• 제목/요약/키워드: substations

검색결과 295건 처리시간 0.021초

고속철도 변전소 피크부하 저감용 ESS 일간 운전 프로그램 개발 (Development of Daily Operation Program of Battery Energy Storage System for Peak Shaving of High-Speed Railway Substations)

  • 변길성;김종율;김슬기;조경희;이병곤
    • 전기학회논문지
    • /
    • 제65권3호
    • /
    • pp.404-410
    • /
    • 2016
  • This paper proposed a program of an energy storage system(ESS) for peak shaving of high-speed railway substations The peak shaving saves cost of equipment and demand cost of the substation. To reduce the peak load, it is very important to know when the peak load appears. The past data based load profile forecasting method is easy and applicable to customers which have relatively fixed load profiles. And an optimal scheduling method of the ESS is helpful in reducing the electricity tariff and shaving the peak load efficiently. Based on these techniques, MS. NET based peak shaving program is developed. In case study, a specific daily load profile of the local substation was applied and simulated to verify performance of the proposed program.

SCADA RTU 상태이벤트 취득시간 정확도 개선 (An Accuracy Improvement on Acquisition Time of SCADA RTU Status Event)

  • 이주헌;이상중
    • 전기학회논문지
    • /
    • 제62권3호
    • /
    • pp.332-341
    • /
    • 2013
  • SCADA RTU is a remote control unit equipped in substations for automatic operation of a power system. The RTU monitors and measures the operation status of remote substations to transmits the signals to upper SCADA system and receives control command signals from dispatch center to actuate corresponding apparatus. The RTU receives the standard time from GPS receiver to synchronize the times for all devices and acquires the status event of power apparatus using DIM. Without the time synchronization between GPS and RTU, stable operation of the power system and accurate analysis of the system fault are impossible due to the time error of SOE. In this paper, a test is performed to identify if the operation time of SCADA RTU DIM coincides with the standard time. And we tried to find the reason of error, to minimize the time discrepancy. Through this study, RTU operation time could be synchronized with the standard time within 10[ms] to improve the reliability of SOE data.

변전소 상태변수 추정에 관한 연구 (A Study on the State Estimation for Distribution Substations)

  • 이흥재;박성민;이경섭
    • 조명전기설비학회논문지
    • /
    • 제17권3호
    • /
    • pp.103-109
    • /
    • 2003
  • 전력계통의 자동화에 있어 측정되는 데이터의 정확성은 기본적으로 확립되어야 할 요건이다. 측정된 데이터는 통신 장애나 기기 자체의 오동작으로 인해 오차를 포함할 수 있으며, 이러한 오차는 상태추정에 의해 줄어들 수 있으나, 잘못 측정된 일부 값에 의해 상태추정의 전반적인 신뢰도가 저하될 수 있다. 본 논문에서는 가중최소 상태추정과 카이스퀘어 이론에 근거한 잘못 측정된 데이터의 검출 알고리즘이 제안되었으며, 이를 국내 154kV 변전소에 적용하였다. C 언어와 비쥬얼 베이직을 사용하여 GUI 환경의 시뮬레이터를 개발하였으며, 다른 운용 시스템과의 연계를 고려하여 TCP/IP 프로토콜을 탑재하였다.

Gigabit Ethernet Based Substation

  • Yang, Hyo-Sik;Raza, Ali;Park, Min-Woo;Kim, Sang-Sig;Jang, Hyuk-Soo;Lee, Myung-Ho;Kwon, Dong-Seop;Jang, Byung-Tae
    • Journal of Power Electronics
    • /
    • 제9권1호
    • /
    • pp.100-108
    • /
    • 2009
  • Designing communication architecture for substation automation is a challenging and subtle task for visualizing substations in the digital world under the umbrella of IEC61850. Communication paradigms for substation automation are of critical importance because of two reasons; the communication arena is changing daily and opts for convenience and simple deployment at a lower migration cost and interoperability is one of the core constrains of IEC61850 for substation automation. This paper presents an analysis and outline of the crucial need for the deployment of Gigabit Ethernet in substations and also presents suggestions on how Ethernet technology can help in substation automation. Ethernet is one of the most pervasive communication technologies available and can provide a long term solution in the changing arena of communication. We have performed simulations in NS-2 to prove that our suggested communication paradigm is optimal in various regards with consideration of the constraints imposed by IEC61850.

