• Title/Summary/Keyword: temporary

Search Result 2,670, Processing Time 0.035 seconds

A Study on Structural Performance by Condition Grade of Temporary Equipment (가설기자재 상태등급별 구조성능에 관한 연구)

  • Moon, Seong-Oh;Mo, Seung-Un;Youn, Ye-Bin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.16-17
    • /
    • 2020
  • The Temporary construction refers to the construction or dismantling of temporary structures installed for the construction of the main structure at the construction site, and the members constituting this temporary facility are called temporary equipment. Temporary equipment used in construction sites is mostly used products that are reused rather than new products, and it is necessary to consider performance degradation due to repeated use. This study is a preliminary study to develop the performance evaluation criteria applied to temporary equipment that is distributed and reused for secondhand. This study is to analyze the performance status of temporary equipment of used goods owned by rental companies by condition grade through performance tests.

  • PDF

BIM-BASED PLANNING OF TEMPORARY FACILITIES FOR CONCRETE CONSTRUCTION

  • Kyungki Kim;Jochen Teizer
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.1-6
    • /
    • 2013
  • Concrete construction requires utilization of many temporary facilities such as formwork, shoring, and scaffolding. Appropriate use of these temporary facilities greatly impacts the quality, cost, schedule, and safety of concrete construction. The current practice in design and planning of temporary facilities is often manual, error-prone, and re-active based on construction site layout, status, and progress in the field. Early design and planning of temporary facilities for concrete construction using Building Information Modeling (BIM) technology offers a potential solution. Although some commercially-available software exists that assists in the generation of temporary facility designs, the construction industry lacks tools that support detailed planning and design of many other temporary facilities. This research presents our early work in automating the design and planning of temporary facilities utilizing BIM. Algorithms were developed to automatically assess geometric conditions of work space to detect required temporary facilities and design them. The proposed methodology was implemented in a test model. By automatically incorporating temporary facilities into BIM, more realistic construction models can be created with less effort and errors. Temporary facilities-loaded models can finally be used for communication, bill of materials, scheduling, etc. and as a benchmark for field installation of temporary formwork, shoring, and scaffolding systems.

  • PDF

A Basic Study for the Restoration of Noryang Temporary Palace (노량행궁의 복원을 위한 기초연구)

  • Koo, Uk-Hee
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.5
    • /
    • pp.109-118
    • /
    • 2018
  • Noryang Temporary Palace was a place where king Jeongjo (1752-1800) would have lunch after crossing the Temporary Palace River on his way to Hwaseong Temporary Palace to worship at Hyeonryungwon, the tomb of his father, Sadoseja. The government offices in charge of ship bridge construction 'Jugyosa' and 'Byeoljangso' were located in the Temporary Palace. The central buildings of the Haenggung Palace, which ranged up to Yongyangbongjeojeong, were arranged to observe both 'Jugyosa' and 'Byeoljangso' from the Temporary Palace by lifting the ground from Sammun Gate to Yongyangbongjeojeong. Yongyangbongjeojeong, the center of Noryang Temporary Palace, features the style of royal palace architecture and functions of housing architecture. The 'Jugyosa' and 'Byeoljangso' buildings had eight quarters. According to the records, in addition, 15 wood sheds, 5 rice hubs, 3 barns, 1 side gate quarter, 1 front gate, 70 separate sheds, 2 suragan temporary buildings, oesammun gate and hongsalmun gate were found. Such architectural layout is matched with the Temporary Palace Jugyohwaneodo Painting.

Analysis on the Problems of Construction Temporary Work through Review on Technology System

  • Park, Junmo;Kim, Okkyue;Kim, Jinlee;Lim, NamGi
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.716-717
    • /
    • 2015
  • A construction temporary work is main process and importance trade section. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study reviews literature researches and can verify that changes to a comprehensive technology system for construction site. In addition, it suggests a breakdown structure of new standards for temporary construction technology based on views of construction site managers. Meanwhile, temporary construction technology in Korea has changed with a specification of construction temporary work which had been revised in 2014. However, the revision is merely dividing the design and building off of construction temporary technology. It is lacking in many ways to change this in a new standard system for temporary construction technology. Henceforth, it needs to develop a standard system for temporary construction technology and a professional system that is appropriate for different purposes by detail trade sections.

