• Title/Summary/Keyword: system scaffold

Search Result 124, Processing Time 0.045 seconds

A Study on Real-Time Defect Detection System Using CNN Algorithm During Scaffold 3D Printing (CNN 알고리즘을 이용한 인공지지체의 3D프린터 출력 시 실시간 출력 불량 탐지 시스템에 관한 연구)

  • Lee, Song Yeon;Huh, Yong Jeong
    • Journal of the Semiconductor & Display Technology
    • /
    • v.20 no.3
    • /
    • pp.125-130
    • /
    • 2021
  • Scaffold is used to produce bio sensor. Scaffold is required high dimensional accuracy. 3D printer is used to manufacture scaffold. 3D printer can't detect defect during printing. Defect detection is very important in scaffold printing. Real-time defect detection is very necessary on industry. In this paper, we proposed the method for real-time scaffold defect detection. Real-time defect detection model is produced using CNN(Convolution Neural Network) algorithm. Performance of the proposed model has been verified through evaluation. Real-time defect detection system are manufactured on hardware. Experiments were conducted to detect scaffold defects in real-time. As result of verification, the defect detection system detected scaffold defect well in real-time.

Bio-degradable 3D-scaffold fabrication using rapid-prototyping system (쾌속조형시스템을 이용한 생체 조직 재생용 지지체 제작과 특성분석)

  • Kim, Ji-Woong;Park, Ko-Eun;Lee, Jun-Hee;Park, Su-A;Kim, Wan-Doo
    • Proceedings of the KSME Conference
    • /
    • 2008.11a
    • /
    • pp.1697-1699
    • /
    • 2008
  • The purpose of tissue engineering is to repair or replace damaged tissues or organs by a combination of cells, scaffold, suitable biochemical and physio-chemical factors. Among the three components, the biodegradable scaffold plays an important role in cell attachment and migration. In this study, we designed 3D porous scaffold by Rapid Prototyping (RP) system and fabricated layer-by-layer 3D structure using Polycarprolactone (PCL) - one of the most flexible biodegradable polymer. Furthermore, the physical and mechanical properties of the scaffolds were evaluated by changing the pore size and the strand diameter of the scaffold. We changed nozzle diameter (strand diameter) and strand to strand distance (pore size) to find the effect on the mechanical property of the scaffold. And the surface morphology, inner structure and storage modulus of PCL scaffold were analyzed with SEM, Micro-CT and DMA.

  • PDF

Automatic design, planning and drawing of scaffolding system for constructions

  • Hara, Takashi;Shimomura, Katsukiyo;Hamano, Keita;Miyake, Shoko
    • Advances in Computational Design
    • /
    • v.4 no.2
    • /
    • pp.179-196
    • /
    • 2019
  • Temporary scaffold systems in the construction site play an important role for ensuring the safety of the workers and for constructing the stable structures. To assemble the scaffold, the pipe scaffolding system, the wedge binding scaffolding system and the particular materials have been utilized. To design the material arrangement of a scaffold, firstly the configuration was determined considering the construction geometry. Then, the strength of the scaffold was confirmed and the quantity of the material was accounted. In this paper, the design method of the temporary scaffold was proposed for intending the semi-automatic procedure. In the proposed design method, the geometric design and the safety requirement were specified by the safety standard and the design flow was followed by the designer's knowledge. The size and the quantities of the materials were calculated by referring to the relation between the scaffold and the constructing structure. In the calculating procedure, three dimensional positions of each scaffold materials were calculated and recorded simultaneously. Then, three dimensional scaffold structural was drawn semi-automatically on the CAD software by using the obtained material sizes, positions and directions. The proposed design method provides us the precise quantities of scaffold materials and enables us to reduce the design effort and the cost estimation processes. In addition, the obtained results can be applied to BIM software after converting to IFC format.

Development of Scaffold Fabrication System using Multi-axis RP Software Technique (다축 RP 소프트웨어 기술을 이용한 스캐폴드 제조 장비 개발)

  • Park, Jung-Whan;Lee, Jun-Hee;Cho, Hyeon-Uk;Lee, Su-Hee;Park, Su-A;Kim, Wan-Doo
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.29 no.1
    • /
    • pp.33-40
    • /
    • 2012
  • The scaffold serves as 3D substrate for the cells adhesion and mechanical support for the newly grown tissue by maintaining the 3D structure for the regeneration of tissue and organ. In this paper, we proposed integrated scaffold fabrication system using multi-axis rapid prototyping (RP) technology. It can fabricate various types of scaffolds: arbitrary sculptured shape, primitive shape, and tube shape scaffolds by layered dispensing biocompatible/ biodegradable polymer strands in designated patterns. In order to fabricate the 3D scaffold, we need to generate the plotting path way for the scaffold fabrication system. We design a data processing program - scaffold plotting software, which can convert the 3D STL file, primitive and tube model images into the NC code for the system. Finally, we fabricated the customized 3D scaffolds with high accuracy using the plotting software and the fabrication system.

