논문집:계획계
    • /
    • 제35권9호
    • /
    • pp.11-18
    • /
    • 2019
  • Commercial facilities are put under construction for inhabited remodeling due to management or cost issues. Temporary facility planning is important in inhabited remodeling because building construction and management are simultaneously performed in this type of remodeling. The purpose of this research is to identify how the temporary spatial structure changes for each inhabited remodeling construction level of commercial facilities and existence of tenants affect the spatial usability. It also examines a relationship between the traffic flow and spatial configurations during the inhabited remodeling process where the tenants are temporarily removed and only the spatial configuration are maintained and verifies if the established theory that the spatial configurations in commercial facilities significantly affect the traffic is also valid during the inhabited remodeling process. The research result was found that the amount of traffic during the inhabited remodeling construction process is more affected by the factors such as tenants rather than spatial configurations. It is anticipated that the result of this research will serve as a guideline to establish logical inhabited remodeling plans for each level of constructing temporary facilities. Furthermore, it can be used to minimize the sales damage caused by the construction or as a guideline to determine the order of tenants to be moved into the new commercial facilities.

3-D Temporary Facility Visualization Using BIM(Building Information Modeling) Technology

  • Kim, Hyun-Joo;Ahn, Hong-Seob;Kim, Woo-Young
    • Journal of Construction Engineering and Project Management
    • /
    • 제1권2호
    • /
    • pp.37-42
    • /
    • 2011
  • The key role in safety management is to identify any possible hazard before it occurs by identifying any possible risk factors which are critical to risk assessment. It is well known that falsework (temporary facilities) in construction projects is fundamentally important. This planning/assessment process is considered to be tedious and requires a lot of attention due to the following reasons: firstly, the installation and dismantling of those facilities are one of the high risk activities in the job sites. Secondly, temporary facilities are generally not clearly delineated on the building drawings. Therefore, it is our strong belief that safety tools have to be simple and convenient enough for the jobsite people to manage them easily and be flexible for any occasions to be occurred at various degrees. In order to develop a safety identification system of temporary facilities, this research utilizes the BIM technology in retrieving important information by importing data from BIM models and use it in the safety planning stage.