• 제목/요약/키워드: stopping time

검색결과 256건 처리시간 0.023초

The Design of Flux Barrier for Improvement of Demagnetization Endurance in BLDC Motor

  • Kim, Cheol-Min;Kim, Dong-Yeong;Cho, Gyu-Won;Kim, Gyu-Tak
    • Journal of Electrical Engineering and Technology
    • /
    • 제9권6호
    • /
    • pp.2181-2186
    • /
    • 2014
  • Generally, the motor inside vehicle is exposed to highly ambient temperature and large vibration according to repeatedly starting and stopping for very short time. So, in this paper, the rotor shape design was performed to improve demagnetization endurance by considering the starting current of the Brushless DC (BLDC) Motor through the Finite Element Method(FEM). As a result, the partial irreversible demagnetization was occurred by starting current at the end of Permanent Magnets of the basic model. To solve this problem, the flux barrier design was performed and the flux on the rotor core was limited. Accordingly, demagnetization endurance and operating characteristics were improved.

A Taguchi Approach to Parameter Setting in a Genetic Algorithm for General Job Shop Scheduling Problem

  • Sun, Ji Ung
    • Industrial Engineering and Management Systems
    • /
    • 제6권2호
    • /
    • pp.119-124
    • /
    • 2007
  • The most difficult and time-intensive issue in the successful implementation of genetic algorithms is to find good parameter setting, one of the most popular subjects of current research in genetic algorithms. In this study, we present a new efficient experimental design method for parameter optimization in a genetic algorithm for general job shop scheduling problem using the Taguchi method. Four genetic parameters including the population size, the crossover rate, the mutation rate, and the stopping condition are treated as design factors. For the performance characteristic, makespan is adopted. The number of jobs, the number of operations required to be processed in each job, and the number of machines are considered as noise factors in generating various job shop environments. A robust design experiment with inner and outer orthogonal arrays is conducted by computer simulation, and the optimal parameter setting is presented which consists of a combination of the level of each design factor. The validity of the optimal parameter setting is investigated by comparing its SN ratios with those obtained by an experiment with full factorial designs.

FEYNMAN-KAC SEMIGROUPS, MARTINGALES AND WAVE OPERATORS

  • Van Casteren, Jan A.
    • 대한수학회지
    • /
    • 제38권2호
    • /
    • pp.227-274
    • /
    • 2001
  • In this paper we intended to discuss the following topics: (1) Notation, generalities, Markov processes. The close relationship between (generators of) Markov processes and the martingale problem is exhibited. A link between the Korovkin property and generators of Feller semigroups is established. (2) Feynman-Kac semigroups: 0-order regular perturbations, pinned Markov measures. A basic representation via distributions of Markov processes is depicted. (3) Dirichlet semigroups: 0-order singular perturbations, harmonic functions, multiplicative functionals. Here a representation theorem of solutions to the heat equation is depicted in terms of the distributions of the underlying Markov process and a suitable stopping time. (4) Sets of finite capacity, wave operators, and related results. In this section a number of results are presented concerning the completeness of scattering systems (and its spectral consequences). (5) Some (abstract) problems related to Neumann semigroups: 1st order perturbations. In this section some rather abstract problems are presented, which lie on the borderline between first order perturbations together with their boundary limits (Neumann type boundary conditions and) and reflected Markov processes.

  • PDF

Load Flow Calculation and Short Circuit Fault Transients in AC Electrified Railways

  • Hosseini, Seyed Hossein;Shahnia, Farhad
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2005년도 ICCAS
    • /
    • pp.2203-2206
    • /
    • 2005
  • A load flow and short circuit fault simulation of AC electrified railway distribution systems is presented with DIgSILENT PowerFactory software. Load flow of electrified railways distribution system with concerning multi train lines and dynamic characteristics of train load is studied for different time laps. The dynamic characteristics of train load in starting and braking conditions with different starting and stopping times and its moving positions makes the load flow complicated so there is a great need in studying the effects of electrified railways on load flow. Short circuit fault transients is also studied and simulated for both power system or traction distribution system and their effects on the operation of the train sets is investigated.

  • PDF

라인 무정지 사이드 트리머 개발 (Development of Side Trimmer with Line Non-Stop)

  • 김선호;이점판;조행득
    • 한국기계가공학회지
    • /
    • 제14권4호
    • /
    • pp.146-150
    • /
    • 2015
  • Steel is produced through the steel-making process with a desired shape by a rolling press. Scrap is removed according to the sheet edge to improve the quality of the product. This machine is called a side trimmer. This study aimed to develop a side trimmer for automatically changing the width of the trimming knife without line stopping. This machine consists of a housing opening device and a turning device. The measuring technologies of sheet width, trimming knife rotation angle, and knife gap for increasing the control accuracy. This experiment was conducted to evaluate the performance of the developed technologies. It was reduced by 10% compared with the operation time of the conventional method.

