International conference on construction engineering and project management
/
2013.01a
/
pp.1-6
/
2013
Concrete construction requires utilization of many temporary facilities such as formwork, shoring, and scaffolding. Appropriate use of these temporary facilities greatly impacts the quality, cost, schedule, and safety of concrete construction. The current practice in design and planning of temporary facilities is often manual, error-prone, and re-active based on construction site layout, status, and progress in the field. Early design and planning of temporary facilities for concrete construction using Building Information Modeling (BIM) technology offers a potential solution. Although some commercially-available software exists that assists in the generation of temporary facility designs, the construction industry lacks tools that support detailed planning and design of many other temporary facilities. This research presents our early work in automating the design and planning of temporary facilities utilizing BIM. Algorithms were developed to automatically assess geometric conditions of work space to detect required temporary facilities and design them. The proposed methodology was implemented in a test model. By automatically incorporating temporary facilities into BIM, more realistic construction models can be created with less effort and errors. Temporary facilities-loaded models can finally be used for communication, bill of materials, scheduling, etc. and as a benchmark for field installation of temporary formwork, shoring, and scaffolding systems.
This study intends to conduct a thorough research and analysis on the designated temporary residential facilities for the disaster victims in order to bridge the gap between the temporary residential facilities for the disaster victims in country and city, and understand the current status of the designated temporary residential facilities for the disaster victims in rural and urban areas. As a result, the designated temporary residential facilities for the disaster victims in urban areas are bigger and have higher capacity, implying the necessity to designate facilities in rural areas that can accommodate larger number of people. As to the analysis of the representative temporary residential facilities for the disaster victims in rural areas, different regions had different types of designated facilities and the number of facilities also showed big difference depending on regions. So it is believed that local governments should improve the process and system of designating temporary residential facilities for the disaster victims.
Proceedings of the Korean Geotechical Society Conference
/
1999.03a
/
pp.97-104
/
1999
This case study has been prepared to provide the practical data about construction of temporary shoring facilities (i.e. braced sheet pile excavation) and to utilize the case study information effectively for design and construction of future facilities. This case study includes information such as 1) installing measurement devices to monitor the deformation of the sheet pile walls and the subsoil in the vicinity after establishing the criteria for the sheet pile deflection; 2) monitoring the actual movement of the temporary facility after setting up the survey control standard (due to the movement of the temporary facility) : 3) inspecting the suitability of the temporary facility construction: and 4) analyzing and studying the result of the tension test after installing ground anchors.
Journal of the Korea Society of Computer and Information
/
v.25
no.6
/
pp.207-217
/
2020
The purpose of this study is to analyze the efficiency of Korean child welfare facilities using the DEA analysis method and to present policies. The input variables for the analysis of this data were the number of employees, the number of facilities, and the number of gardens, and the output variables were the current sources. The results of the study are as follows. As a result of CCR analysis, inefficient facilities were found to be temporary protection facilities and comprehensive facilities. As a result of BCC analysis, inefficient facilities were identified as temporary protection facilities. As a result of SE analysis, inefficient facilities were found to be temporary protection facilities. The suggestion is as follows. First, adjustment of the capacity of temporary protection facilities is required. Second, it is necessary to strengthen the professionalism of workers in child welfare facilities. Third, strengthen the expertise of the child welfare facility manager.
Korean Journal of Construction Engineering and Management
/
v.15
no.4
/
pp.77-85
/
2014
A construction temporary work is main process and importance trade section. It has many works and facilities such as temporary transfer equipments which tower crane, and lift, and architectural temporary facilities which temporary office, temporary warehouse, and site test laboratory, and construction temporary equipments which scaffoldings, work plates, construction supports, and forms to set and to use in under construction and to remove in the end. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study is organized existing technology systems and new technologies for field works, and developed breakdown structure of construction temporary technologies to be a basic of temporary technologies as review with site managers. For this, it will improve to be a knowledge and information system as a research of a performance and an availability about a construction temporary technology index.