  • PDF

Development on Breakdown Structure of Construction Site centered Construction Temporary Technology Index (현장중심의 건설가설기술요소 분류체계 구축)

  • Park, Junmo;Kim, Okkyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.77-85
    • /
    • 2014
  • A construction temporary work is main process and importance trade section. It has many works and facilities such as temporary transfer equipments which tower crane, and lift, and architectural temporary facilities which temporary office, temporary warehouse, and site test laboratory, and construction temporary equipments which scaffoldings, work plates, construction supports, and forms to set and to use in under construction and to remove in the end. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study is organized existing technology systems and new technologies for field works, and developed breakdown structure of construction temporary technologies to be a basic of temporary technologies as review with site managers. For this, it will improve to be a knowledge and information system as a research of a performance and an availability about a construction temporary technology index.

Development of Technical Breakdown Structure Standard in Temporary Works (건설가설공사의 표준기술분류체계 구축)

  • Park, Jun-Mo;Kim, Ok-Kyue;Park, Gil-Bum
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.162-163
    • /
    • 2013
  • A temporary work are lifting equipment that tower crane or lift, and temporary architectures that office building and storage in construction site. And it is main construction work that built and used temporarily like to a scaffolding, a walk plate, and a formwork. This study is to adjust breakdown structure of temporary work to introduce technical tendency. With a site manager, it is collected a detailed statement and compared. As a result to break down a tendency that temporary equipment, additional function, and direct work of temporary technique, first, existing detail technical indexes that group I, group J, group K, and group L are classified. Second, due to set up and manage to main agents in case of existing detail technical indexes that B1, B2, it is not wrong to classify. But, it is somewhat different, and therefore adjust it to same level. Finally, as a technical tendency that temporary equipment, additional function, and direct work of temporary technique, it is adjusted the others.

  • PDF

A Study on the Prevention and Extinguishment of Fire in Vinyl Temporary Buildings for Agriculture and Fishery (농·어업용 Vinyl 가설건축물의 화재 예방 및 진압에 관한 연구)

  • Bong-Woo Lee;Kyong-Jin Park
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.26 no.4_2
    • /
    • pp.599-603
    • /
    • 2023
  • Analyzed in the NFDS, The average number of fires in vinyl temporary buildings is more than 1,000 in annually. And the number of deaths and injuries was around 30 people in every year. According to the National Fire Agency, There are 142,386 vinyl temporary buildings for Agriculture and Fishery, of which 4,720 are residential vinyl temporary buildings in illegally. Model house is subject to regulation in fire-related law. But, even though it's the same temporary building, Vinyl temporary building is not subject to regulation. For this reason, Vinyl temporary buildings are left in the blind spot of fire safety. Therefore, In this study, We propose that amend of Act on installation and management of firefighting systems, make of temporary fire safety controller, develop and apply of alarm system that is connected to a single-alarm smoke dretector, organize and operate volunteer fire brigade of the crop group to prevent and extinguish the fire.

The Performance Analysis to Identify the Reuse and Assembly Impact of Temporary Equipment

  • Bae, Sung-Jae;Park, Jun-Beom;Kim, Jung-Yeol;Kim, Young-Suk;Kim, Jun-Sang;Jo, Jae-Hun
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1252-1252
    • /
    • 2022
  • Temporary work that utilizes temporary equipment (e.g., system scaffold and system pipe support) in construction work is one of the most vulnerable work from a safety perspective in South Korea. Typically, temporary equipment is reused at construction sites. The Korea Occupational Safety and Health Agency announced guidelines regarding the performance standards for reusable temporary equipment to prevent the accidental collapse of temporary facilities. Nevertheless, temporary facilities' collapse still occurs, which could be attributed to a degradation in the performance due to the reuse of temporary equipment. Therefore, this study investigated the performance of simple temporary structures assembled with new and reused equipment. To this end, an experimental module was designed based on previous research cases, and two experimental models were constructed, in which one was assembled using new equipment (Model A), and the other was built using reused equipment (Model B). To determine the performance of each model, a load test was conducted to measure the maximum load that each model could withstand. The experimental results revealed that the maximum load of Model B was 15% lower than that of Model A. This indicates that there is a meaningful performance difference between those two models. Based on this result, the authors decided to perform additional tests with more realistic models than previous ones. The new experimental module was designed to ensure compliance with the Korean design guidelines. In this presentation, the authors show details of the first tests and their results and plan for the additional test.

