• Title/Summary/Keyword: small-sized contractor

Search Result 8, Processing Time 0.02 seconds

Assessing the Safety Performance of Small-sized Contractors and Improvement Measures (소규모 건설회사의 안전관리 실태 분석 몇 개선방안)

  • Choi, Seung-Mo;Lee, Dong-Eon;Son, Chang-Baek
    • Journal of the Korean Society of Safety
    • /
    • v.23 no.4
    • /
    • pp.53-58
    • /
    • 2008
  • This paper presents the findings obtained from the investigation of fatal disasters occurred by small-sized construction firms which have been accepted as to provide lower safety performance other than large-sized construction enterprises and cause more than half of the safety accidents in average. The study identifies the current status of safety performance provided by the small-sized construction contractors in details, find the issues involved with lack of safety performance, and suggest the improvement measures derived from the findings. A survey questionnaire was administered to the construction contractors, which are listed in the database of Construction Association of Korea as to fall into rank between 501st and 1000th in construction capacity. Safety issues such as the performance of safety management system, safety control structure, safety cost relative to safety control, education devoted to safety improvement, usage of safety garments or individual protective tools, and activities to maintain safety performance on site, etc were investigated from the study.

Case Study of Small and Medium-Sized Construction Firms on the Cost Type Lien Suits (공사비 유형의 유치권 소송에 대한 중·소기업 건설업체 사례분석)

  • Yun, Ha-Jung;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.137-138
    • /
    • 2011
  • Mainly in construction liens to four contractors do not receive your order is caused by construction. This construction does not receive construction compunction to protect the contractor, I guess. On the other hand, the medium and small construction companies and contractors that could threaten the order four can be a problem. In this study, small construction companies to the lien of the lien claim on the issue of case studies have looked for the study. Small construction companies, in your case through the litigation between the lien of the lien litigation perspective, the cause of four orders after the analysis step by step construction was listed in chronological order. Identifying problem was the result of a lien. This study to previous studies regarding the lien on the issue through case studies of one kind of lien was derived for the problem. A follow-up studies and more case studies and interviews are considered necessary in the study.

  • PDF

A Study on the Improvement of Technical Guidance Fee for Preventing Accidents at Small-Medium Construction Sites (중·소규모 건설현장 재해예방 기술지도 대가 개선에 관한 연구)

  • Lim, Se-Jong;Shin, Seung-Hyeon;Won, Jeong-Hun;Yoon, Young-Cheol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.5
    • /
    • pp.469-481
    • /
    • 2021
  • Under Korean law, small-to-medium-sized construction projects with budgets of more than 100 million won and less than 12 billion won must receive technical guidance by a visiting technician belonging to a specialized institution. This study proposed a method for calculating the technical guidance fee to prevent the potential inadequacy of technical guidance when the responsibility providing the technical guidance fee is changed from a contractor to a client. The method simplified the construction works which should receive technical guidance into four sections according to the construction amount. For each section, the number of instances of technical guidance per day provided by the visiting technician and the minimum technical grade of the visiting technician were limited, and the guideline for estimating engineering services fees was applied to calculate the fee per instance of technical guidance. The results show that the proposed method can be applied to the establishment of a technical guidance fee guideline since it well reflects the current fee distribution and K2B analysis results.

A Profit Prediction Model in the International Construction Market - focusing on Small and Medium Sized Construction Companies (CBR을 활용한 해외건설 수익성 예측 모델 개발 - 중소·중견기업을 중심으로 -)

  • Hwang, Geon Wook;Jang, woosik;Park, Chan-Young;Han, Seung-Heon;Kim, Jong Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.50-59
    • /
    • 2015
  • While the international construction industry for Korean companies have grown in market size exponentially in the recent years, the profit rate of small and medium sized construction companies (SMCCs) are incomparably lower than those of large construction companies. Furthermore, small and medium size companies, especially subcontractor, lacks the judgement of project involvement appropriateness, which leads to an unpredictable profit rate. Therefore, this research aims to create a profit rate prediction model for the international construction project focusing on SMCCs. First, the factors that influence the profit rate and the area of profit zone are defined by using a total of 8,637 projects since the year 1965. Seconds, an extensive literature review is conducted to derive 10 influencing factors. Multiple regression analysis and corresponding judgement technique are used to derive the weight of each factor. Third, cased based reasoning (CBR) methodology is applied to develop the model for profit rate analysis in the project participation review stage. Using 120 validation data set, the developed model showed 11% (14 data sets) of error rate for type 1 and type 2 error. In utilizing the result, project decision makers are able to make decision based on authentic results instead of intuitive based decisions. The model additionally give guidance to the Korean subcontractors when advancing into the international construction based on the model result that shows the profit distribution and checks in advance for the quality of the project to secure a sound profit in each project.

A Study on Causes of Franchisee's Conflict in Distribution Channel of small and middle sized Franchise Industry (중소형 프랜차이즈 유통시스템에서 가맹점의 갈등에 관한 질적 연구 - 토대이론 접근법을 활용하여-)

  • Jeon, Ta-sik
    • Journal of Distribution Science
    • /
    • v.4 no.2
    • /
    • pp.21-40
    • /
    • 2006
  • Small and middle sized Franchise system channels experience conflicts because of constant interaction between franchiser and franchisee. However, it is rarely that attempt has been made to identify causes of conflicts in distribution of franchise industry. The purpose of this study was to explore cause of conflicts from the franchisee. For the study, data were collected from the owner or the shop-manager with a contractor in franchise systems. By means of in-depth interviews with multiple informants, their statement was analyzed qualitatively. From analysis of the resulting data, the causes of conflicts were associated with two broad sets, attitudinal and structural differences between franchisers and franchisees. First, attitudinal sources of conflict were identified as perception of subordinated relationships between channel members, delayed announcement on order changes, difficulties in communication by doing irresponsible behavior, different expectations between channel members in market territory and lack of consistent-supporting. Second, structural sources of conflict involved unilateral decision on interior, payment method, unreasonable delivery issue, treat franchisee with discrimination by the sales, in controlling against free management. There are limitations on generalization due to the results based on interview, but this study will be a useful exploratory step before designing a large scale survey.

