• Title/Summary/Keyword: standard of cost estimation

Search Result 219, Processing Time 0.025 seconds

A Study on Development of Integrated Management System for BIM Property Information (BIM 라이브러리 속성정보 통합관리 체계 개발에 관한 연구)

  • Shin, Jihye;Choi, Jungsik;Kim, Inhan;Yoon, Dooyoung
    • Korean Journal of Computational Design and Engineering
    • /
    • v.21 no.2
    • /
    • pp.130-142
    • /
    • 2016
  • BIM library, as a systematic collection of BIM objects where the building information is stored, is a vital factor to construct the BIM based work environment. However, construction business is faced the problems relating BIM library such as the absence of the standard for establishing BIM library, the discontinuity of BIM library's compatibility and the lack of practice applicable BIM library. These problems cause the decreasing work efficiency and the recreating BIM model, by delivering inefficient information required in each stage and application field. The purpose of this study is to suggest the integrated management system for property information of BIM library in order to minimize the reworking and to manage information of each stage and application field when exchanging and sharing information. To achieve this, the BIM information classification, the criteria of property requirements for information exchange in BIM application field and the BIM library management system are developed. This study could contributes to ensuring the reliability and accuracy of results of BIM based analysis and to enhancing the speed of business process with sharing and exchanging building information utilizing a single BIM model.

Maximum Terminal Interconnection by a Given Length using Rectilinear Edge

  • Kim, Minkwon;Kim, Yeonsoo;Kim, Hanna;Hwang, Byungyeon
    • Journal of information and communication convergence engineering
    • /
    • v.19 no.2
    • /
    • pp.114-119
    • /
    • 2021
  • This paper proposes a method to find an optimal T' with the most terminal of the subset of T' trees that can be connected by a given length by improving a memetic genetic algorithm within several constraints, when the set of terminal T is given to the Euclidean plane R2. Constraint (1) is that a given length cannot connect all terminals of T, and (2) considers only the rectilinear layout of the edge connecting each terminal. The construction of interconnections has been used in various design-related areas, from network to architecture. Among these areas, there are cases where only the rectilinear layout is considered, such as wiring paths in the computer network and VLSI design, network design, and circuit connection length estimation in standard cell deployment. Therefore, the heuristics proposed in this paper are expected to provide various cost savings in the rectilinear layout.

A Model for Estimation Software Development Team Size (소프트웨어 개발팀 규모 추정 모델)

  • 이상운
    • Journal of KIISE:Software and Applications
    • /
    • v.29 no.12
    • /
    • pp.873-882
    • /
    • 2002
  • Estimation of development cost, effort and time is difficult and a key problem of software engineering in the early stage of software development. These are estimated by using the function point which is measured from a requirement specification. However, it is often a serious Question of the staffing level required for the software development. The purpose of this paper is to show us the model which can be used to estimate a size of development team. Three hundred one software projects have been analyzed and studied for the model. First, an analysis was conducted for statistical algorithmic model. After various data transformation and regression analysis, it was concluded that no good model was available. Therefore, non-algorithmic model was suggested for analysis, which has random distribution of residuals and makes good performance using RBF (Radial Basis Function) network. Since the model provides a standard to determine the required size of development team, it ran be used as management information.

A Study on the Optimization plan for Standardization of Engineering Drawing (설계도면 작성기준 최적화 방안에 관한 연구)

  • Kim, Suk-Su;Song, Jae-ho
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.23 no.1
    • /
    • pp.57-64
    • /
    • 2020
  • The construction market became generally opened to overseas and the domestic construction industry has competed with the international construction enterprise of which technical knowledge is superior. In order to compete with the international construction companies, domestic construction industry needs more continuous promotions on the research and development for improving the level of technique of the construction engineering to meet the international norm. This study aims to suggest the better standards of engineering output such as drawings and specifications to correspond the changing integration system and bidding system in preparation for growing international competition. The study starts with comparison and analyses of domestic and international methods and standards for preparing design drawings. And it continues to delve into actual drawing preparation practices, especially focusing on the ones for road and subway construction. Finally, the study presents a better way of the standardization of the main drawings such as general plan, longitudinal drawing, cross section, structural drawings and temporary structure for new bidding systems of historical cost estimation and whole specification tender and for promotion of international competitiveness.