Developing a Safety Scaffold Monitoring System Using Wireless Sensor Network Technology

  • Tserng, H. Ping;Huang, Hung-Jui;Li, Xin-Yan;Huang, Han-Tang
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.324-327
    • /
    • 2015
  • Scaffold is the most commonly used equipment in various types of construction works. Since various types of construction works use the same scaffold equipment, it becomes more difficult to be controlled and managed, thus resulting hazard frequently. According to the information announced in July 2012 by Council of Labor Affairs Executive Yan, the site collapse or incomplete anti-falling protection has led the site to accident frequently, and this is the main reason that causes construction industry occupational disasters. The labor death occupational hazard ratio rises up to 13% in scaffold activity, and the Council of Labor Affairs Executive Yan has showed that the death ratio is higher when using the scaffold in construction site, the total number of death has reached to 139 from 2005 to 2010. In order to ensure the safety of scaffold user, this study tends to build a wireless sensor monitoring system to detect the reliability and safety of the scaffold. The wireless sensor technique applies in this study is different with the traditional monitoring technique which is limited with wired monitoring. Wireless sensor technique does not need wire, it just needs to consider the power supply for establishing the network and receiving stable information, and it can become a monitoring system. In addition, this study also integrates strain gauge technique in this scaffold monitoring system, to develop a real-time monitoring data transfer mechanism and replace the traditional wired single project monitoring equipment. This study hopes to build a scaffold collapse monitoring system to effectively monitor the safety of the scaffold as well as provide the timesaving installation, low-cost and portable features.

  • PDF

Fabrication of Blended PCL/β-TCP Scaffolds by Mixture Ratio of β-TCP using Polymer Deposition System (폴리머 적층 시스템을 이용한 β-TCP 혼합 비율에 따른 PCL/β-TCP 인공지지체의 제작)

  • Ha, Seong-Woo;Kim, Jong Young
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.31 no.9
    • /
    • pp.791-797
    • /
    • 2014
  • Abstract Scaffold used as a carrier of the cell has been actively conducted using plenty of technology in tissue engineering. ${\beta}$-tricalcium phosphate (${\beta}$-TCP) material has shown good biocompatibility and osteoconductive ability when it was implanted as a bone graft substitute in osseous defect in human and animal studies for bone regeneration. In this study, we fabricated the blended polycaprolactone (PCL) and ${\beta}$-TCP scaffold by the polymer deposition system (PDS). The PCL/${\beta}$-TCP scaffold was fabricated at a temperature of $110^{\circ}C$, pressure of 650 kPa, and scan velocity of 100 mm/sec. The Overall geometry and size of the scaffold were fixed circle type with a diameter of 10 mm and a height of 4 mm. PCL/${\beta}$-TCP scaffold was observed by scanning electron microscopy. Cell attachment and proliferation of the scaffold containing 30 wt% ${\beta}$-TCP was superior to those containing 10 wt% and 20 wt% ${\beta}$-TCP.

Study on stability and design guidelines for the combined system of scaffolds and shores

  • Peng, Jui-Lin;Wang, Chung-Sheng;Wang, Shu-Hong;Chan, Siu-Lai
    • Steel and Composite Structures
    • /
    • v.35 no.3
    • /
    • pp.385-404
    • /
    • 2020
  • Since the scaffold is composed of modular members, the total height of multi-story scaffolds does not often meet with the headroom of construction buildings. At this time, other supporting members need to be set up on the top of scaffolds. However, the mechanical behaviors of the combined system of scaffolds and other supporting members have seldom been discussed. This study explores the stability of the combined system of scaffolds and shores. The loading tests conducted in the laboratory show that the critical load of the combined system of two-story scaffolds and wooden shores is about half that of the three-story scaffold system with the same height. In the failure of both the "scaffold system" and the "combined system of scaffolds and shores' after loading, the deformation mainly occurs in the in-plane direction of the scaffold. The outdoor loading test shows that no failure occurs on any members when the combined system fails. Instead, the whole system buckles and then collapses. In addition, the top formwork of the combined system can achieve the effect of lateral support reinforcement with small lateral support forces in the outdoor loading test. This study proposes the preliminary design guidelines for the scaffolding structural design.

