Case Study for the Stability of Temporary Shoring Facilities at Inchon International Airport

가시설 안정성 검토에 관한 인천국제공항 시공 사례 연구

  • 최인걸 ((주)유신코퍼레이션 공항토목시설공사) ;
  • 조현모 ((주)유신코퍼레이션 공항토목시설공사) ;
  • 류승철 ((주)유신코퍼레이션 공항토목시설공사)
  • Published : 1999.03.01

Abstract

This case study has been prepared to provide the practical data about construction of temporary shoring facilities (i.e. braced sheet pile excavation) and to utilize the case study information effectively for design and construction of future facilities. This case study includes information such as 1) installing measurement devices to monitor the deformation of the sheet pile walls and the subsoil in the vicinity after establishing the criteria for the sheet pile deflection; 2) monitoring the actual movement of the temporary facility after setting up the survey control standard (due to the movement of the temporary facility) : 3) inspecting the suitability of the temporary facility construction: and 4) analyzing and studying the result of the tension test after installing ground anchors.

Keywords