• Title/Summary/Keyword: subway railroad tunnel

Search Result 44, Processing Time 0.022 seconds

The Smoke Propagating Distance in the Reduced-scale Model for a Subway Railroad Tunnel (축소 모형을 이용한 지하철터널에서의 연기전파거리 측정)

  • Kim, Myung-Bae;Choi, Byung-Il;Oh, Chang-Bo;Han, Yong-Shik
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.4
    • /
    • pp.295-304
    • /
    • 2005
  • The smoke propagating distances are measured in case that a fire occurs within the subway railroad tunnel. The tunnel is 800m long and the dimension of the cross-section is. Three vertical shafts exist for smoke ventilation. The experiments are performed using the 1/50 reduced-scale model. The smoke propagating distances are measured by thermocouples and by visualization for the accuracy. In order to understand the effect of a fire size and ventilation capacity of the shafts on the smoke propagating distance, 9 test scenarios are chosen. Based on the results, the smoke propagating distance is shown to be important criteria for the ventilation design of the tunnel.

  • PDF

A Study on the Behaviour of Existing Subway Tunnel due to Demolition of Old Buildings and Construction of New Buildings (기존 건물 철거 및 신축 공사에 따른 지하철터널 거동특성 연구)

  • Chung, Jeeseung;Lee, Kyuyoung;Kim, Yongsoo;Lee, Sungil
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.10
    • /
    • pp.23-28
    • /
    • 2014
  • Recent increasing of redevelopment project causes construction of new buildings after demolition of old buildings. However, the researches have been largely confirmed to analysis of behaviour characteristics of existing subway tunnel due to adjacent excavation which constructing new building so far. Accordingly, The ${\bigcirc}{\bigcirc}$ Building which will be built after demolishing existing parking lot is selected as a subject of study. And the purpose of this study is to analyze the effects on existing subway tunnel due to loading and unloading caused by demolition of upper buildings. The numerical analysis was performed by using the MIDAS/GTS program. Two cases for the numerical analysis were analyzed. The one is considering demolition of old buildings and the other is not considering it. This study is to analyze the effect on existing subway tunnel caused by demolition of upper building by analyzing numerical analysis results for tunnel displacement and lining stress. It was analyzed that the effects of considering the demolition of old buildings are larger than those of no considering it.

Development of Tunnel-Environment Monitoring System and Its Installation I -Monitoring System and Measurement in Subway Tunnel- (터널 환경측정 시스템 개발 및 측정 I -개발 시스템 및 지하철터널 측정-)

  • Park, Won-Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.12
    • /
    • pp.8608-8615
    • /
    • 2015
  • We developed a system that can collect and transmit real-time environmental data such as temperature, humidity, wind direction, and wind speed, and equipment performing aging tests on fire detectors. This system was installed in three representative sites of railway tunnels in South Korea such as Gumjung, Solan, Seoul Subway Line 4 tunnels. The systems showed a stable performance and collected environmental data for over a year. We analyzed environmental data collected by two of our developed systems installed in the running tunnels of Gwacheon Line of Seoul Subway Line 4. The developed system was capable of safely analyzing tunnel environments for 24 h straight using a wireless communication network, and has potential for use in a variety of fields other than tunnels.

Fundamental study on enlargement method of existing subway tunnel during operation for sidetrack construction (부본선 건설을 위한 기존 지하철 터널의 운영 중 확폭 방안에 대한 기초연구)

  • Lee, Hyobum;Koh, Sung-Yil;Jun, Jonghun;Yoon, Hee Taek;Yi, Na Hyun;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.1
    • /
    • pp.59-76
    • /
    • 2020
  • As a continuous increase in demand for the transportation infrastructure in the metropolitan area, the renovation of existing metropolitan and urban railway lines for the rapid transport system requires the construction of sidetrack that can operate local and express trains simultaneously. However, the construction of sidetrack after stopping the operation of the existing subway line causes a lot of economic losses, therefore it is essential to study the tunnel enlargement scheme during the operation of the existing subway tunnel. Accordingly, in this paper, basic research on the enlargement plan of the existing subway tunnel was carried out for the renovation of the existing subway line. In order to investigate the method for the sidetrack construction, the Government Complex Gwacheon station on the Gwacheon line of subway line 4 was selected as a virtual research station. Subsequently, four construction plans including tunnel cross-sectional plan for each section were reviewed and constructability and economic feasibility were compared. Finally, the stability assessment was conducted for the selected construction plan which was considered to be relatively unstable by 3-D full numerical analysis considering the sidetrack construction process.

A Study on the Stability of Existing Subway Tunnel due to Construction of New Underpass (지하차도 건설에 따른 기존 지하철터널 안정성에 대한 연구)

  • Chung, Jee-Seung;Choi, Jae-Young;Lee, Jin-Hyuk
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.2
    • /
    • pp.57-63
    • /
    • 2016
  • Recently, subways in the city are formed a vast underground network which is interfered with construction when large-scale infrastructure will be planned to nearby existing subway tunnels. Researches have been restricted to estimate stability of existing subway tunnel due to adjacent excavation causued by small construction such as buildings. In this paper, OO underpass is planned on the top of existing subway tunnel, which will be need large-scale excavation, is selected as a subject of study. And the purpose of this study is to analyze the effects on existing subway tunnel due to excavation by stages on construction of underpass. The 3D-numerical analysis was performed by using the MIDAS/GTS program. The stability on existing subway tunnel caused by sequential excavation is analysed using numerical results. Based on the analysis, the excavation orders and reinforcement methods was suggested for stability of exiting subway tunnel.

