• Title/Summary/Keyword: structure demolition

Search Result 115, Processing Time 0.026 seconds

Case Study of Explosive Demolition for a Structure in Urban Area (Explosive Demolition of Former Sung-Nam City Hall to Construct Sung-Nam City Hospital) (도심지 구조물 발파해체 적용사례 (성남시 의료원 건립을 위한 구성남시청사 발파해체))

  • Jung, Min-Su;Song, Young-Suk;Heo, Eui-Haeng;Kim, Hyo-Jin
    • Explosives and Blasting
    • /
    • v.30 no.1
    • /
    • pp.17-28
    • /
    • 2012
  • Building demolitions at urban area make some inconvenience to neighborhood through generating noises, ground vibrations, and dusts. For this reason, various methods to control such environmental impacts have been being designed and practiced. Among the methods, the use of explosive demolition is rapidly increasing because it can minimize the inconveniency as well as decrease the working time and cost. In this respect, the old Sung-Nam city hall, which was a Rahmen structure comprised of beams, slabs and columns, was decided to be demolished by explosive demolition. This paper shows that explosive demolition can be the most suitable way of removing old buildings eco-friendly, safely, and economically by showing the observation results obtained from the actual demolition operation for the Sung-Nam city hall.

A Study on the Improvement of Safety Management for Military Demolition Works (군 해체공사 안전관리 개선에 관한 연구)

  • Sang Jun, Jeong;Jong Yil, Park
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.6
    • /
    • pp.71-80
    • /
    • 2022
  • Since the 2000s, the demand for private demolition works has been gradually increasing as the apartment housing market has been led by redevelopment and reconstruction. In the case of the military, the Ministry of National Defense is consolidating troops from each military unit to reorganize the unit structure in accordance with Defense Reform 2.0; the plan includes reducing the garrison used by each unit to 70% of its current level. Accordingly, the demand for demolition work in the military is also expected to increase. However, the military regulations do not reflect the relevant laws that have been revised recently. This study identifies regulations and system improvements for demolition work suitable for the military based on an analysis of accident cases that have occurred during demolition work, of domestic and foreign laws and regulations related to military demolition work, and of the problems with current military safety management at each stage of planning, design, and construction. The study subsequently proposes improvements for military demolition work, including budget execution adjustment, the establishment of training courses, on-site inspections, the development of guidelines for military demolition work, the provision of risk assessment standards, and the need for the qualification of equipment operators.

Explosive Demolition of Special Structure of Soongeui Complex Stadium (숭의종합운동장 특수구조물 발파해체)

  • Suk, Chul-Gi;Park, Hoon;Kim, Nae-Hoi;Song, Young-Suk;Jung, Woo-Jin;Han, Dong-Hun
    • Explosives and Blasting
    • /
    • v.28 no.2
    • /
    • pp.108-118
    • /
    • 2010
  • Soongeui complex stadium is a reinforced concrete frame structure composed of columns, slabs and beams. The stadium, however, is also a special structure because it has a tall tower of electronic display board and slabs inside its own structure which is different from the structures that had been demolished using blasting by then. Explosive demolition for the stadium was carried out from the left-hand side of the outfield stand to the right considering 2 rows of columns supporting the stand as a blasting unit. An overturning demolition method was applied to the tower of electronic display board. Water bags that played the role of multipurpose protection were applied to control the dust. As a result, the demolition project of the special structure of Soongeui complex stadium was judged to be a great success.

A Study on the Behavior of Blasting Demolition for a Reinforced Concrete Structure Using Sealed Model Test and Particle Flow Analysis (축소모형실험과 입자결합모델 해석을 통한 철근 콘크리트 구조물의 발파해체 거동에 관한 비교 분석)

  • 채희문;전석원
    • Explosives and Blasting
    • /
    • v.22 no.1
    • /
    • pp.33-43
    • /
    • 2004
  • In this study, a comparison was made between the resulting behaviors of scaled model test and particle flow analysis for blasting demolition of a reinforced concrete structure. For the test and analysis, a progressive failure of a five-story structure was considered. The dimension analysis was carried out to properly scale down the real structure into the laboratory size. The test model was made of the mixture of gypsum, sand and water along with soldering lead to analogy reinforcing steel bars. The ratio of mixing components was chosen to best represent the scaled down strength and deformation modulus. The columns and girders of the structure were precasted in the laboratory and assembled right before the blasting test. The numerical analysis of the blasting demolition was carried out using PFC2D (Particle Flow Analysis 2-Dimension by Itasca). The results of the blasting of concrete lahmen structure showed roughly identical demolition behavior between scaled model test and numerical test. For the blasting of the reinforced concrete structure, the results were more identical and closer to the real demolition behavior, since the demolition behavior was better represented in this case due to the increased tensile strength of the component.

