• Title/Summary/Keyword: substation

Search Result 998, Processing Time 0.028 seconds

The first installation of 345kV long-length transmission line between Mikyum and Sungdong substation in Korea (345kV 미금${\sim}$성동변전소간 장거리 지중송전선로 준공)

  • Kim, Y.;Seong, J.K.;Go, C.S.;Han, K.J.
    • Proceedings of the KIEE Conference
    • /
    • 1997.07e
    • /
    • pp.1731-1733
    • /
    • 1997
  • The first 150lkV underground transmission line of Korea was installed between Danginri and Yongsan substation in 1974. Since then, the underground transmission lines of about 720 circuit-km had been installed up to 1995. As the national economy has been enlarged and the population of city has been rapidly increased, the demand of an electric power has been very increased. Therefore the first 345kV long-length transmission line of Korea was installed between Mikyum and Sungdong substation on Jan., 1997. This paper describes the design of the 345kV oil-filled cable and its accessories, the design of the system, the methods of installation, field tests, and the future trends of the underground transmission line in Korea.

  • PDF

Characteristic of Magnetic Fields Distribution in 345/154KV outdoor Substation (345/154KV 전력소 구내의 자계 분포 특성)

  • Sa, J.W.;Kim, S.M.;Hong, J.P.;Jeon, H.T.;Hahn, S.C.;Joo, S.W.
    • Proceedings of the KIEE Conference
    • /
    • 1997.07a
    • /
    • pp.97-99
    • /
    • 1997
  • For two decades and more, a lot of research work on the biological effects of EMF (Electromagnetic Field) on human health have been reported. Electric facilities in a typical substation are the main source of magnetic field. This paper presents the measurement and analysis of magnetic field in 345/154KV outdoor substation. The magnetic field depends on the currents which distributed by electric facilities. The result of this paper will be able to be used as basic informations to reduce the level of EMF from the electric utility facilities.

  • PDF

A Study on the DC High Speed Circuit Breaker(HSCB) in Electric Railway Substation System (전기철도 변전소의 직류고속도차단기 동작 감소방안에 관한 연구)

  • Heo, Tae-Bok;Kim, Hak-Lyun;Chang, Sang-Hoon
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1303-1308
    • /
    • 2004
  • This paper proposes a reduction method for the mis-operation analysis of the DC High Speed Circuit Breaker(HSCB) in electric railway substation system. The analysis method is based on present condition of operation which is a method for accuracy level up. There is reason to operation of HSCB that it is mis-operation of fault detection relay(50F), operation of ground fault relay(64P), and trouble of electric car. A countermeasure is relay resetting through field test, induction of GTOCB(Gate Turn Off Thyristor Circuit Breaker), HSVCB(High Speed Vacuum Circuit Breaker), coordination with electric car. The results presented in the paper can be used as a reference for maintenance free in electric railway substation system.

  • PDF

Development of a Substation Simulator using Real Time Digital Simulator (RTDS를 이용한 변전소 시뮬레이터 개발에 관한 연구)

  • Lee, D.S.;Ahn, B.S.;Lim, S.I.;Lee, S.J.;Chang, S.C.
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.178-180
    • /
    • 2003
  • This paper proposes a real-time simulator that can simulate dynamic changes of a substation for intelligent SCADA system. The simulator consists of RTDS, voltage and current amplifier, IED, and RTU. The simulator is verified by system implementation and event simulation of a substation.

  • PDF

Modeling of Converter-based Single-phase Load for Analysis of AC Substation System of Electric Railway (철도 급전계통 해석을 위한 컨버터 기반 부하 모델링)

  • Son, Ho-Ik;Yoo, Hyeong-Jun;Kim, Hak-Man
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.12
    • /
    • pp.1959-1963
    • /
    • 2012
  • Since electric railway load is variable largely due to starting and braking characteristics as well as various operation patterns, load modeling is not easy but complicated. For this reason, a simple technique for modeling of electric railway load of is required to analyze the AC substation system of electric railway. In this paper, a modeling technique of converter-based electric railway load is proposed and is tested using nonlinear loads on Matlab/Simulink.

