To improve the cost performance of construction sites, various systems and standards are constantly being developed and implemented. Although legal requirements for these system and standard improvements have been increasing, the cost efficiency performance of construction sites remains stagnant. We have digitized documents generated through construction supervision work at 39 building construction sites and proposed a model that can support decision-making in cost efficiency evaluation. This model selects key keywords that are considered to be highly related to cost efficiency by identifying the patterns and relationships of keywords through associated rule analysis and social network analysis using keywords derived from documents. In addition, it is expected to be used as a decision-making aid to determine the cost efficiency of a specific building construction site by establishing a logistic regression model using core keywords. As a systematic database of construction supervision documents and an integrated system of massive data generated by digital technology are established in the future, the accuracy and reliability of the cost efficiency evaluation model are expected to be reinforced.
공사감리문서는 프로젝트의 수행과정을 제3의 독립적인 위치에서 모니터링한 종합적인 점검의견이라는 주요한 비정형 정보를 제공할 수 있다. 이와 같은 비정형 정보는 최근 분석방법론의 고도화에 따라 다양한 시사점을 제공할 수 있는 유의미한 자료로 평가받고 있다. 이에 본 연구는 건축공사의 최종 감리보고서 내 비정형 데이터를 대상으로 다양한 방법론을 활용하여 비용성과를 평가할 수 있는 프레임워크를 제시하였다. 세부적으로는 텍스트마이닝과 사회연결망분석을 통해 감리보고서 내 주요 키워드들을 도출하고, 해당 데이터들을 이항 로지스틱 회귀분석을 통해 분석하여 비용성과를 평가하였다. 그 결과, 감리보고서 내 비정형 데이터를 이용하여 추정된 비용성과 예측 정확도는 약 73% 수준으로 높게 도출되었다. 본 연구의 결과는 향후 건설산업에서 발생되는 다양한 비정형 데이터의 분석을 위한 기초자료로 활용이 가능할 것으로 예상된다.
건축감리는 시공과정을 관리·감독하여 고품질의 결과물 창출을 지원하는 주요 업무단계로 정의할 수 있다. 이와 같은 감리업무의 성공적 수행을 위해서는 불확실한 현장여건에서 발생하는 다양한 정보의 수집이 전제되어야 하나, 현행 감리업무는 보고서 등 문서자료를 중심으로 운영되어 정보 수집에 한계가 존재한다. 실제 최근 국내에서 발생한 공동주택 붕괴 사고의 원인 중 하나로 감리업무 수행을 위한 정보 소통의 한계가 지적된 바 있다. 이에 본 연구는 건축감리 업무의 효율성 제고를 위해 활용할 수 있는 디지털 기술의 종류를 분석하고, 이에 대한 우선적용 순위를 제시하였다. 우선 적용 순위는 다양한 이해관계자를 대상으로 설문조사를 통해 수집된 데이터를 계층적의사결정기법을 통해 정량적으로 평가하였다. 본 연구의 결과는 향후 건축감리 업무를 대상으로 디지털 기술 적용방향을 검토하기 위한 로드맵 수립의 기초자료로서 활용이 가능할 것으로 예상된다.
본 연구에서는 건설공사에서 수행되고 있는 주요 선계변경과 관련하여 설계서와 결함으로 인한 설계변경, 현장상태와 설계서의 상이로 인한 설계변경, 발주자의 필요에 의한 설계변경 등으로 구분하여 설계변경시의 감리업무에 대한 제반규정과 현장에서의 업무수행 현황 등을 비교${\cdot}$분석하는 방법으로 관련규정의 상호모순으로 인한 감리업무 수행의 문제점을 도출하였다. 이를 토대로 설계변경과 관련된 법령/계약조건/지침상의 규정된 내용과 현장에서의 업무수행을 비교${\cdot}$분석하여 공공공시의 설계변경과 관련한 감리업무의 개선방안을 도출하였다.
The execution of a construction project involves the engagement of many participants. Generally, the Authority uses CM to certify that the Work is built according to the contract documents. The CM work scope is expressed in the Construction Technology Management Act and its Regulation. The mandated and delegated CM services are limited to the construction period. If Contractor is required to repair a construction defect, the Contractor should bear the burden of the inspection service for the defect repair, because it is associated with him. Nevertheless, CM should submit a bond to provide the inspection and supervision service for the defect repair. These may result in conflict with each liability. Therefore, CM service in the law and regulation was investigated and analyzed in this study to classify the characteristics of CM contracts, and it was suggested that the CM liability for the inspection and supervision service for the defect repair should be reconsidered.