A Suggestion for Improving the Demolition Efficiency of Building Structures (구조물 발파 효율 개선 방안)

  • 안명석;최영천;최원규
    • Explosives and Blasting
    • /
    • v.15 no.1
    • /
    • pp.26-35
    • /
    • 1997
  • The research on the safe and efficient demolition technique of building structure is required due to rapid increase in structures which has the problems of safety and endurance. The techniques of blasting and operation and parameters affecting the efficiency of demolition were analyzed to maximize demolition efficiency. And successful, unsuccessful and near-miss demolition cases in Korea have been investigated so that demolition operation can be safe and accurate.

  • PDF

A Study of Cutting Method of H-Pile for Explosive Demolition of SRC Structure (철골구조물 발파해체를 위한 H형강 절단방법에 대한 연구)

  • Min Hyung-Dong;Lee Yun-Jae;Song Young-Suk;Kim Hyo-Jin
    • Explosives and Blasting
    • /
    • v.23 no.3
    • /
    • pp.83-89
    • /
    • 2005
  • It follows in deterioration of the steel frame structure and becomes remodeling and removal. The construction work characteristic, economical efficiency and stability environment characteristic are planned and considered hereafter control plan of the steel frame structure which is deteriorated currently to cutting mettled plentifully sued on gas cutting of H beam. However it will not be able to apply from the explosives demolition which is makes a weak instantaneously and then collapses the building at the time. In this study, shape charge was used for cutting of the H-beam. That is the element testing to estimate explosives demolition for steel frame structure. As a result, it is found for single-side rutting method, both-sides rutting methods by H-beam thickness and pre-rutting process. It confirmed an affix method and an ease characteristic by fixing tool. Also, it is shown that air blasting decreased about 8dB(A) in order to reduce air blasting used by sand box. However, it will be required to reduce air blasting little more because explosives demolition will be done in urban site.

A Process Model of Eco-friendly Demolition Work for Wall Type Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 (벽식구조 노후 공동주택을 대상으로))

  • Hwang, Young-Gyu;Kim, Ki-Hyun;Kim, Kyung-Ra;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.204-215
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

Development a Process Model of Environment-friendly Demolition Works for Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 개발)

  • Hwang, Young-Gyu;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.85-92
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

  • PDF

Application of Advanced Blast Demolition Simulation Method to the Drill and Blast Design for Demolishing Cylindrical Structures (원통형 구조물의 발파해체설계에 대한 최신 발파해체 시뮬레이션 기법의 적용)

  • Park, Hoon;Suk, Chul-Gi;Kim, Seung-Kon
    • Explosives and Blasting
    • /
    • v.26 no.1
    • /
    • pp.7-14
    • /
    • 2008
  • In order to complete successfully the demolition of a silo structure by means of felling method, structural properties and the geometric design of blast mouth have to be considered. In this study, a commercial software, 3-dimensional applied element analysis (3D AEM), was used to investigate the effect of the geometrical parameters of blast mouth on the collapse behavior of the silo structure.

Effective Arrangement of Non-explosive Demolition Agents and Empty Holes for Improving Fragmentation of Square Concrete Structures (정사각형 콘크리트 구조물의 파쇄도 향상을 위한 비폭성 파쇄제와 천공 홀의 효과적인 배치)

  • Cho, Hwangki;Nam, Yunmin;Kim, Kyeongjin;Lee, Jaeha;Sohn, Dongwoo
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.2
    • /
    • pp.145-151
    • /
    • 2017
  • As an alternative to conventional explosive methods for demolition of concrete structures and rocks, the use of non-explosive demolition agents can be considered to reduce noise, vibration, and dust emissions during the demolition process. In this study, we conduct finite element analysis for crack initiation and propagation caused by the expansion of non-explosive demolition agents in square concrete structures. The predicted crack patterns are compared with the experimental results in the literature. The minimum values of the required expansion pressure of non-explosive demolition agents are also estimated, which depend upon the arrangement of non-explosive demolition agents and empty holes. Furthermore, we investigate the effect of empty holes on the fragmentation of concrete structures, and discuss the effective arrangement of non-explosive demolition agents and empty holes for fragmentation improvement.