Structure stability study for existing subway tunnel segment of Seoul-Busan high-speed railroad (Daegu - Busan) construction (경부고속철도(대구-부산) 도심통과 노반신설 공사중 기존 지하철 터널구간의 구조적 안정성 검토)

  • Kong, Byung-Seung;Kim, Min-Ho
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1752-1759
    • /
    • 2007
  • In the new Seoul-Busan high speed railroad construction specially city center passage roadbed establishment is recommended the staibility for the existing subway tunnel segments of Busan subway line No. 1 and No.2. regarding the appearance condition, a quality condition and the durability of the objective facility site exact inspection, and it evaluates the numerical analysis which uses MIDAS GTS it leads and there is the objective of the place where the stability of the objective facility and this tunnel it investigates. To immediacy of the on-the-spot inspection result whole facility it is a condition where the reinforcement which is simple not to be hindrance is necessary, 2nd Line case it is a condition which transfer is good but the general defect and the damage which occur from the tunnel of NATM type were confirmed part. While roadbed establishment constructing that the continuous maintenance is necessary, it is judged. The result of 1st, 2nd Line maximum sinkage, unequal sinkage and the lining stress of numerical analysis are within permission and the damage degree is appearing with the fact that the degree it will can disregard it is slight. But it enforces necessary Pre-grouting in order to minimize an actual tunnel face conduct and when the tunnel is excavated it is judged with the fact that necessary to minimize the outflow possibility.

  • PDF

Pass loss characteristics of full-duplex video transmission system car to platform at tunnel and road (18GHz 차지상간 양방향 영상전송시스템의 도로 및 터널 구간에서 경로손실 특성)

  • Jeong, Sang-Guk;Choi, Gab-Bong;An, Tae-Ki;Kim, Back-Hyun;Park, Jong-Chol;Yong, Dong-Seok
    • Proceedings of the KIEE Conference
    • /
    • 2009.04b
    • /
    • pp.177-179
    • /
    • 2009
  • It is increased that need of broadband multimedia service to make useful environment for user and to support the operation of railway system. So study of integrated data transmission in a subway and railway is activated. The research deals with pass loss characteristics of 18GHz microwave that is assigned frequency of integrated data transmission in a subway and railway. It is used sample integrated transmission system in subway and railway of KRRI(korea railroad research Institute) at the tunnel and road. Specification of test sample system is blow. It use OFDM modulation, Wireless frequency is 18GHz and 19GHz, Maximum output power is 20dBm, Receive sensitivity is -90dBm. The pass loss exponent and standard variation of road and tunnel is analyzed.

  • PDF

Identification of Noise Characteristics for Subway Train Passing Through the Undergroud Tunnel (터널통과 전동차 내외부 소음 특성 규명)

  • Cho, Jun-Ho;Lee, Kyu-Jin;Jung, Woo-Sung;Hong, Cheol-Gee
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2002.11a
    • /
    • pp.338.2-338
    • /
    • 2002
  • Passengers in automobile or train are exposed to a worse noise environment when they are in the tunnel than in the open field. This is due to a relatively higher space density of sound energy by multiple reflection phenomenon of noise generated by operation of transportaton vehicles from tunnel wall compared to open field. In this study, noise characteristics of subway train running through a tunnel were investigated at straight/cruved track and tunnel type(semi circula/box). (omitted)

  • PDF

Characteristics of Particulate Matter Concentration and Classification of Contamination Patterns in the Seoul Metropolitan Subway Tunnels (서울시 지하철 터널 내 입자상물질의 농도 특성 및 오염형태 분류)

  • Lee, Eun-Sun;Lee, Tae-Jung;Park, Min-Bin;Park, Duck-Shin;Kim, Dong-Sool
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.33 no.6
    • /
    • pp.593-604
    • /
    • 2017
  • The suspended particulate matter(PM) was measured in subway tunnel of Seoul Line 1 to 9 in order to evaluate the pollution degree and characteristics of the PM in the subway tunnel. Also, to analyze the effect of outdoor aerosol concentration on the PM concentration of subway tunnels, the ambient PM concentration around the subway station was extracted by spatial analysis using $PM_{10}$ data of Seoul air pollution monitoring network. Finally, in order to understand pollution pattern in the Seoul subway tunnels, cluster analysis was performed based on input data set such as PM levels in tunnel, tunnel depth, length, curvature radius, outdoor ambient air pollution levels and so on. The average concentration of $PM_{10}$, $PM_{2.5}$, and $PM_1$ on subway tunnels were $98.0{\pm}37.4$, $78.4{\pm}28.7$, and $56.9{\pm}19.2{\mu}g/m^3$, respectively. As a result of the cluster analysis, tunnels from Seoul subway Line-1 to Line-9 were classified into five classes, and the concentrations and physical properties of the tunnels were compared. This study can provide a method to reduce PM concentration in tunnel for each pollution pattern and provide basic information about air quality control in Seoul subway tunnel.

Experiments of Egress Behavior When Subway Car Stops on Railroad (지하철 차량 선로 정차 시 피난 행동에 관한 실험)

  • Kim, Jong-Hoon;Kim, Woon-Hyung;Lee, Duck-Hee;Jung, Woo-Sung
    • Fire Science and Engineering
    • /
    • v.26 no.3
    • /
    • pp.1-7
    • /
    • 2012
  • When the subway car stop on track, passengers have to overcome a height of 1.2 m from floor level of the subway car to the level of track for evacuation. In this experiments, participates in the group of twenties or under ages were rapidly jumping down from the subway car. However, Most elderly group were not easy to overcome the height without help of others and some of them were fell and injured. In case of merging flows, the flow rate of the group of twenties was lower than the other cases. If fire occurred in the train and train stopped in the tunnel, it will be needed a lot of total evacuation time because of the heigh difference and wall effect from subway car to outside.