Web 2.0 Cluster based Process and Performance Management System Modeling (Web 2.0 Cluster 기반의 공정 및 성과관리 시스템 모델 구축)

  • AHn, Jae-Gyu;Ong, Ho-Kyoung;Kim, Dae-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.892-898
    • /
    • 2007
  • This study aims to implement an efficient process management system for small and medium sized(local) construction companies and a performance management system for the Korean construction industry. The process management system by Lean Construction is Web 2.0 platform-based and creates clusters with numerous general contractors and sub-contractors, which will enable mutually organic process management. Plus, this system will enable them to compare project performance management by analyzing it during or after a project by collecting and accumulating lots of data occurring in pursuit of a project. These performance management cases will be of help in process planning during similar upcoming projects. This study is expected to somewhat reduce the burden of implementing a complicated process management protocol and system that Korean small and medium sized (local) construction companies experience with their web-based process management, and is supposed to realize accurate performance management with highly reliable data which are significantly accumulated within the database.

  • PDF

A study on the Improvement Plan of Construction Site Management In Korea (국내 건설 현장관리업무의 개선방안에 관한 연구)

  • Kim, Jin-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.4
    • /
    • pp.137-144
    • /
    • 2002
  • In the modern age. Building is getting higher and larger according to owner and social demands. Now when we are facing the need of the cost down and the reduction of economic loss. In this paper, the characteristics of the present conditions of site management were investigated with the field survey. And The Purpose of this study is to suggest the rational plans of construction planning in site management. The method of site management. however depends on experience of a construction manager. in order to solve this situation, it is necessary to create a method of site management that is adequate for the condition of construction. By cultivating excellent sub contractors, we can expect precise construction with a few experts. improvement in qualify of construction from standardization, computerization of each process. And the expectancies of this paper are that it can be used as efficient data for improvement of system to systematize site management work in Korea.

Process Interference Management for Finish Works using Mobile Technology (모바일 기술을 이용한 마감공사의 작업간섭 관리)

  • Ko, Yong-Ho;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.35-36
    • /
    • 2017
  • The finish works of construction projects comprises approximately 40% of the total construction duration. Thus, the management of finish works have as big as impacts on total project duration as the earthworks, foundation and structure works. Process interference management is considered one of the most important issues dealt during finish works. However, it was investigated that effective management systems have yet not been applied for practical use. Accordingly, this paper suggests a mobile technology based finish works management system that mainly focuses on preventing process interference occurred due to ineffective communication between general and sub-contractors.

  • PDF

Improvement of Process and Calculation for Premium Rate in Maintenance Bond (하자보수보증보험의 프로세스 및 요율산정 개선)

  • Choi Min-Yong;Hyun Chang-Taek;Koo Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.366-369
    • /
    • 2004
  • Construction demands will become high. Defects liability is treating with a consumer on a defect. Maintenance bond is overlooking excessive responsibility of construction industry participants. This study classified the problem that are divided to systematic and internal matter. And this study presented an improvement proposal. An improvement proposal of a process may reduce a financial burden of contractors and sub-contractors. And improved rate decision will do additional consideration of the study result, so that it is appropriated a rate rationally.

  • PDF

IMPACTS OF DESIGN-BUILD DELIVERY SYSTEM ON THE CONSTRUCTION INDUSTRY IN TAIWAN

  • Min-Ren Yan;Wei Lo;Chien-Liang Lin
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1007-1012
    • /
    • 2005
  • Although the design-build (DB) delivery system has been taking great strides in the world and relevant researches have also been quite abundant, few studies have dealt with its potential impacts on the construction industry as a whole. This research first identified the potential entry barrier factors, which may hinder the market access, based on the theory of industrial economics and characteristics of DB project. Then through a nation-wide questionnaire survey involving 103 construction contractors and engineering consultants, the influences of each factor on company's competitiveness and corporate strategies were scrutinized, and consequently, the evolution of the construction industry was examined. It is found that as opposed to the traditional design-bid-build delivery system, the DB delivery system elevates competitive advantages of large organizations in terms of the financial capability, working experience, human resource, and administrative strength, and among them, the financial strength was concluded to be the most significant force in differentiating corporate strategies and widening the gap of competitiveness between companies. It is inferred if the government extensively adopts DB delivery system, large organizations that already possess the competitive advantage tend to obtain both design and construction abilities, and dominate the DB market. Small and medium sized companies will find little room to maneuver and be forced to become specialty sub-contractors.

