• 제목/요약/키워드: substation system

검색결과 640건 처리시간 0.025초

변전소 건설로 인한 자기장 노출범위설정에 관한 연구 (Study for Exposure Limits of Magnetic Fields in the Transformer Substation)

  • 전인수
    • 환경영향평가
    • /
    • 제14권4호
    • /
    • pp.195-202
    • /
    • 2005
  • The health risks from the magnetic fields exposure have been brought out difficulties in the construction of transformer substation. According to several epidemiologic studies and the relevant international organizations, magnetic fields should not exceed the exposure limits of 3mG for the people living near electric power lines. The rigid regulation of the exposure levels for the elementary school and residental areas has been established already in Switzerland and Italy. Since 1998, the environmental impact assessment system in Korea has been reviewed for power-frequency magnetic field by precautionary policies. In this study, the possible application of Prior Environmental Performance Review System for the transformer substation was reviewed from the points of the properties of the powerfrequency magnetic fields. The ranges and survey methods of the assessment for the transformer substation were proposed. The ranges of magnetic fields was between 300m to 500m for the 345kV transformer substation. It is necessary to develop further specific assessment methods for various high-voltage transformer substations.

765[㎸] 변전소 시뮬레이터를 위한 조류계산 프로그램에 관한 연구 (A Study on the Load Flow Program for 765[㎸] Substation Simulator)

  • 여상민;김철환;이종포
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제52권4호
    • /
    • pp.201-206
    • /
    • 2003
  • Power system is analyzed by three methods of load flow, fault calculation, and voltage stability. Among there, load flow is calculated to flow of power in power in system at steady state. But, load flow is difficult to analyze to flow of power in substation, because power flow frequently alter by various equipments such as circuit bleaker, disconnect switch and shunt reactor. Particular, in 765[㎸] system, because of form of 1.5GB for stable operation, structure of substation has been very complex. In this paper, we describe technique for application of load flow algorithm in simulator for 765[㎸] substation. For this technique, we built each database for various equipments and considered form of 1.5GB Data as form of bus and line, for application of load flow, are acquired from built database, and then calculate load flow in substation. And. results of load flow are outputted in screen of operator console program.

고속전기철도 변전소 제어케이블 번호부여체계 표준화에 관한 연구 (A Study on standardization of control cable numbering for high speed railway substation)

  • 안승화;김시구;김백;노성찬;정상기;안영훈
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.337-346
    • /
    • 2008
  • In this paper, a study an standardization of control cable numbering for high speed railway substation. Standard numbering structure of substation control cable and consistency of the number system are important for the railway substation construction and maintenance. However, currently control cable number system of railway substation was not standardization which was different according to a bander and a construct company. Therefor there is many difficult which does a same function to differ in maintenance and repair to accident. Therefor Standardizes the number system of the substation control cable is useful for an improve of construction and maintenance.

  • PDF

765kV 변전소 감시제어용 시범시스템 (Design of a Prototype Fibre Optic Based Monitoring and Control System for Future KEPCO's 765kV Substation)

  • 장문명;정상진;최종협;박종명
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1996년도 하계학술대회 논문집 B
    • /
    • pp.883-886
    • /
    • 1996
  • Instead of point-to-point hard wiring between substation yard equipments and SCADA RTU(Remote Terminal Unit), fibre optic cable will be used in the portion between Local Units and Central Unit in the future KEPCO 765kV substation. The connections between substation yard equipments and nearby Local Unit remain the same hard wiring. The new fibre optic system will provide security especially during ground faults and is immune to electrical noise. A prototype system will be manufactured and installed in the existing 154kV Yeosan Substation by the end of July this year and operated for one year. By incorporating the operation experiences acquired in the system, an improved system will be commercially applied to 765kV Shin-An-Seong Substation where 345kV GIS will be installed initially and act as the switching station in the year 1998. The system is composed of one Central Unit and several Local Units. The Central Unit is composed of two workstation level computers, one is in operation and the other backup, and a Communication Control Unit. The Local Unit uses the existing SCADA RTU technology and takes the form of a distributed one. Between the Communication Control Unit and Local Units, the fibre optic system with star-coupler is used.

  • PDF

변전소 자동화를 위한 상태감시 시스템에 관한 연구 (Study on the Supervisory Monitoring System for Substation Automation)

  • 이흥재;이은재
    • 조명전기설비학회논문지
    • /
    • 제28권2호
    • /
    • pp.84-91
    • /
    • 2014
  • This paper introduces the application of supervisory monitoring system for substation automation based on IEC 61850. The objective of proposed system is detection of such a malfunction or degradation of devices. The supervisory monitoring procedure consists of a two step - topology processor and state estimation. The topology processor using artificial intelligence is a preprocessing step of state estimation. Topology processor identifies the topology structure of switches in substation and detects an error of ON/OFF state data. The state estimation is an algorithm that minimizes an error between optimal estimation values and real values. The proposed system is applied to standard digital substation based on IEC 61850 for performance verification.