CLOSED-FORM SOLUTIONS OF AMERICAN PERPETUAL PUT OPTION UNDER A STRUCTURALLY CHANGING ASSET

  • Shin, Dong-Hoon
    • Journal of the Korean Society for Industrial and Applied Mathematics
    • /
    • 제15권2호
    • /
    • pp.151-160
    • /
    • 2011
  • Typically, it is hard to find a closed form solution of option pricing formula under an asset governed by a change point process. In this paper we derive a closed-form solution of the valuation function for an American perpetual put option under an asset having a change point. Structural changes are formulated through a change-point process with a Markov chain. The modified smooth-fit technique is used to obtain the closed-form valuation function. We also guarantee the optimality of the solution via the proof of a corresponding verification theorem. Numerical examples are included to illustrate the results.

비정규화 데이터를 이용한 신경망 소프트웨어 신뢰성 예측 (Neural Network for Softwar Reliability Prediction ith Unnormalized Data)

  • 이상운
    • 한국정보처리학회논문지
    • /
    • 제7권5호
    • /
    • pp.1419-1425
    • /
    • 2000
  • When we predict of software reliability, we can't know the testing stopping time and how many faults be residues in software the (the maximum value of data) during these software testing process, therefore we assume the maximum value and the training result can be inaccuracy. In this paper, we present neural network approach for software reliability prediction with unnormalized (actual or original collected) data. This approach is not consider the maximum value of data and possible use the network without normalizing but the predictive accuracy is better. Also, the unnormalized method shows better predictive accuracy than the normalized method given by maximum value. Therefore, we can make the best use of this model in software reliability prediction using unnormalized data.

  • PDF

Computer Testing System for Pumps

  • Xiao, Chongren
    • 한국농업기계학회:학술대회논문집
    • /
    • 한국농업기계학회 1996년도 International Conference on Agricultural Machinery Engineering Proceedings
    • /
    • pp.598-606
    • /
    • 1996
  • Computer testing system for pumps is an automatic measuring and testing system micro computer. There are two functions to this system. 1. Automatically controlling the testing processes. It includes controlling to testing devices, adjusting test points and starting or stopping the pump. 2. Automatically collecting and calculating the testing data. It includes the collection and calculation of the parameters to be measured, printing the testing reports and plotting the testing curves. When using it the measuring accuracy may be improved and the time for testing may be compressed by use the system . So it is used widely on the world. In this paper the basic construction and the work principle and the testing processes are described.

  • PDF

Complex Regional Pain Syndrome (CRPS type-1) in an Adolescent Following Extravasation of Dextrose Containing Fluid-an Underdiagnosed Case

  • Subedi, Asish;Bhattarai, Balkrishna;Biswas, Binay K.;Khatiwada, Sindhu
    • The Korean Journal of Pain
    • /
    • 제24권2호
    • /
    • pp.112-114
    • /
    • 2011
  • Due to its complex pathophysiology and wide spectrum of clinical manifestations, the diagnosis of CRPS is often missed in the early stage by primary care physicians. After being treated by a primary care physician for 5 months for chronic cellulitis, a 16-year-old girl was referred to our hospital with features of type-1 CRPS of the right upper extremity. Inability to diagnose early caused prolonged suffering to the girl with all the consequence of CRPS. The patient responded well with marked functional recovery from multimodal therapy. Ability to distinguish CRPS from other pain conditions, referral for specialty care at the appropriate time and full awareness of this condition and its clinical features among various healthcare professionals are essential in reducing patient suffering and stopping its progression towards difficult-to-treat situations.

초고압 지중 케이블 시스템에 대한 편단접지시의 보호대책 (A Protection Method with single-bonding system in EHV Underground Transmission Line)

  • 김장원;강덕환;박근룡;김영범
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 하계학술대회 논문집 E
    • /
    • pp.1620-1622
    • /
    • 1998
  • The failure occurs in the system of the underground transmission line, the time of restoration is very long, the damage from stopping power supply is very serious and the cost of restoration is very great. because of these problems, the system and equipment must be protected from every electrical failure by installing protection unit. This study is summarized and compared the effects of configuration method of cable protection device with respect to surges in EHV (Extra High Voltage) underground transmission system.

  • PDF