• Title/Summary/Keyword: spillway

Search Result 163, Processing Time 0.039 seconds

Evaluation on the leakage of ground-water through fractured rock under a spillway (여수로 구조물 하부 암반 내 발달한 절리들을 통한 지하수 누수량 분석)

  • Kim, Hyoung-Soo;Lee, Ju-Hyun;Jeong, Ui-Jin;Lee, Joong-Woo
    • Journal of the Korean Geophysical Society
    • /
    • v.9 no.2
    • /
    • pp.129-134
    • /
    • 2006
  • Recently, spillways are need to control stable water level for supporting main dams because of floods by unusual change of weather such as Typhoon Rusa. This study has been focused on the amount of leakage through the rock mass distributed fractures and joints under the opened emergency spillway. It is very important to evaluate the amount of leakage as these affect stability of spillway by interaction between effective stress and pore pressure. The commercial program MAFIC has been used for analyzing groundwater flow in fractured rock mass. The results showed that the values of range, average and deviation of leakage were 2.85∼3.79×10-1, 3.32×10-1 and 1.70×10-2 m3/day/m2 respectively. Secondary, we have estimated the effect of grouting after the transmissivity(Tf) of joint 1 as main pathway of leakage known from above results was changed from 1.78×10-7 to 1.59×10-9 m2/s. The results showed that the values of range, average and deviation of leakage were 7.80×10-4∼1.53×10-3, 1.18×10-3 and 1.32×10-4 m3/day/m2 respectively. As the result, the amount of leakage after grouting has been decreased by a ratio of 1 to 277.

  • PDF

The Economic Efficiency Assessment of Infrastructure considering Environmental Cost - A Case Study of Emergency Spillway for Korean Multipurpose Dam - (환경비용을 고려한 공공시설물의 환경경제성 평가 -국내 다목적댐 비상여수로 시설 사례연구 -)

  • Kwun, Suk-Hyun;Kim, Sang-Bum
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.168-176
    • /
    • 2007
  • This study aims to provide useful information when making a decision for the environmental and economic efficiency assessment of infrastructure, based on Life Cycle Assessment(LCA). It estimates environmental cost on environmental pollutants that are possible to happen by locations and by types of emergency spillway for korean multipurpose dam, which is selected as a study case. For this purpose, this study examines the theories of LCA and Contingent Valuation Method(CVM) and suggests an analysis model of environmental cost. To apply the suggested analysis model of environmental cost for infrastructure to the case study of emergency spillway at the multipurpose dam, this study calculates environmental load on environmental pollutants that generate during life cycle, converts it to a cost to predict environmental cost, evaluates environmental economy of emergency spillway by the estimated result, and draws the optimum alternative that is environmental-friendly and economic.

Hydraulic Model Test for Seongduk Dam Spillway (성덕댐 여수로 수리모형실험 연구)

  • Jang, Suk-Hwan;Choi, Byung-Kyu;Goo, Bon-Woong;Kim, Seong-Taek
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.1313-1317
    • /
    • 2006
  • In this study, various hydraulic phenomena were analyzed from the dam model experiments and the analyzed results were compared with existing computation results. Sungduk dam model structures were constructed using Froude similarity law by 1:50 scale. From the measurements of hydraulic phenomena at spillway channel, an improvement method was trying to be suggested over shortcoming of existing design plan. The result of model experiment showed no big difference with that of each part's numerical interpretation. Sidewall overflows were observed, as water conveyance occurred due to the linear characteristics of spillways, which raised the necessity for improving the linear forms of spillways. Also, it was judged to be necessary improving load pressure and establishing protective structures at the riverbed grounds of downstream channels.

  • PDF

A study on the measurement methods used on a gauge for a spillway gate (여수로 수문개도 측정방식 연구)

  • Kim, Ki-Won;Hwang, In-Kwang;Kim, Ju-Yong;Song, Won-Il;Lee, Jin-Kwon
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.1716-1717
    • /
    • 2008
  • The spillway gate is the most important facility of the multi-purpose dam. we usually use various sensor and conversion technique to control the gate. In this study, we mathematically analyze the instrumental errors on the different winch types. And we will briefly explain the measurement methods used on a gauge for a spillway gate and the calculation method of the discharge water volume.

  • PDF

Behavior of Failure of Agricultural Reservoirs Embankment Reinforced by Geotextile under Overtopping Condition (지오텍스타일로 보강된 농업용 저수지 제체의 붕괴거동)

  • Lee, Dal Won;Noh, Jae Jin
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.56 no.2
    • /
    • pp.59-64
    • /
    • 2014
  • In this study, the large scale test was performed to investigate the behavior of failure for the embankment and spillway transitional zone by overtopping. The pore water pressure, earth pressure, settlement and failure pattern of covering embankment with geotextile were compared and analyzed. The pore water pressure showed a small change in the spillway transition zone and core, indicating that the geotextile efficiently reinforced the embankment. The earth pressure decreased the infiltration of the pore water only in inclined cores type to secure local stability. The behavior of failure started from the bottom and gradually progressed upwards. After the intermediate overtopping period (100 min), width and depth of the seepage erosion were very small due to the effect of geotextile which delayed failure. Therefore, the reinforced method by geotxtile was a very effective method to respond to the emergency due to overtopping.