Measurement and Modeling of Personal Exposure to the Electric and Magnetic Fields in the Vicinity of High Voltage Power Lines

  • Tourab, Wafa;Babouri, Abdesselam
    • Safety and Health at Work
    • /
    • 제7권2호
    • /
    • pp.102-110
    • /
    • 2016
  • Background: This work presents an experimental and modeling study of the electromagnetic environment in the vicinity of a high voltage substation located in eastern Algeria (Annaba city) specified with a very high population density. The effects of electromagnetic fields emanating from the coupled multi-lines high voltage power systems (MLHV) on the health of the workers and people living in proximity of substations has been analyzed. Methods: Experimental Measurements for the Multi-lines power system proposed have been conducted in the free space under the high voltage lines. Field's intensities were measured using a referenced and calibrated electromagnetic field meter PMM8053B for the levels 0 m, 1 m, 1.5 m and 1.8 m witch present the sensitive's parts as organs and major functions (head, heart, pelvis and feet) of the human body. Results: The measurement results were validated by numerical simulation using the finite element method and these results are compared with the limit values of the international standards. Conclusion: We project to set own national standards for exposure to electromagnetic fields, in order to achieve a regional database that will be at the disposal of partners concerned to ensure safety of people and mainly workers inside high voltage electrical substations.

절연구분장치의 속도향상 기술 (Technique on the speed up of neutral section in the catenary system)

  • 창상훈;박병수;김영곤
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 춘계학술대회 논문집 전기설비전문위원
    • /
    • pp.71-74
    • /
    • 2005
  • At the neutral sections, There are neutral sections inserted in overhead contact line between the substations to divide different phase current sections of AC electrified lines. except convention line, a large stress occurs in the contact wire near the fittings under passing pantographs. So, in order to raise the train speed over 150km/h, a new type section has been adopted.

  • PDF

ANALYSIS OF HUMAN DECISION MAKING PROCESS BASED ON CONDITIONAL PROBABLILTY

  • Nakamura, Masatoshi;Goto, Satoru
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1997년도 한국자동제어학술회의논문집; 한국전력공사 서울연수원; 17-18 Oct. 1997
    • /
    • pp.783-786
    • /
    • 1997
  • Automatic realization of on-off human decision making was derived based on a conditional probability. Following the proposed procedure, problems of insulator washing timing in power substations and spike detection on EEG(electroencephalogram) records were appropriately solved.

  • PDF

건설전원용량에 따른 신설전원의 안정도특성 (The Stability Dependency of New Generator on the Existing System Capacity)

  • Nam, Sang-Cheon
    • 대한전기학회논문지
    • /
    • 제35권7호
    • /
    • pp.285-295
    • /
    • 1986
  • This study is to investigate the stability of expanded new generator plant depending on the capacity of existing system. We examined the transmitting power limit to the existing system as its capacity increase for the various system configuration with fixed location of plants and substations. The results show that the stability has decreasing tendency when the existing source capacity increase. Thus it can be concluded that new generator has little stability problem when it connected to small system, whereas large existing system capacity gives remarkable difficulty in adopting new generator.

  • PDF

논리 결합에 의한 변전소 오류 데이터 처리 알고리즘 개발 (Logic Based Bad Data Processing Algorithm in Substations)

  • 진보건;현승호;이승재
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.408-410
    • /
    • 2005
  • It is important to identify and correct bad data for maintaining the security and the reliability of data acquisition and management in a substation. This paper presents a bad data processing method based on rules acquired by analysis of cause and effect of bad data. The proposed method verified by the case study in a typical substation model.

  • PDF

변전소 보호, SCADA, 응용을 위한 IEC 61850통합적용 (Integrating IEC61850 at Substations for Protection, SCADA, and Applications)

  • 장성익;강대언;조시형;민병욱
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.135-137
    • /
    • 2006
  • 변전소 보호, 제어, 감시와 자동화 능력을 선진화하면서 송변전설비 건설, 보수, 운영 및 관리비용을 확실하게 줄이기 위한 계획과 노력이 진행 중이다. 그러나 통신기술이 변화할 때 마다 새로운 통신 표준을 채용하거나 변전소 자동화시스템을 전체 교체하는 것은 바람직하지 않다. 따라서 IEC61850통합으로 기능과 변전소 데이터를 생성과 서버제공, SCADA, 보호응용, 상태 감시의 IED 광역보호 장치 통을 고려해 본다.

  • PDF