• 제목/요약/키워드: standard unit

검색결과 1,831건 처리시간 0.026초

A Study on the Revision of Construction Standard Unit Price for Interior Finishing Work and Carpentry Work (건설공사 표준시장단가의 수장공사 및 목공사 개정에 관한 연구)

  • Lee, Ju-hyun;Baek, Seung-ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.245-246
    • /
    • 2023
  • A construction site survey is carried out for the Construction Standard Unit Price(CSUP) in order to establish a standard for the appropriate estimated price. This paper proposed the revised plan by surveying the 56 sites under construction from March to October 2022 for interior finishing work and Carpentry work. It is expected that the revision of the CSUP for interior finishing work and Carpentry work will more accurately reflect the actual construction situation and contribute to improving the adequacy of the CSUP.

  • PDF

The Investigation on Application of Construction Waste Unit to Establish Resource Recycling System through Case Study (건설폐기물 자원순환체계 구축을 위한 발생원단위 적용에 관한 연구)

  • Son, Byeung Hun;Hong, Won Hwa
    • KIEAE Journal
    • /
    • 제10권5호
    • /
    • pp.181-186
    • /
    • 2010
  • Research on construction waste unit was in progress in the 1995 when 'Proper Disposal and Recycling Measures for Construction Waste' was made by the Seoul Development Institute. Such an effort has been made in order to cope with the lack of natural resources in Korea and to utilize the reusable resources. Furthermore, these efforts have also increased due to the improved standing of Korea in the international community. A large number of residential buildings were built in the response to the government's policy by increasing the supply of houses between the 1970's and 1980's. In 2000, more reconstruction and redevelopment was done because of the aged buildings and change of use for those buildings. And the project has been actively promoted until now, which caused a sharp increase in the generation volume of construction waste. In Korea, 8 kinds of construction waste unit, including the standard construction manpower and materials estimation, are introduced. Currently, they provide standards to different building categories and waste properties while for construction sites different standards are applied. This study aims to measure the actual amount of construction waste after sample buildings are dismantled and analyzes the estimation of the waste quantity by using various standard units. Through comparison, this study will figure out the differences among the standard units in order to find out how to apply the standard units properly. Moreover, this research will provide practical measures to apply such units to construction sites.

Establishment of Standard Times Using STD Technique in Multi-product and One-unit Production Systems (다품종 단일제품생산 시스템에서 표준시간 자료법을 이용한 표준시간의 설정)

  • 박성학;최성운
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • 제10권16호
    • /
    • pp.27-38
    • /
    • 1987
  • This paper develops a standard time table using STD(Standard Tine Data) Technique in multi-product and one-unit production systems. STD leads to greater consistency between similar jobs. The constant-time and special elements will always be the same even though they pertain to different part numbers. Actually, the standards will very based on the size of the variable elements that are in control of the time. A real-field example is presented.

  • PDF

Study of a Online Survey System for Monitering of Construction Cost on Construction Site (건설현장 시장가격 모니터링을 위한 온라인 상시조사에 관한 기초연구)

  • Lee, Ju-hyun;Baek, Seung Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.202-203
    • /
    • 2020
  • Unlike price calculation by cost accounting, which categorizes costs into material costs, labor costs, and miscellaneous expenses to determine the construction budget price, construction cost calculation based on Construction Standard Unit Prices utilizes unit prices extracted from market prices of items from projects already completed to estimate costs of similar construction projects. Although unit price information is collected through construction site surveys to revise these construction standard unit prices every year, but due to the limitations of the site survey method, it is difficult to quickly implement the rapid changes in the construction methods and market prices. As such, an important issue that arose was the identification of work items whose prices need urgent revision. This study conducted research on factors that need to be considered when developing online survey system for monitoring construction site market prices. This study is expected to enhance convenience for users, and provide an efficient data collection and management system for administrators.

  • PDF

An Analysis of Unit Care Characteristics of Large Skilled Nursing Facilities for the Elderly in City Areas (도심지역 대규모 노인전문요양시설의 단위공간별 특성 분석)

  • Lee, Min-Ah
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 한국실내디자인학회 2007년도 춘계학술대회 논문집
    • /
    • pp.49-52
    • /
    • 2007
  • The purpose of this study was to investigate unit care characteristics of large skilled nursing facilities for the elderly, which are located in city areas, and to discuss the way of encouraging home-like atmosphere in perspective of spatial unit. First of all, the analysis of five facilities opened before 2002 was performed, based on previous studies, to compare with them opened in recent 5 years. Most of the previous facilities did not have differentiation between their residential and nursing units, and the number of residents in each unit were excessive in comparison with the standard limit(12-28). On the contrary, the facilities established in recent 5 years had systematic spatial unit structure. The residential units had basically rooms and spaces for small group and the number of elderly residents per unit was appropriate on the basis of standard limit which was suggested by Kwon(2002). The nursing units were consist of nursing station, 2-3 residential units, spaces for large group of residents, hair dressing, nurse, living assistant, bathing, storage and etc. But, there was a problem In space usage even though they have distinct unit care systems. Some spaces for groups were empty without residents, furniture, and other equipments, which were necessary for unit care.