Selection Criteria for the Traction Power Supply Line of the Light Rail Transit System (경량전철 전차선 용량 선정방법)

  • Chung S.G.;Jeong R.G.;Cho H.S.;Han S.Y.;Lee A.H.;Baek B.S.
    • Proceedings of the KSR Conference
    • /
    • 2003.05a
    • /
    • pp.409-414
    • /
    • 2003
  • In this study we examined the method to select the size of the conductor rail for light rail system. Study results shows that using the conductor rail with lower resistivity requires fewer power substation, which results in lower construction cost. It also produces less copper loss. Therefore first choose the conductor rail with lowest resistivity and select the substation location, Next conduct computer simulation study to confirm it meets voltage requirement. if the minimum voltage is well above the required minimum voltage, substation number can probably be further reduced.

  • PDF

Simulation study of a regenerative inverter for absorption of regenerative energy in a DC traction substation (도시철도직류변전소의 회생전력 흡수를 위한 회생인버터 시뮬레이션)

  • Bae C. H.;Han M. S.;Kim Y. G.;Kwon S. Y.;Park H. J.
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.705-711
    • /
    • 2005
  • In DC traction substation with 12-pulse diode rectifiers, the DC line voltage tends to rise above noload voltage because it can't absorb the regenerative power caused by electric brakes of train. To solve this problem, an IGBT regenerative inverter should be installed and recycles the surplus regenerative power by delivering it. to the supply grid. In this paper, the DC traction substation equipped with a IGBT regenerative inverter is studied using computer simulation. Matlab/simulink is used to simulate the operation of regenerative inverter which injects the regenerative power into the supply grid and stabilizes the DC line voltage. It is confirmed that the high quality regenerative power is delivered to the supply grid thorough computer simulation.

  • PDF

A study on the electric railway load pattern analysis and building database program (전기철도 부하특성 분석 및 데이터베이스 구축)

  • Jeon, Yong-Joo;Kim, Chi-Tae;Lee, Gi-Chun;Lee, Sung-Uk
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.719-722
    • /
    • 2006
  • At present, In korea one of big characteristics in electricity power market is unique seller but in the near future competitions are expected in the market. Another big trend is development of IT technology. Through IT, remote inspection for power usage are possible. So huge power consumer like KORAIL it is necessary to investigate power consumption pattern. This paper presents load consumption pattern for representative substation and billing system database program. Base on the substation annual power usage data, the characteristic of the substation power consumption are investigated and effective electrical billing system are compared each other. The database program was properly designed to examine the billings.

  • PDF

Development of the Gateway in IEC61850 based Substation for Smart Grid (스마트 그리드용 IEC61850 기반 변전소에서의 게이트웨이 개발)

  • Yun, Seok-Yeul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.7
    • /
    • pp.1324-1330
    • /
    • 2011
  • This paper presents the development of gateway for smart grid for the interoperable communication between IEC 61850 station leveled devices and one of legacy Modbus, DNP3, and IEC60870-5-101/104/103 communication protocol devices of bay level in substation or for the exchange of information between IEC 61850 substation and SCADA control center. The data-mapping model is designed for the exchange of information and the gateway configuration tool is developed for generating meta-data based on XML Schema. this paper is mostly concerned with the design and realization of gateway system for the interoperable data communication between a legacy protocol device and IEC61850 based devices or systems.

A Study on Comparative Analysis of Power Consumption Characteristics and the revulsion of investment on the application of a BESS in Subway Substation (도시철도 변전소 단위구간의 전력사용 실태 및 피크제어용 BESS 도입에 따른 경제성 분석)

  • Jung, Hyun-Ki;Kim, Se-Dong;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.6
    • /
    • pp.85-90
    • /
    • 2014
  • This paper shows a reasonable demand power, that was made by the systematic and statistical way considering actual conditions, such as investigated transformer capacity and peak power for the last 6 years of subway substation customer as to AMR. In this dissertation, it is necessary to analyze the key features and general trend from the investigated data. It made an analysis of the feature parameters, such as average, standard deviation, median, maximum, minimum and thus it was carried by the linear and nonlinear regression analysis. And we studied on the application of a BESS. Analysis showed that the revulsion of capital is about 3 years and 4 months.