Photovoltaic Hybrid Systems Reliability and Availability

  • Zahran, Mohamed B.A.
    • Journal of Power Electronics
    • /
    • v.3 no.3
    • /
    • pp.145-150
    • /
    • 2003
  • Reliability, availability, and cost have been the major concerns for photovoltaic hybrid systems since their beginning as primary sources for much critical applications like communication units and repeaters. This paper descnbes the performance of two hybrid systems, photovoltaic-battery, wind-turbine coupled with the public-grid (PVBWG) hybrid system and photovoltaic-battery, wind-turbine coupled With the diesel generator (PVBWD) hybrid system The systems are sized to power a typical 300W/48V de telecommunication load continuously throughout the year Such hybrid systems consist of subsystems, which in turn consist of components Failure of anyone of these components may cause failure of the entire system. The reliability and availability basics, and estimation procedure for the two proposals are introduced also in this paper. The PVBWG and PVBWD system configurations are shown with the relevant mean-time-between-faIlure (MTBF) and failure rate (${\lambda}$) of each component. The characteristics equations of the two systems are deduced as a function of operating hours and the percentage of sun and wind availabilities per day. The system probability failure as well as the reliability is estimated based on the fault tree analysis technique. The results show that, by using standard or normal components MTBF, the PVBWG is more reliable and the time of periodic maintenance period is more than one year especially in the rich sites of both sun and wind, but PVBWD competes else Also, in the first five years from the system installation, the system is quit reliable and may not require any maintenance. The results show also, as the sun and wind are available, as the system reliable and available.

Estimation of Penetration Depth Using Acceleration Signal Analysis for Underwater Free Fall Cone Penetration Tester

  • Seo, Jung-min;Shin, Changjoo;Kwon, OSoon;Jang, In Sung;Kang, Hyoun;Won, Sung Gyu
    • Journal of Ocean Engineering and Technology
    • /
    • v.34 no.3
    • /
    • pp.202-207
    • /
    • 2020
  • A track-type underwater construction robot (URI-R) was developed by the Korea Institute of Ocean Science & Technology. Because URI-R uses tracks to move on the seabed, insufficient ground strength may hinder its movement. For smooth operation of URI-R on the seabed, it is important to determine the geotechnical properties of the seabed. To determine these properties, standard penetration test (SPT), cone penetration test (CPT), and sampling are used on land. However, these tests cannot be applied on the seabed due to a high cost owing to the vessel, crane, sampler, and analysis time. To overcome these problems, a free fall cone penetration tester (FFCPT) is being developed. The FFCPT is a device that acquires the geotechnical properties during impact/penetration/finish phases by free fall in water. Depth information is crucial during soil data acquisition. As the FFCPT cannot measure the penetration depth directly, it is estimated indirectly using acceleration. The estimated penetration depth was verified by results of real tests conducted on land.

Automatic design, planning and drawing of scaffolding system for constructions

  • Hara, Takashi;Shimomura, Katsukiyo;Hamano, Keita;Miyake, Shoko
    • Advances in Computational Design
    • /
    • v.4 no.2
    • /
    • pp.179-196
    • /
    • 2019
  • Temporary scaffold systems in the construction site play an important role for ensuring the safety of the workers and for constructing the stable structures. To assemble the scaffold, the pipe scaffolding system, the wedge binding scaffolding system and the particular materials have been utilized. To design the material arrangement of a scaffold, firstly the configuration was determined considering the construction geometry. Then, the strength of the scaffold was confirmed and the quantity of the material was accounted. In this paper, the design method of the temporary scaffold was proposed for intending the semi-automatic procedure. In the proposed design method, the geometric design and the safety requirement were specified by the safety standard and the design flow was followed by the designer's knowledge. The size and the quantities of the materials were calculated by referring to the relation between the scaffold and the constructing structure. In the calculating procedure, three dimensional positions of each scaffold materials were calculated and recorded simultaneously. Then, three dimensional scaffold structural was drawn semi-automatically on the CAD software by using the obtained material sizes, positions and directions. The proposed design method provides us the precise quantities of scaffold materials and enables us to reduce the design effort and the cost estimation processes. In addition, the obtained results can be applied to BIM software after converting to IFC format.

