유전자 알고리즘을 이용한 닐센아치교의 최적설계기법을 이 논문에서 제시하였다. 설계 매개변수로는 닐센아치교의 아치-라이즈비와 강중비에 대해서 최적화기법을 적용하여 각각의 거동을 분석하고, 적정성을 평가하여 최적의 매개변수 값을 결정하였다. 매개변수의 결정은 구조물의 안전성과 사용성 그리고 경제성에 중요한 설계인자로서 정형화가 요구된다. 이를 위해 최적화 기법으로 전역 최적해 탐색능력이 우수한 유전자 알고리즘을 사용하였으며, 설계 목적함수로는 구조물의 총 중량을 사용하였고, 제약조건으로는 변위, 응력, 시공성 제약조건을 두었다. 구조해석은 미소변위이론에 의한 탄성해석을 수행하여 유전자 알고리즘과 조합하여 병렬연산으로 수행시간을 단축시켰다. 이 연구에서 개발된 최적설계기법을 사용하여 최적의 아치-라이즈비와 강중비, 최적설계영역을 제시 하였으며 실무에 적용할 수 있도록 하였다.
Purpose: This study, by comprehensively the characteristics of new Hanok application techniques with the proposed site application technology in the course of the design changes that have been accumulated through Hanok technology development the second stage business, by analyzing the range of reflection, new Considering the direction reflects the efficiency of the new Hanok application techniques. Method: new Hanok application technology, it was been established through research and development of large 1 new Hanok technology it has been proposed through the "site-specific application techniques" and 2 builders and designers "space-time proposed technique" Analysis of the case, at the center of the design changes, the land the body of laws and regulations, the requirements of the public buildings, compared to the construction method and the like for the reduction of construction costs, new Hanok applied technology in the process of change by it There was analyzed whether acceleration on the range and step which is reflected in the design Result: The result of new Hanok applied technology was built through the demonstration build business case, process another major technology, foundation, woodwork, walls, roof, has been reflected in the ceiling construction, the inclusion of items in the proposed technique of construction , it was applied to the main steps in general, except for other construction work landscaping. Application techniques and construction proposal technology research team has presented, show the difference between the scope and method. With significance effort to improve the unreasonable traditional methods of these core processes that can be reflected in the field repeated the construction proposed technique as a result of the utility that can be applied for substantial construction.
Earth Anchor method as a supporting system is widely used in the large scale deep excavation of urban areas or slope excavation project. Considering the application frequency of that method and catastrophe of that method under unproper construction management, we can find out many problems relevant to the domestic design and construction management of earth anchor method. When we encounter the cases of rapid increments and various decrements in earth anchor axial forces, considering the characteristic of earth anchor method, it is an essential point to catch the reasons and to prepare countermeasures. This article introduces two actual monitoring examples based on the close analyses of measured data in a typical large scale deep excavation project and slope excavation project. One is a rapidly increasing case of earth anchor axial forces with the continuous advance of incremental deformation in a geological layer interface. And another is a decreasing case of earth anchor axial forces with the construction conditions. The effort of this article aims to improve and develop the technique of design and construction in the coming projects having similar ground condition and supporting method.
강구조물의 강성설계법을 실용적인 변위조절법인 구조물량재분배기법과 강도설계법을 결합하여 개발하였다. 본 연구에 사용된 재분배기법은 최적화기법에 의하여 유도되었으며, 최적화문제의 에너지이론에 근거한 부재변위기여도를 이용하여 정식화되었다. 이러한 재분배기법에 의한 변위조절은 설계민감도계수의 계산 그리고 구조재해석을 필요로 하지 않는 특성을 가지고 있다. 변위조절을 위한 구조물량의 재분배에 의한 부재응력의 재분배 효과는 허용응력설계법에 준한 강도설계모듈에 의하여 조절되었다. 개발된 강성설계법을 3차원 트러스 구조물의 설계에 적용하였다.
