Development of Daily Operation Program of Battery Energy Storage System for Peak Shaving of High-Speed Railway Substations |
Byeon, Gilsung
(Smart Distribution Research Center, Advanced Power Grid Research Division, Korea Electrotechnology Research Institute)
Kim, Jong-Yul (Smart Distribution Research Center, Advanced Power Grid Research Division, Korea Electrotechnology Research Institute) Kim, Seul-Ki (Smart Distribution Research Center, Advanced Power Grid Research Division, Korea Electrotechnology Research Institute) Cho, Kyeong-Hee (Smart Distribution Research Center, Advanced Power Grid Research Division, Korea Electrotechnology Research Institute) Lee, Byung-Gon (Korea Railroad Corporation) |
1 | Seul-ki Kim, Jong-yul Kim, Kyeong-hee Cho, Gilsung Byeon, "Sizing and Economic Analysis of Battery Energy Storage System for Peak Shaving of High-Speed Railway Substations", The Transactions of KIEE, Vol. 63, No. 1, pp. 27-34, 2014 January. |
2 | Kyeong-hee Cho, Seul-ki Kim, Eung-sang Kim, "Optimal Capacity Determination Method of Battery Energy Storage System for Demand Management of Electricity Customer", The Transactions of KIEE, Vol. 62, No. 1, pp. 21-28, 2013 January. |
3 | Korail Pass Reservation Website, http://www.letskorail.com/ |
4 | Korea Electric Power Corporation, Electric Power Portal Service Website, http://pccs.kepco.co.kr/ |
5 | Tae-su Choi, "A study on the improving methods of power quality in the HSR considering the extended feeding mode". Ms. dissertation, Dept. Mech. Eng., Univ. Hanbat, 2007. |