Performance Improvement of Polymer Deposition System by Nozzle Guide and Its Application to Washer Scaffold Fabrication (노즐 가이드를 적용한 폴리머 적층 시스템의 Washer Scaffold 제작을 위한 성능 개선)

  • Sa, Min-Woo;Kim, Jong Young
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.37 no.3
    • /
    • pp.249-257
    • /
    • 2013
  • Rapid prototyping was used to design and develop a three-dimensional (3D) scaffold for tissue engineering application. In this study, the nozzle guide (TB-CP-HN, MUSASHI ENGINEERING, INC., JAPAN) used with the syringe of the polymer deposition system (PDS) was evaluated by measuring the scaffold line width and height. 3D scaffolds were fabricated using a biodegradable polymer called poly-caprolactone (PCL). The PCL polymer can be deposited from the needle of a syringe using a 200-${\mu}m$ precision nozzle, at a pressure of 600 kPa and temperature of $125^{\circ}C$. The advantages and improvements in this nozzle guide were addressed through washer scaffold fabrication. Overall, this research indicated that the fabrication of a complex-shaped scaffold using an enhanced polymer deposition system may have potential for tissue engineering.

Fabrication of Tailor-Made 3D PCL Scaffold Using a Bio-Plotting Process (바이오-플로팅시스템을 통한 Tailor-Made 3D PCL Scaffold 제작)

  • Son, Joon-Gon;Kim, Geun-Hyung;Park, Su-A;Kim, Wan-Doo
    • Polymer(Korea)
    • /
    • v.32 no.2
    • /
    • pp.163-168
    • /
    • 2008
  • Biomedical scaffold for tissue regeneration was fabricated by one of rapid prototyping processes, bioplotting system, with a biodegradable and biocompatible poly($\varepsilon$-carprolactone)(PCL). Through dynamic mechanical test, it was observed that the PCL scaffold manufactured by the bioplotting process has the superior mechanical properties compared to the conventional scaffold fabricated by a salt-leaching process, and the plotted scaffold could be employed as a potential scaffold to regenerating hard and soft tissue. The plotted scaffold was consisted of porous structures. which were interconnected with each pore to help cells be easily adhered and proliferated in the wall of pore tunnels, and metabolic nutrients can be transported within the matrix. By using the plotting system, we could adjust the pore size, porosity, strand pitch, and, strand diameter of PCL scaffolds, which were important parameters to control mechanical properties of the scaffolds, and consequently we could determine that the mechanically controlled scaffolds could be used as a matching scaffold for any required mechanical properties of the target organ. The fabricated 3D PCL scaffold showed enough possibility as a 3D biomedical scaffold, which was cell-cultured with chondrocytes.

Load-carrying capacities and failure modes of scaffold-shoring systems, Part I: Modeling and experiments

  • Huang, Y.L.;Chen, H.J.;Rosowsky, D.V.;Kao, Y.G.
    • Structural Engineering and Mechanics
    • /
    • v.10 no.1
    • /
    • pp.53-66
    • /
    • 2000
  • This paper proposes a simple numerical model for use in a finite analysis (FEA) of scaffold-shoring systems. The structural model consists of a single set of multiple-story scaffolds with constraints in the out-of-plane direction at every connection joint between stories. Although this model has only two dimensions (termed the 2-D model), it is derived from the analysis of a complete scaffold-shoring system and represents the structural behavior of a complete three-dimensional system. Experimental testing of scaffolds up to three stories in height conducted in the laboratory, along with an outdoor test of a five-story scaffold system, were used to validate the 2-D model. Both failure modes and critical loads were compared. In the comparison of failure modes, the computational results agree very well with the test results. However, in the comparison of critical loads, computational results were consistently somewhat greater than test results. The decreasing trends of critical loads with number of stories in both the test and simulation results were similar. After investigations to explain the differences between the computationally and experimentally determined critical loads, it was recommended that the 2-D model be used as the numerical model in subsequent analysis. In addition, the computational critical loads were calibrated and revised in accordance with the experimental critical loads, and the revised critical loads were then used as load-carrying capacities for scaffold-shoring systems for any number of stories. Finally, a simple procedure is suggested for determining load-carrying capacities of scaffold-shoring systems of heights other than those considered in this study.