  • PDF

Deriving Key Risk Sub-Clauses of FIDIC Conditions of Standard Subcontract -Based on FIDIC Conditions of Subcontract for Construction, edition 2011- (FIDIC 표준하도급 계약조건 핵심 리스크 세부조항 도출)

  • Hong, Seong Yeoll;Jei, Jae Yong;Seo, Sung Chul;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.3
    • /
    • pp.439-448
    • /
    • 2022
  • Recently, domestic small and medium-sized subcontractors participating in the overseas construction market are suffering from the continuous loss and damage due to the insufficient recognition of the importance of risk Sub-Clauses among conditions of subcontracts. Therefore, the need to derive risk Sub-Clauses for conditions of the subcontract has been raised, but until now, previous studies have been conducted focusing on deriving risk Sub-Clauses for standard conditions of contract for construction between the Employer and the Contractor. In this study, 52 risk Sub-Clauses were derived on the basis of the influence size of the Sub-Clauses through the Delphi technique targeting 94 Sub-Clauses of conditions of standard subcontract for construction edition 2011, issued by the International Federation of Consulting Engineers (FIDIC) and In addition, 33 key risk Sub-Clauses were finally derived through the PI Risk Matrix by Probability and Impact. The results of this study provide will useful information on key risk Sub-Clauses that need to be reviewed in advance to minimize contractual risks at the stage of bidding and signing contracts for overseas subcontract construction projects.

A Study on the Necessity of Using Demand Guarantee following Unfair Calling Cases (부당지급청구 사례로 본 청구보증 사용의 필요성에 관한 연구)

  • Kim, Pil Joon
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.58
    • /
    • pp.215-236
    • /
    • 2013
  • It is quite true that the more Korean contractors receive overseas contracts, the more they need guarantees. The top market for them is the Middle East countries, consisting of more than the half of the total amount awarded last year and the trend is increasing as well. The problem, however, is that employers in these countries are reluctant to use international rules for guarantee such as URDG or ISP98 and easily make unfair callings. However, Korean contractors(applicants), especially small and medium sized enterprises(SMEs) tend to hurriedly enter a contract without looking into its contents as well as guarantees. They do not realize the importance of the guarantees until they receive callings from the employers(beneficiaries). Being independent from the underlying contracts, guarantee is the equivalent to cash in that it usually does not require any proof of demand when calling and the guarantor should make a payment within usually 5 business days after the request. It is often observed these days that several Korean SMEs go bankrupt due to liquidity risks after receiving unfair callings from employers in the Middle East countries. In retrospect, some cases could be obviated if contractors were a little more careful in checking the contents of a guarantee at the time of concluding a contract. For example, there is one case where the underlying contract includes a reduction clause in the Advance Payment bond and the guarantee does not have that clause. In the end, the Korean contractor had to take the whole burden of the bond amount though it had finished 81% of the project. Nobody could argue that contractors should take a full responsibility if they fail in their obligations. However, the employer's wrongful callings need to be prevented in the first place, if possible. As there shouldn't be a case where one party is at a disadvantage against the other like the case mentioned above, useful insight is being sought to minimize unfair calling risks for the benefit of the applicant. First, the applicant should carefully look into every detail of the potential guarantee before signing a contract, heeding especially that there is a reduction clause in the AP bond. Second, the governing principles for guarantee should be the ones that are internally used such as URDG758 that is objective in terms of callings given that, for example, it specifies that the requirement for a supporting statement when making a demand is a default rule. It is also recommended that the form of guarantees be the standard demand guarantee. Third, parties involved in issuing guarantees are advised to understand international rules for guarantee like URDG758 and ISP98 and to play a key role in guiding SME contractors in Korea so that they can protect themselves from possible wrongful callings, particularly from employers in the Middle East countries. I hope this study would give a wake-up call for Korean SMEs wishing to do business in the Middle East countries and remind them of the importance of guarantee itself and its governing principles.

  • PDF

Effects of Types and Locational Characteristics of Urban Parks on the Apartment Price (도시공원의 유형 및 입지적 특성이 공동주택가격에 미치는 영향)

  • Lee, Go Eun;Choi, Yeol
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.5
    • /
    • pp.927-936
    • /
    • 2016
  • This research aims to analyze the effect of different types of urban parks and their locational characteristics on the apartment price in the entire metropolitan area of Busan, Korea. Although an urban park is an environmental good that influences the surroundings in many ways, most of the previous studies have underestimated its impact on the value of the surrounding area. This research focuses on the economic value of urban parks by understanding their relationship with the value of the apartments in the surrounding area with its significance in their physical and objective characteristics. Furthermore, the research emphasizes the different typological characteristics of urban parks in the analysis. In summary of the result, the number of levels (stories) and units of the apartment complex, ranking of the contractor, age of a park and accessibility to sub-central are positively related to the price of apartment units. On the other hand, the total area of apartment complex, the age of apartments, the distance to the nearest park and accessibility to civic-central or regional district are negatively related to the price of apartment units. Having a plan for constructing a park is also positively related to the price. For the typological characters of a park, neighborhood park, small-sized park, and sports park are positively related to the price, while children's park is negatively related to the price of apartment units. Considering that the price increases as the distance to the nearest park decreases, people prefer to live near the benefits that urban parks provide. In order to maximize the value and benefits that parks provide, it is necessary to approach them creatively.