  • PDF

A Study on Multilayer Sub-contracting in Construction Industry of Hong Kong

  • Cheng, T.F.;Lam, H.C.;Leung, K.L.;Liu, W.T.;Zayed, Tarek;Sun, Yi
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.23-29
    • /
    • 2020
  • Multilayer sub-contracting is a significant practice among the world, including Hong Kong. When a principal contractor secured a project from a developer, the specific jobs will usually be breaking down and sub-contractors with the lowest bid [1]. The adoption of multilayer sub-contracting has been a controversy issue which is considered as a two-side blade. While certain studies have been carried out to examine both the contributions, damages and improvements for multi-layer subcontracting, the construction industry and researchers are still waiting for a solid measure to enhance the system. Hence, this research attempts to study the advantages, disadvantages, conducts a comparison between single and multilayer sub-contracting and measures of current Hong Kong construction industry based on literature review, questionnaire and in-depth interviews. To achieve the objectives, Analytic Hierarchy Process (AHP) and total weighted score methods are adopted to examine and rank the criterion. The findings of this study provide a good basis for understanding the major reasons and problems caused by the adoption of multilayer sub-contracting. Besides, the identified safety perspective explores a new perspective regarding to issues of multi-layer subcontracting, which will serve as a solid foundation for further research to enhance safety performance. Finally, the findings of measurements towards improvement of multilayer sub-contracting will also provide a solidsolution for construction industry.

  • PDF

A Study on the Competitiveness of Green Construction in Construction Firms (건설기업의 녹색건설 경쟁력 요인에 관한 연구)

  • Lee, Eui-Dong;Lee, Jae-Wook;Kim, Han-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.125-134
    • /
    • 2012
  • In the construction industry, "Green" is emerging as a keyword of new growth engine. Since green construction competitiveness is essential for contractors' survival and growth, it is important to understand what constitutes green construction competitiveness. The objective of the study is to identify elements of green construction competitiveness and to discuss relationships between their importance and current level based on the Gap analysis. A better understanding of the elements of green construction competitiveness assists contractors in formulating green strategies. It also provides insight into what motivates contractors in establishing related policies and regulations. The study identifies that in general there exists a gap between the importance and current level of green construction competitiveness. It also demonstrates that CEO' competence shows a less gap between the importance and current level but firms' competence is an area of weakness. Finally a substantial gap is observed in the field of green R&D strategies and sub-contracting partners.

Development of An Information System for SOC Projects (SOC사업의 정보시스템 개발에 관한 연구 -원자력발전소건설 사업을 중심으로)

  • 윤은상;이화기
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.26 no.2
    • /
    • pp.46-54
    • /
    • 2003
  • SOC(Social Overhead Capital) projects such as road, power plant, airport or telecommunication facility construction require a large scale of cost, a long period of time and management of a number of sub-contractors. So systematic and efficient management tool in SOC projects is inevitable. Information system provides a valuable tool which can integrate and manage the large volume of information for SOC projects. This study investigates and analyzes the information system of nuclear power plant construction project. Based on this study, we can suggest the direction for designing information system for SOC projects.

A study on Sub-contractor Product Assurance for development of Ka band Communication Payload System of COMS (통신해양기상위성 Ka 통신탑재체 개발 공동 및 용역 개발 참여기관 제품보증 연구)

  • Jeong, Cheol-Oh;Lee, Seung-Pal
    • Journal of Aerospace System Engineering
    • /
    • v.3 no.1
    • /
    • pp.6-11
    • /
    • 2009
  • It is anticipated that quality assurance for the Ka band Communication Payload System(COPS) development program of the communication, Ocean & Meteorological Satellite(COMS) may be a core technical factor to be concerned in order to avoid any failure, and to assure its final performance during the mission lifetime in space. Those can be managed and verified and assessed by performing the Quality Assurance (QA) and risk management which helps to prevent and to reduce the critical fails. This paper introduces the Product Assurance (PA) system and procedures for controlling and monitoring sub-contractors which were participated in Ka band Communication Payload System (COPS) development. Also this paper shows Quality Assurance (QA) procedures and detailed their processes for assured the product performed by local companies from site survey for selecting companies to delivery of their equipment.

  • PDF

Improving Road Construction Productivity by Developing a Programmatic Resource Distribution System for Equipment Sharing in Multi-sectioned Road Construction Projects (다(多)공구 도로 건설 현장의 장비 공유시스템 구축을 통한 생산성 향상에 관한 연구)

  • Koo, Bonsang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.134-145
    • /
    • 2013
  • Road construction projects are parcelled into sub-sections which are then tendered to individual contractors for construction. The type of work and equipments used are similar for each sub-section. However, such equipment are not shared on a regular basis among the contractors and only partially performed in an informal and ad hoc manner. Consequently, road construction equipment suffer from low utilization and increased leasing costs. Lean construction and Program Management approaches stress the importance of collaboration among individual participants in a way that increases the collective cost savings of the entire project. This research attempts to apply such theories with the notion that under utilization of expensive equipment can be improved by formalizing a way to enable the sharing of equipment in large, public sponsored, multi-sectioned road construction projects. A system was developed consisting of a set of criteria and processes that enables automatic allocation of equipment to multiple sites on daily basis, in a way that minimizes equipment costs and improves their individual utility. The system was then applied in allocating three different types of equipment to an actual road construction project with four sub-sections for three months. A new metric, nDPR showed that utilization improved for all equipment and also equipment related costs were decreased by 4.45%. Results also showed that increased shared opportunities of equipment correspond to an increase in utilization and cost savings.