양산 부산대학교병원 건립공사는 종합병원 의료타운 신축 프로젝트이다. 계획단계부터 건설사업관리자(CMr)가 참가하여 설계 시공일괄사업자를 선정한 후, 실시설계 진행과정을 거쳐 시공단계, 시공이후단계에 이르기까지 프로젝트의 모든 단계에 건설사업관리(CM) 업무를 일관적으로 적용한 사례이다. 또한 설계와 시공의 추진에 Fast Track을 도입하여 공기단축에 성공한 것에 그 의미를 찾을 수 있다. 본 사례는 설계 이전단계에 설계시공일관업체를 선정하였으며, Fast Track수법의 적용을 염두에 둔 설계 및 공사일정계획, 설계단계의 설계관리, Fast Track에 입각한 단계별 공사발주 및 계약관리, 기본설계 실시설계단계의 VE 수행, 시공단계에서의 설계변경 관리, 시공 후 유지관리 단계의 운용관리 등 건설사업관리 업무가 모든 단계에서 다각적으로 제공되었다. 본 보고에서는 상기와 같은 건설사업관리 적용상의 과제와 개선방향, 특히 설계 시공일괄사업에서 효율적으로 CM 업무를 수행할 수 있는 방안을 제시하여, 초대형 턴키(Turnkey) 프로젝트의 CM적용에 기여하고자 한다.
The engine excitation forces are considered as major vibration source for the forklift truck, especially in small class. Even though the current engine mounting system designs are acceptable for vibration isolation, the performance of the engine mounting system is still required for the tendency of light weight, higher power and driver's higher vibration requirement. In this paper vibration reduction technique of forklift engine which is supported on rubber mounts is presented. Based on the dynamic model of resilient engine mounting system, design evaluation program is established. The design optimization technique and evaluation method of system properties are discussed. Effects of optimal design are validated through comparison with test results.
In the last several decades of 20 century, the user oriented design concept has evolved in more concrete ways, producing POE and UPD(User Participated design). These concepts are ways of achieving the fit between built environments and human needs. These, technique in the digital world has implied and promoted lots of experimental ways to interact with possible users before the construction stages in the design process to reduce the results, stemming from ineffective planning and designing. The purpose of this paper is to show an evaluation technique in the design cycle. An actually designed child care facility was evaluated before construction by potential users. For this purpose, focused group interview was employed.
This paper describes typical design and construction practice for in-situ ground reinforcement technique using improved steel pipe pressure grouting. A case history is presented to illustrate the benefit gained by application of the technique. This technique was applied to cut slopes developed in the construction of auxiliary spillway of 00 dam. Applicable conditions, method of survey, slope stability analysis and construction are given in this parer. As for the construction method, a procedure is given and the main points are the control of construction work. As a result of the pull-out test, it is shown that seel pipe nailing is particularly useful for stabilizing rock slope.
The 3th International Conference on Construction Engineering and Project Management
/
pp.1307-1312
/
2009
Design is an act based on multidisciplinary information. The involvement of various stakeholders makes it difficult to process, plan, and integrate. Iteration is frequent in most of the engineering design and development projects including construction. Design iterations cause rework, and extra efforts are required to get the optimal sequence and to manage the projects. The simple project management techniques are insufficient to fulfill the requirements of integrated design. This paper entails two things: design structure matrix and design parameters' information based model. The emphasis has been given to optimal sequence and crucial iteration using design structure matrix analysis technique. The design projects have been studied using survey data from industry. The optimal sequence and crucial iterations results have been utilized for proposed model. Model integrates two things: information about produced- required key design parameters and information of design changes during the design process. It will help to get familiar with Design management in order to fulfill contemporary needs.
The study figures out the alternatives of training BIM design experts which is the biggest obstacle in training manpower of professional BIM designer, the largest problem when the plant introduce BIM design about the change in Construction Environment by Equipment Based BIM Design in reality of design followed by equipment based BIM design, education institution plan. BIM is the system which is built to make these information be used easier and technique which enables design construction and maintenance in 3-dimensional virtual space by designing buildings in 3-dimensional space, and by data-basing the generated information of every life-cycle information. As the essential contents of the study, educational institutions with the public authority should invest the opening of educational programs, recruit of experts and development of textbooks from a long-term perspective. And also, the role of public institution is important above all for the development of construction industry.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.