Journal of Korean Society of Industrial and Systems Engineering
/
v.18
no.33
/
pp.11-27
/
1995
This study sets a goal of establishing work standard and standard time in a machine tool process consisted of high-priced NC machine tools. Firstly, the theories of work standard and standard time in the field of NC machine tools are studies. Secondly, the theories are actually applied to a manufacturing company; work standard sheets are developed and applied to a machining center haying low operation rate, and then the increase in productivity is compared. Finally, problems to be studied later in relation to work standard and standard time are presented.
The purpose of this study was to determine the standard work time of dietetic staff through work sampling methodology in school flood service systems. Work measurement through work sampling methodology was conducted in five conventional, five commissary and five joint management flood service systems over two consecutive weeks in October 1999. Statistical analysis was performed on the SAS/Win 6.12 package program for Kruskal-Wallis test and multiple comparison. Observed data were satisfied with a confidence level of 95% and a confidence interval of $\pm$ 0.05. The results of this study can be summarized as follows. The actual time spent by dietetic staff members in conventional, commissary, joint-management flood servile systems was 2,394, 2,521 and 2,110 minutes per week, respectively. Transportation time of each flood service systeml and ILO allowance rate (11%) was applied. Thus, the standard work time per week of dietetic staff members in conventional, commissary, joint-management flood service systems was 2,746.14, 2,861.58 and 2,520.81 minutes, respectively. The standardized index was 1.04, 1.08 and 0.95 men in conventional, commissary, and joint-management flood service systems, respectively. Regardless of the school flood service system, those with "the duty of cooking and distribution management" had the longest labor time, while those with "duty of nutritional education" had the shortest labor time.
Objective: This study aims to analyze qualitatively if PTS methods are applicable to the agricultural works of Korea. Background: Many studies on setting standard time have been performed for manufacturing and service industries, not many studies on agricultural work have been carried out domestically and internationally. Method: MTM, MOST, Work Factor, MODAPTS were applied to some agricultural works, and limitations of each method were found out. Results: MTM was found to be more applicable than other methods, except for mental works. Conclusion: In general, many Korean agricultural works need squat postures, which are not taken into account in most of PTS methods. Continuous observation with stop watch is recommended for establishing the standard time for the agricultural works of Korea. Application: The information drawn from this study would be helpful to the farmer safety assurance system being established by Korean government.
The purpose of this study was to improve productivity for maximum effects with the present equipments and staff. This study compared and analyzed the mea-sured time by using stop watch method and MTM, which was the new measuring method. The flow and results of this study were as follows: 1. This study investigated the theoretical background the efficiency for production management, and the way of productivity improvement through documentary research. 2. Setting up the standard flow on the experi-mental company production, making out a process chart and measuring the actual working hour. 3. The study measured the allowance time applying work sampling. 4. Each process of the movement analysis was filmed by video to use basic data. 5. MTM analysis was taken by choosing 10 processes from front bodice according to the basic movement of MTM. Through the results, this study exclude unneccesary movements and suggest a method for working ways. 6. Using the actual working hour measured by a stop watch calculated the pitch time and presumed the amount of daily productivity. 7. The result of the work sampling came out as 38% of allowance rate. It was 13% higher than the standard amount of woman's jacket allowance rate, which was 25%. The most influencing factor was work discussion. That was because there were commuication problem of the work way between the operator and leader. More adequate use of flow table and level passing table was needed. There were the problems that inappropriate places and sizes made the distance of movements longer and often needed more adjustment of works and surroundings. To prevent breakdowns equipments check ups were necessary before works. 8. The results of MTM analysis were as follow : the time was reduced 40% than the actual measured time by a stop watch. This was because the leveling of the operator was included in the real calculation. Also, leveling was included in MTM analysis and all the conditions were standarized. Therefore MTM method was a scientidic measuring way of establishing the standard time. The presented method of this study, suggested an ideal method eliminating unneccesary motions, and presented standardization of works. Improvement of working methods, work condition and simplifying motions in each 10 processes reduced the working time from total 656 seconds to 301 seconds. 9. The way and time of working was linked together in the MTM analysis methods. Thus data from MTM help suggest not only establishing standard time but also establishing stan-dard work. Plus it includes various ability for improvements of working ways. So it is an objective method which can be widely used in other work studies. 10. The function of a time study is to determine the amount of work produced with a given method. The work rate is used to establish the cost of labor. The wage of worker must be calculated per unit time which is deter-mined before the time study is made. This study tried to introduce the incentive rule for deciding wages according to the standard time by MTM method.