Pulse wave analysis system using wrist type oximeter for u-Health service (u-Health 서비스 지원을 위한 착용형 옥시미터를 이용한 맥파 분석 시스템)

  • Jung, Sang-Joong;Seo, Yong-Su;Chung, Wan-Young
    • Journal of Sensor Science and Technology
    • /
    • v.19 no.1
    • /
    • pp.17-24
    • /
    • 2010
  • This paper describes a real time reliable monitoring method and analysis system using wrist type oximeter for ubiquitous healthcare service based on IEEE 802.15.4 standard. Photoplethysmograph(PPG) is simple and cost effective technique to measure blood volume change. In order to obtain and monitor physiological body signals continuously, a small size and low power consumption wrist type oximeter is designed for the measurement of oxygen saturation of a patient unobtrusively. The measured data is transferred to a central PC or server computer by using wireless sensor nodes in wireless sensor network for storage and analysis purposes. LabVIEW server program is designed to monitor stress indicator from heart rate variability(HRV) and process the measured PPG to accelerated plethysmograph(APG) by appling second order derivatives in server PC. These experimental results demonstrate that APG can precisely describe the features of an individual's PPG and be used as estimation of vascular elasticity for blood circulation.

Hardware Implementation of Past Multi-resolution Motion Estimator for MPEG-4 AVC (MPEG-4 AVC를 위한 고속 다해상도 움직임 추정기의 하드웨어 구현)

  • Lim Young-hun;Jeong Yong-jin
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.29 no.11C
    • /
    • pp.1541-1550
    • /
    • 2004
  • In this paper, we propose an advanced hardware architecture for fast multi-resolution motion estimation of the video coding standard MPEG-1,2 and MPEG-4 AVC. We describe the algorithm and derive hardware architecture emphasizing the importance of area for low cost and fast operation by using the shared memory, the special ram architecture, the motion vector for 4 pixel x 4 pixel, the spiral search and so on. The proposed architecture has been verified by ARM-interfaced emulation board using Excalibur Altera FPGA and also by ASIC synthesis using Samsung 0.18 m CMOS cell library. The ASIC synthesis result shows that the proposed hardware can operate at 140 MHz, processing more than 1,100 QCIF video frames or 70 4CIF video frames per second. The hardware is going to be used as a core module when implementing a complete MPEG-4 AVC video encoder ASIC for real-time multimedia application.

Seismic vulnerability macrozonation map of SMRFs located in Tehran via reliability framework

  • Amini, Ali;Kia, Mehdi;Bayat, Mahmoud
    • Structural Engineering and Mechanics
    • /
    • v.78 no.3
    • /
    • pp.351-368
    • /
    • 2021
  • This paper, by applying a reliability-based framework, develops seismic vulnerability macrozonation maps for Tehran, the capital and one of the most earthquake-vulnerable city of Iran. Seismic performance assessment of 3-, 4- and 5-story steel moment resisting frames (SMRFs), designed according to ASCE/SEI 41-17 and Iranian Code of Practice for Seismic Resistant Design of Buildings (2800 Standard), is investigated in terms of overall maximum inter-story drift ratio (MIDR) and unit repair cost ratio which is hereafter known as "damage ratio". To this end, Tehran city is first meshed into a network of 66 points to numerically locate low- to mid-rise SMRFs. Active faults around Tehran are next modeled explicitly. Two different combination of faults, based on available seismological data, are then developed to explore the impact of choosing a proper seismic scenario. In addition, soil effect is exclusively addressed. After building analytical models, reliability methods in combination with structure-specific probabilistic models are applied to predict demand and damage ratio of structures in a cost-effective paradigm. Due to capability of proposed methodology incorporating both aleatory and epistemic uncertainties explicitly, this framework which is centered on the regional demand and damage ratio estimation via structure-specific characteristics can efficiently pave the way for decision makers to find the most vulnerable area in a regional scale. This technical basis can also be adapted to any other structures which the demand and/or damage ratio prediction models are developed.