Even in South Korea, disaster victims are suffering from various disasters such as floods, earthquakes, landslides, fires, and most of them have evacuated to temporary housing facilities for disaster victims. However, there are few plans for the placement and performance of indoor temporary housing facilities provided to secure private space in temporary housing facilities for disaster victims. In order to improve the living environment in the temporary housing facility of the victim, we constructed a module of minimum temporary accommodation area per person of 3.3 square meters, designated by the MPSS, and are proceeding with the module arrangement plan, Presented the evaluation direction of the form, material and performance of the indoor temporary housing facility.
International conference on construction engineering and project management
/
2022.06a
/
pp.1252-1252
/
2022
Temporary work that utilizes temporary equipment (e.g., system scaffold and system pipe support) in construction work is one of the most vulnerable work from a safety perspective in South Korea. Typically, temporary equipment is reused at construction sites. The Korea Occupational Safety and Health Agency announced guidelines regarding the performance standards for reusable temporary equipment to prevent the accidental collapse of temporary facilities. Nevertheless, temporary facilities' collapse still occurs, which could be attributed to a degradation in the performance due to the reuse of temporary equipment. Therefore, this study investigated the performance of simple temporary structures assembled with new and reused equipment. To this end, an experimental module was designed based on previous research cases, and two experimental models were constructed, in which one was assembled using new equipment (Model A), and the other was built using reused equipment (Model B). To determine the performance of each model, a load test was conducted to measure the maximum load that each model could withstand. The experimental results revealed that the maximum load of Model B was 15% lower than that of Model A. This indicates that there is a meaningful performance difference between those two models. Based on this result, the authors decided to perform additional tests with more realistic models than previous ones. The new experimental module was designed to ensure compliance with the Korean design guidelines. In this presentation, the authors show details of the first tests and their results and plan for the additional test.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.164-173
/
2002
The high-rise building construction field in the urban area is short of working space because it is surrounded by adjacent buildings and nearby roads. The insufficient space causes problems of interference and conflicts in transporting materials and working at the site. These problems can be resolved partly through the proper selection and layout of temporary facilities. A method proposed in this paper supports a decision-maker to evaluate and select the alternatives of temporary facilities plans by establishing and analyzing processes and influence factors of them. Knowledges considered in planning temporary facilities layout are structurized and a program is implemented for a field manager. Case studies are performed to evaluate the feasibility and applicability of the proposed method.
Journal of the Architectural Institute of Korea Planning & Design
/
v.35
no.9
/
pp.11-18
/
2019
Commercial facilities are put under construction for inhabited remodeling due to management or cost issues. Temporary facility planning is important in inhabited remodeling because building construction and management are simultaneously performed in this type of remodeling. The purpose of this research is to identify how the temporary spatial structure changes for each inhabited remodeling construction level of commercial facilities and existence of tenants affect the spatial usability. It also examines a relationship between the traffic flow and spatial configurations during the inhabited remodeling process where the tenants are temporarily removed and only the spatial configuration are maintained and verifies if the established theory that the spatial configurations in commercial facilities significantly affect the traffic is also valid during the inhabited remodeling process. The research result was found that the amount of traffic during the inhabited remodeling construction process is more affected by the factors such as tenants rather than spatial configurations. It is anticipated that the result of this research will serve as a guideline to establish logical inhabited remodeling plans for each level of constructing temporary facilities. Furthermore, it can be used to minimize the sales damage caused by the construction or as a guideline to determine the order of tenants to be moved into the new commercial facilities.
Journal of Construction Engineering and Project Management
/
v.1
no.2
/
pp.37-42
/
2011
The key role in safety management is to identify any possible hazard before it occurs by identifying any possible risk factors which are critical to risk assessment. It is well known that falsework (temporary facilities) in construction projects is fundamentally important. This planning/assessment process is considered to be tedious and requires a lot of attention due to the following reasons: firstly, the installation and dismantling of those facilities are one of the high risk activities in the job sites. Secondly, temporary facilities are generally not clearly delineated on the building drawings. Therefore, it is our strong belief that safety tools have to be simple and convenient enough for the jobsite people to manage them easily and be flexible for any occasions to be occurred at various degrees. In order to develop a safety identification system of temporary facilities, this research utilizes the BIM technology in retrieving important information by importing data from BIM models and use it in the safety planning stage.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.