Journal of Korean Society of Industrial and Systems Engineering
/
v.4
no.5
/
pp.27-42
/
1981
The object of this paper is to Study the work measurement which is one of the principal technique in work study for the improvement of Productivity in the foundry industry. Most of domestic mechanical enterprise using the expensive foreign machinerise is inoufficient for the standardization of the operation method and time. Therefore, the improvement of operation and productivity through the introduction of the work measurement is an urgent task. Therefore, this paper is contribute to the improvement of operation and to reduce the loss time through the application of the work measurement based on the case study conducted at W-Foundry Corporation. The summary of this study is follows; 1. The measurement of operation efficiency can be accomplished by the standard time. 2. The detailed causes and counter-proposal of loss time can be established, 3. More than 50% of loss time is attributed to c/p.
In these days, the PCs are widely used in the mid-level factory. But they have low-effectiveness for using them. The main reason should be the lack of useful and practical software in the market. This Case study aimed at the support of the software using DB Language to get M/M chart for aquiring work study and standard time data in the mid-level factory having multi-item and multi-process type. CVA (Chronocycle Video Analysis) is applied to get basic standard time data and working list. Standard time, Sequence of working and allowance time or rate for man and machine will be readily obtained through the menu when the software executing. Detailed program list is systematically shown in Appendix.
Journal of Korean Society of Industrial and Systems Engineering
/
v.11
no.18
/
pp.41-57
/
1988
This study was carried out to furnish information for the appropriate standard work time measure and applicate system development that help for korean manufacturers. As a research methodology of the study, the questionnaire survey by sampling nine hundreds registerd corporation, was conducted to find the scientific management technique level (for especially standard work time). By crossectionally analyzing the survey results, placed primary emphasis on the study to comparison with employee scale and types of industry classify. The contents of subjective study art as follows; (1) Establish state of standard time(S. T) (2) Mainly technique for establish S. T (3) Institute level and correctness of S. T (4) Practical use of S. T (5) Performance rating and Allowance rate (6) Advantage and disadvantage to application results.
Journal of Korean Society of Industrial and Systems Engineering
/
v.24
no.62
/
pp.49-58
/
2001
In recent years, a number of robot work measurement systems have been developed. This study discusses CARS (Computer Aided Romum System) which is to computerize the existed manual version ROMUM (RObot Modularization of the Unit Motion) method as the predetermined time system for robot work measurement. The ROMUM was developed to establish the standard time of work through modularize the unit motions in robot tasks. The CARS is designed on a menu driven form by computer assist for user interface and then interacts with user effectively. Therefore, the system can provide the convenience of use and minimization of analysis time and degree of judgement for establishing standard time.
This study examined the work time, work posture, and work intensity for the actual measurement step in forest road the design work that was being carried out. The measurement of the forest road was being carried by a team of three workers and a team of four workers. The examination of work time found that the measurement of 1km took about 8 hours for the four-worker team and 12 hours for the three-worker team. The examination of work intensity found that the energy metabolic rates of the three-worker team were lower than four-worker team. Because their energy consumption per minute decreased as their work time and rest time increased. Furthermore, when appropriate rest time was applied according to work time, the energy metabolic rate decreased and the work intensity became lower. The four-worker team was more advantageous from the time and cost aspects of the forest road measurement work. Furthermore, as the rest time was very low compared to the work time, more efficient forest road measurement work would be possible if the work intensity was lowered by considering the rest time when calculating the standard work time.
The definition of cycle time is the time from the wafer start to the wafer output. It usually takes one or two months to get the product since customer decides to produce it. The cycle time is a critical factor for customer satisfaction because it represents the response time to the market. Long cycle time reflects the ineffective investment for the capital. The cycle time is very important for foundry because long cycle time will cause customer unsatisfied and the order loss. Consequently, all of the foundries put lots of human source in the cycle time improvement. Usually, we make decisions based on the experience in the cycle time management. We have no mechanism or theory for cycle time management. We do work-in-process (WIP) management based on turn rate and standard WIP (STD WIP) set by experiences. But the experience didn't mean the optimal solution, when the situation changed, the cycle time or the standard WIP will also be changed. The experience will not always be applicable. If we only have the experience and no mechanism, management will not be work out. After interview several foundry fab managers, all of the fab can't reflect the situation. That is, all of them will have an impact period after product mix or utilization varied. In this study, we want to develop a formula for standard WIP and use statistical process control (SPC) concept to set WIP upper/lower limit level. When WIP exceed the limit level, it will trigger action plans to compensate WIP Profile. If WIP Profile balances, we don't need too much WIP. So WIP level could be reduced and cycle time also could be reduced.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.