154KV 변전소의 접지저항 저감대책 검토사례 (A Case of Reducing Grounding Resistance of 154KV Substation)

  • 기현찬;최종기;정길조;온대현
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 하계학술대회 논문집 C
    • /
    • pp.2064-2067
    • /
    • 2000
  • In our country, most region is composed of mountains and people have recently been displeased with the construction of the substations in their vicinity so the substations newly built are mainly constructed with GIS system in the small area that has high soil resistivity near mountain. Therefore, nowadays the design of substation grounding system has been difficult, and the additional considerations are needed. UC substation was also difficult to design the grounding system because of so small substation area and high soil resistivity. This paper shows the examples of reducing the grounding system resistance reasonably by using several ways. Designing the ground grid electrode in the access road, deep electric earth probe, changing the substation soil with the law level resistivity soil. This report deals with the computer simulation of the grounding system resistance about the ways illustrated above.

  • PDF

전철용 직류변전소의 최적 위치 및 용량 설계에 관한 연구 (A Study on Design of Optimal Location and Capacity of DC Substation for Mass Transit System)

  • 김종구;이상동;백병산;이현두;이준엽
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 추계학술대회 논문집 학회본부 B
    • /
    • pp.398-401
    • /
    • 2000
  • This paper describes the design of optimal location and capacity of DC substation for Mass Transit System. Three factors are considered for the design i.e. substation arrangements, line configuration and substation power capacity. In this study, we considered all of them for capacity calculation of power supply system for MTS. At first, DC-fed-traction system is introduced on an outline, a characteristics of train and fed network, and design method of substation arrangements. Optimal design procedures are described, and program for capacity calculation of the system is presented. In addition, the computer simulated results are compared with the conventional simple calculation method.

  • PDF

디지털변전소 엔지니어링 툴 구현을 위한 IEC 61850 국제규격 기반의 변전소 토폴로지 표현에 관한 연구 (A Study on Description of IEC 61850 based Substation Topology for Implementing the Engineering Tool of Digital Substation)

  • 이남호;안용호;장병태
    • 조명전기설비학회논문지
    • /
    • 제29권9호
    • /
    • pp.23-32
    • /
    • 2015
  • In order to complete engineering works of the digital substation, Both Data transmission among a variety of IEDs and HMIs, and single line diagram of the substation might be done based on XML documents published in IEC 61850 international standards. This kind of XML based engineering process for the digital substation must be implemented not by manual written work but by the engineering tool using a computer. But most of the engineering tools do not support system based engineering works such as single line diagram of the substation but have only function to set IEDs as single device unit. Accordingly, this paper presents a new design method of the system based engineering description applicable to real IEC 61850 based substation through analyzing the current international standard and its sampled engineering file, and shows implementation of the engineering tool of the digital substation with the result of this study.

직류급전시스템 시험적용 사례를 통한 디지털 직류 보호계전기에 관한 연구 (A Study on the Digital DC Protection Relay through with Field Adoption Test in the DC Distribution System)

  • 고인석;차광석;민병훈
    • 대한전기학회논문지:전기기기및에너지변환시스템부문B
    • /
    • 제55권12호
    • /
    • pp.646-652
    • /
    • 2006
  • This study identifies the comparison of Technical specification and Characteristics of DC Protection Relay(ETCPU200) used in DC Distribution System in Korea. ETCPU200 has completed Field Test and approved its capability by finding out causes of recent operations through lately developed digital DC protection relay in parallel operation at Maebong-Substation, Sangbong-Substation, Nakseongdae-Substation, Euljirosaga-Substation, Jegi-Substation and Chongyangri T/P area. It also examines additional features for efficient System Analysis and Operations.

도시철도 실측 부하에 기반한 첨두부하 절감용 ESS 용량 산정 (Capacity Determination of ESS for Peak Load Shaving Based on the Actual Measurement of Loads in the Substation of Urban Railway)

  • 박종영;정호성;김형철;신승권
    • 전기학회논문지
    • /
    • 제63권6호
    • /
    • pp.860-865
    • /
    • 2014
  • This paper proposes the method for determination of the capacities of ESS (Energy Storage System) and PCS (Power Conditioning System) for the peak load shaving based on the load data in the substation of urban railway. In addition, this paper analyze the actual measurement of loads in the substation of urban railway. The load of a weekday in the substation of urban railway is high around rush hours in the morning and evening, which is different from that of a normal substation. The required capacities of ESS and PCS become larger as the amount of peak load shaving is higher, and are affected from the patterns of daily load in the substation.