  • PDF

A Study on the Standard of Cost Estimation in the Construction of Pavement and Maintenance (도로포장 및 유지공사 표준품셈 개정 방법에 대한 연구)

  • Jung, Dae-Kwon;Tae, Yong-Ho;Ahn, Bang-Ryul;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • 제11권1호
    • /
    • pp.85-94
    • /
    • 2009
  • In cost estimation of construction, several methods including quantity-per-unit costing, job costing, unit cost estimation and lumpsum estimation are being utilized in Korea. Among them, a Quantity-per-unit Costing Method is used as a standard of cost estimation in public and private works. This paper presents the realistic job-costing method on all road construction tasks through statistical analyses with field survey data to solve the problems induced by the existing quantity-per-unit costing method. Furthermore, it was found that the newly developed job costing method is able to produce a simple costing procedure and a more actual construction cost estimation by a case study, which was performed to compare particular construction costs produced by two different methods, existing quantity-per-unit costing and newly developed job costing. These methods is compared by Case-study about sub-base. In the case of Job costing method, the estimate is shorter than the other case about 50% and can make up for the weak point about instrument in the current Standard of cost estimation. And it can be depict by Job Costing method about progress of work for using by a plan about construction management.

  • PDF

The Study of Complex RF Unit in WiBro Base Station for Wave 2 Standard (Wave 2 규격을 위한 와이브로 기지국용 일체형 복합 RF unit 연구)

  • Choi, DooHun;Moon, Yon-Tae;Kim, Do-Gyun;Choi, Young-Wan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • 제57권9호
    • /
    • pp.1660-1668
    • /
    • 2008
  • The WiBro was adopted to the 3G international standard. By the change of specification from Wave 1 to Wave 2, MIMO technology is applied in order to increase the speed of downlink. By MIMO the RF part of WiBro base station is increased to 2 Tx paths. Therefore, the size of RF part is bigger and material cost is increased. For reducing these demerits, the RF part which is consisted of PA, LNA, and TDD switch is designed to one complex RF unit. Also, the experimental results of the RF unit have been discussed. Since the complex RF unit is more compact than the RF part of Wave 1 base station, it can be used as the RF part of Wave 2 base station with 2T/2R MIMO.

A Studies of Amendment a Standard of Estimated Unit Manpower and Material of Landscape Architectural Construction Work Classification (조경공사 표준품셈 공종 개정에 관한 연구)

  • Yun, Ju-Cheul;Lee, Kwan-Hee
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • 제39권5호
    • /
    • pp.119-126
    • /
    • 2011
  • The standard unit manpower and material in landscape architectural construction was consist of a standard and universal work classification. However, these constructional methods have created a number of problems in utilizing and responding on a variety of recently-developed working methods such as new constructional skills and technologies. This research decided that presenting the amendments of work classification of a standard unit manpower and material in landscape architectural construction was very important, and investigated those work classifications which required these new amendments. First of all, assessment items were selected through the literature reviews and a preliminary survey. Then, these assessment items were surveyed to the total of 60 professional landscape architecture field. The results of this study were as follows; First, the utilization level of the a standard unit manpower and material in landscape architectural construction was highest in the area of work classification of planting unit manpower and material. Second, the work classifications that needed to be added were recognized as leveling the ground construction, landscape structure construction, paving construction, water facilities construction, and outdoor facilities construction. Third, in the field of the a standard unit manpower and material in landscape architectural construction, 66.7% of the respondents replied that some amendments were necessary, and those amendments needed work classifications were identified as work classification of planting unit manpower and material was gigantic plant, topiary tree, temporary planting, exchange dead tree, etc. In the area of digging out was gigantic plant and plastic tree were recognized. The survey respondents also answered that, in keeping and management work classifications some amendments in pruning waste were necessary, and in the fields of rubble masonry work classifications some improvements were required in rubble aperture planting unit manpower and material and sodding and herbaceous sowing was a realistic lawn size unit manpower and material was needed. Based on the results explained above, this study suggests that amendments for a standard unit manpower and material in landscape architectural construction are necessary, especially in the areas of planting size and quality of work classifications unit manpower and material and in the unit manpower and material that affects the quality of lands caping constructions.

The method for the classification according to their kinds and the estimation of unit generation rate for promoting recycling of construction and demolition(c&d) debris (건설폐기물 재활용촉진을 위한 종류별 분류 및 발생원단위 산정 방안)

  • Lee, Hi Sun;Kim, Dong Sik
    • Journal of the Society of Disaster Information
    • /
    • 제4권1호
    • /
    • pp.86-100
    • /
    • 2008
  • It is needed to classify the kinds of construction and demolition(c&d) debris to 6 catagories of waste concrete, waste asphalt concrete, waste wood, scraps, combustible waste and incombustible waste in order to properly do a separate discharge and to estimate unit generation rate in construction site. Also, in this case, the unit treating cost for mixed wastes should be applied with the unit treating cost for combustible waste. The construction standard materials estimation data is used for basic data for estimating unit generation rate. The mixed wastes in this data should be classified to waste wood, combustible waste and incombustible waste, and their ratio is obtained by using the unit generation rate of Asia Pacific Environment and Management Institute and Seoul Metropolitan Development Institute. The waste amounts generated from newly-built construction can be obtained from multiplying the loss rate by the amount of materials used from construction standard estimation data. Also, those from dismantling construction can be obtained by subtracting waste amount generated during newly-built construction from total input amount of materials in newly-built construction. Those in two cases can be used in construction site. It can be used for estimating the amount generated and establishing the treating plan in the case of setting up the policy of waste management and doing the environment impact assessment.

  • PDF