Theory and Example of Flood Routing (공수조절의 이론 및 계산예)

  • 김동만
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.6 no.1
    • /
    • pp.721-736
    • /
    • 1964
  • Flood routing is one of the most important engineering problems for the design of a spillway, and the procedures for the routing should be thoroughly understood by the engineers engaged in the planning of a spillway. There are many methods for the flood routing such as Muskingum, Steinberg, Puis, Holton, Goodrich, Rutter, Graves, Snyder, etc., which are being used in many countries. This article introduces the theory of the modified PuIs Method in detail which is exclusively being used in the Bureau of Reclamation, Department of Interior, U.S.A. Also, this article includes a routing example worked by the writter for the Ee-dong Reservoir of the Ki-ho Irrigation Association. in Kyong-gi Province.

  • PDF

A Study on Evaluation for Hydraulic and Hydrologic Safety of an Existing Dam with Morning Glory Spillway (나팔형 여수로를 가진 기존댐의 수리·수문학적 안전성평가에 관한 연구)

  • Shin, Eun-Woo;Kim, Kyung-Duk
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.8 no.2
    • /
    • pp.269-278
    • /
    • 2004
  • In this study, hydraulic and hydrologic safety of an existing dam with morning glory spillway was evaluated and the problems were derived in order to control extreme floods efficiently. For design flood(520cms and EL. 170.3m), the spillway was turned out to have no problem for discharge and negative pressure in vertical transition. However, the critical point for discharge starts with EL. 170.7m which transits weir flow condition to orifice flow condition and there may be negative pressure in weir crest. While maximum water level can not be greater than EL. 170.5m including freeboard according to the dam design criteria, the maximum water level based on reservoir routing was turned out to be EL. 172.46m, and fundamental measures should be requested and planned.

Stability Analysis of the Spillway Tunnel Located on the Granite Region Including Fault Fractured Zone (단층파쇄대를 포함한 화강암지역의 여수로 터널 안정성 분석)

  • Han, Kong-Chang;Ryu, Dong-Woo;Kim, Sun-Ki;Bae, Ki-Chung
    • Tunnel and Underground Space
    • /
    • v.18 no.1
    • /
    • pp.58-68
    • /
    • 2008
  • The construction of an emergency spillway of Imha Dam is being in progress on the granite region including fault fractured zone. Considering that this tunnel is being excavated in three paralled rows, the pillar width between each tunnel and the face distance between each tunnel face were evaluated. The Influence of the fault fractured zone for the tunnel stability was investigated by numerical modelling in 3D. Various geophysical investigations and rock engineering field tests were carried out for these purposes. It was suitable that the second tunnel would be excavated in advance, maintaining the face distance between each tunnel face of minimum 25 m. The results of numerical modelling showed that the roof displacement and the convergence of the second tunnel were insignificant, and the maximum bending compressive stress, the maximum shear stress of shotcrete and the maximum axial force of rockbolt were also insignificant. Therefore, it was estimated that the stability of the spillway tunnel was ensured.

Effect of Cut-off Wall near the Entrance of Spillway Tunnel (비상여수로 입구부의 차수벽 설치 효과 분석)

  • Kim, Gyoo-Bum;Son, Young-Chul;Seo, Kyung-Soo
    • The Journal of Engineering Geology
    • /
    • v.20 no.2
    • /
    • pp.147-153
    • /
    • 2010
  • Cut-off wall with a low permeability can be constructed to prevent groundwater seepage in spillway tunnel areas. Three spillway tunnels are constructed in Im-ha multipurpose dam region and three types of cut-off walls with a variety of directions and scales are designed. As a result of MODFLOW modeling to assess the effect of cut-off wall for three types, groundwater inflows to the tunnels range from 64.26 $m^3/day$ to 65.49 $m^3/day$ and also they through a cut-off wall section from a reservoir do from 44.08 $m^3/day$ to 45.31 $m^3/day$ and it does not show any significant difference among them. Therefore, a construction process and an environmental conservation rather than the effectiveness of cut-off wall need to be considered to select the best cut-off wall in this region.

Analysis of Hydraulic Characteristics of Spillway using Hydraulic Model Experiments and Numerical Analysis (수리모형실험 및 수치해석을 통한 여수로 수리특성 분석)

  • Lee, Jong-Kyu;Lee, Jai-Hong;Kim, Joo-Young
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.1818-1822
    • /
    • 2008
  • Generally, not only in order to design three dimensional hydraulic structures such a spillway and to investigate the hydraulic phenomena concerning hydraulic facilities, but also to grasp shape and stability, we simulate actuality phenomenon through hydraulic model experiments. However, it requires too much times, expense and space to perform hydraulic model experiments, as well as it is very difficult to measure reduced scale of actual hydraulic structures. Besides, surface tension can exert fair effect in experiment result, and occasionally an experiment of various case is impossible actually. Therefore, there is necessity to draw proper early result through numerical analysis, and if decide the case of a hydraulic model experiment through the numerical analysis and compare the result, finally economical and reasonable design hydraulic structures are available. This study performs numerical analysis of overflow spillway and an experimental study of hydraulic model tests to design the optimal spillway and suggest a better design to improve hydraulic conditions. From the measurements, revised designs for an hydraulic structure are suggested and consequent improvement effects by the new design are also investigated.

  • PDF