  • PDF

Development of Individual Temporary Equipment Material/Quality/Delivery Management Standards(Guide) for Temporary Equipment Rental Company (가설기자재 임대업체를 위한 개별 가설기자재 자재/품질/납품관리 기준(Guide) 개발)

  • Lee, Junho;Kim, Junsang;Yoou, Geonhee;Cho, Sehyun;Kim, JungYeol;Kim, Youngsuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.1
    • /
    • pp.62-72
    • /
    • 2024
  • Due to the distribution structure of domestic temporary equipment, quality control of temporary equipment is essential because more than 80% of temporary equipment is repeated and reused. Due to this importance, the Ministry of Land, Infrastructure and Transport has proposed quality management standards for temporary equipment for 10types of temporary equipments, including steel pipe support, but the overall quality of temporary eqipment cannot be confirmed because the quality is managed through sampling quality tests. In addition, although quality control standards exist for temporary material rental company, practical utilization was investigated and analyzed to be very low as they are mainly presented based on qualitative inspection standards by visual inspection. Therefore, the purpose of this study is to develop individual temporary material/quality/delivery management standards (Guides) for temporary equipment rental company to preemptively secure the quality of temporary equipment before bringing them into the construction site. If the standards developed through this study are applied to domestic temporary equipment rental companies, it is expected that high-quality temporary equipment with secured quality will be brought into the construction site as the quality of temporary equipment quality of domestic medium and small temporary equipment rental companies is improved safety accidents related to temporary structures.

Recognition on technical skills of temporary resin jacket of dental hygienist (치과위생사의 임시치관제작 기술 숙련에 대한 인식도)

  • Kim, Kyung-Won;Kim, Gwang-Hui
    • Journal of Korean society of Dental Hygiene
    • /
    • v.9 no.4
    • /
    • pp.559-568
    • /
    • 2009
  • Objectives : In order to manage to reformative tendency of the educational whole with change request of dental hygienics education which is diversificated and professionalized the manufacturing practice of a temporary resin jacket which is educated with from much dental hygiene is become accomplished, so far also the recognition which relates with the manufacturing practice of a temporary resin jacket of dental hygiene students there is not researched. The present research carried out the practice evaluation with the target of students of a dental hygiene department, who finished a manufacturing practice of a temporary resin jacket, analyzed and investigated the material, reported its result, and enforced a research. Methods : This research selected students of 6 dental hygiene departments located in the Daegu Gyeongbuk region, who have manufacturing experience of a temporary resin jacket, by a convenient sampling method, and then a questionnaire was executed by a self-administration method, and a total of 290 copies were statistically treated. The content of the questionnaire are composed of 2 questions on an attitude survey before and after manufacturing practice of a temporary resin jacket, 3 questions on an educator for practice of a temporary resin jacket, 7 questions on recognition of technical skills for manufacturing a temporary resin jacket, 9 questions on the practice content evaluation of manufacturing of a temporary resin jacket and recognition on manufacturing practice of a the temporary resin jacket. Results : 1. The average of recognition on technical skills for manufacturing a temporary resin jacket of a dental hygienist was 3.82 points, the average of evaluation on practice content of manufacturing a temporary resin jacket being 3.75 points, and the average of recognition on the practice of manufacturing a temporary resin jacket was 3.71 points. 2. Currently, as the educator for the practice of manufacturing a temporary resin jacket, dental hygienists were 188 persons(64.8%) and dental technicians was 102 persons(35.2%), and as educators they want in the future, dental hygienists were 97 persons(33.3%) and dental technicians was 193 persons(66.7%). Persons hoping reeducation for manufacturing a temporary resin jacket were 219 persons(85.9%). 3. There was a significant difference in consciousness of students before and after practice of manufacturing a temporary resin jacket(p<.001). 4. There was a significant difference in practice evaluation and practice recognition according to the educational subject(p<.001). 5. There was a significant reverse correlation in the educational subject, practice evaluation and practice recognition(p<0.01). Conclusions : The practice for manufacturing a temporary resin jacket in education of dental hygiene is necessary to improve job performance ability in more various and specialized dental treatment and to solve desire for improvement of professional technical skill ability of students, and accordingly. About study process of the future students observation investigation or student objective interview investigation etc. seeks a problem in the become research lead, the succeeding research which gropes the plan which is the possibility of solving the problem which discovered is thought will be necessary.

  • PDF