본 현재 우리나라에서 많은 사고가 일어나 많은 국민이 건강, 재산 상 피해를 입고 있다. 이러한 사고 중에는 사람이 항상 상주하는 건물에서 일어나는 화재에 의해 일어나는 피해가 적지 않은 비중을 차지하고 있으며 국내 소방 설계 감리 산업의 비중이 타 공종에 비해 많이 경시되고 있어 부적절한 설계와 더불어 부실 시공에 대한 감리가 제대로 이루어지지 않아 건물 완공 이후 화재 시에 소방설비가 제 역할을 하지 못해 큰 피해를 주는 경우가 적지 않은 상황이다. 이러한 폐해를 방지하기 위해 현재 소방시설업에 재직 중인 소방기술자 190인을 대상으로 전반적인 소방분야에 대한 문제점 및 개선안에 대하여 조사하였다. 조사결과 설계업에서는 기술자 등록 및 인력배치기준개선, 영업범위개선, 건축허가 동의요구, 시설계구비서류 개선, 소방시설 설계자의 업무책임과 권한범위를 개선하여야 하고 감리업에서는 등록기준개선, 영업범위개선, 감리 종류, 방법, 대상 및 기준개선, 보조감리원 추가 배치기준개선, 업무내용 및 범위개선, PQ제도와 공영감리제 도입 검토, 부실 감리 방지를 위한 제도개선을 하여 이러한 소방 설계 감리의 확고한 입지와 기반을 마련하여 타 공종과도 동등한 위치로써 국민의 재산과 안전을 추구하고자 함이다.
Since the contents of large-scale repair of a condominium were various, a plan document was not prepared. The owners association of the condominium has given priority to decision-making of price priority over quality. Examination is not performed about the contents of the construction supervision business, which checks whether suitable construction is performed, either. On the other hand, the know-how for builders, such as decision of the process plan under which the repair work lessens influence to the safety and life as much as possible since the place where the resident is living turns into a construction site, and selection of a method of construction, is just going to ask. It is an important subject how the structure of the construction contractor selection, which considered quality, is built. Then, this research focuses on large-scale repair construction of the condominium, and arranges the actual condition of a series of processes from plan document creation to construction supervision. The method of research collects the construction documents of the condominium that carried out Barge-scale repair construction. Next, collection arrangement of the data of construction builder selection is carried out. The method of the construction builder selection of those other than a construction price is examined. The method of quality control of large-scale repair construction is examined.
Information competitiveness accounts for substantial parts of business competitiveness necessary for business management in the knowledge-information society in the 21st century. To improve quality. productivity and competitiveness through information in the fields of SMEs particularly having difficulties under rapidly changing business environment. the government has operated "SME Information Support Project" for the past 8 years. The methodology for developing the standard for this project known as EISDM (Enterprise Information System Development Methodology) provides communication between IT businesses and SMEs participating in this project. and standardized output document formats and how to make out such documents. Infortunately. the number of personnel partaking in the development project for SMEs is no more than 2~4 per site on average. Further. they are required to complete demand analyses. development. testing and operation in about 6 months. which is a very short period. Moreover, there is too much demand for documentation, which is likely to end up being formal work process just for supervision and inspection. That is, the documentation could be for noting but documents. which will prove useless outputs after the project finishes. Therefore, this study proposes an improvement approach as an information system development methodology taking into account SMEs' characteristics and environment so as to relieve developers from such excessive burden of documentation, to save time and resources through efficient management of software development as the original purpose of the methodology, and to produce required quality software.
국가기록원은 2015년부터 보존기간 30년 이상의 표준 전자문서를 중앙행정기관으로부터 이관 받고 있다. 이 과정에서 다양한 종류의 오류와 비효율이 발견되었으나, 그 오류원인을 분석하고 문제해결을 위한 연구는 없었다. 본 연구를 통하여 이관 시 발견되는 대부분의 오류가 생산단계에서 발생하는 것을 확인하고, 이를 해결하기 위한 4가지 방안을 제안한다. 첫째, 전자문서를 결재하기 전에 본문 및 첨부 파일의 결함을 체크하여 오류를 사전에 방지한다. 둘째, 결재와 동시에 전자파일 단위로 전자지문을 생성 및 관리하여 무결성을 보장한다. 셋째, 이관 및 보존 과정에 전자지문 비교·확인 및 결함체크 절차를 적용하여 자동으로 무결성 검증 및 이관 검수를 수행한다. 넷째, 기록화 대상 기준 및 무결성 보장 기술 등이 생산단계에 제대로 적용되는지 관리 및 감독한다.
한국의 주요 주거시설인 아파트에서 많은 하자가 발생하고 있다. 이는 공사관리소홀이나 시공기술부족등에 기인하고 있다. 아파트가 수분양자에게 공급될수록 준공이후 하자는 급격하게 증가하고 있다. 주택법령에서는 지방정부가 건설회사에 하자보수를 지시할 수 있도록 변경되었다. 그러나 하자가가 발생된 이후 하자가가 해결된다면 수분양자는 하자로 인해 고통을 받기 때문에 근본적인 해결책이라고 보기 어렵다. 그래서 수분양자의 권익을 보호하기 위해 아파트 하자를 감소시킬 필요가 있다. 이에 본 연구에서는 아파트분양시 수분양자에 대한 정보의 비대칭성해소, 최종 준공도서의 계약문서화, 감리자의 설계도서 검토기간 확보, 계약변경시 적정 감리대가의 확보, 감리대가 지급절차의 개선, 주택감리용역표준계약서상 감리업무의 조정 등을 제시하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.