• Title/Summary/Keyword: small hydro power

Search Result 175, Processing Time 0.022 seconds

A Study on the Microcomputer-based PID Governor for Small Hydro Power Plant (마이크로 컴퓨터를 이용한 소수력발전소 PID 조속기에 관한 연구)

  • 신동렬;이규현;이원용
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.36 no.7
    • /
    • pp.492-500
    • /
    • 1987
  • Microcomputer-based PID governor which can be provided either stability or rapid response for small hydro power plant at low cost is developed and adapted to the 5 KW model hydro power for the performance test. The effects of PID gains on stability boundaries of the hydraulic turbine generating system is investigated. For the optimum selection of the PID gains, general equations are derived on the base of the experiments. This control system has a good performance at the model of hydro power plant. For the prediction of the control system, a mathematical model was developed and the results of the simulation using this model was matched with the experimental results.

  • PDF

Performance Evaluation of the Samcheonpo Small-Hydro Power Plant (삼천포 해양소수력 성능평가)

  • Cho, Hong-Yeon;Cho, Beom-Jun;Kang, Geum-Seok
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.617-620
    • /
    • 2007
  • The performance evaluation of the Samcheonpo small-hydropower plant constructed on the October 25th,2006, was carried out focused on the turbine and generator efficiency analysis by using the measurement data. The unreasonable and unrealistic efficiency results are occurred in some periods because of the data variability, uncertainty, and measurement errors and mistakes. Whereas, the big mismatch is the tidal elevation predicted in the design processes. The difference between the measured and estimated tidal elevation is obvious during the low water period. It should be considered and checked in depth on the efficiency analysis of the planned and constructing small-hydro power plants in other coastal areas.

  • PDF

Design Parameters of Small Hydro Power Sites for River Systems(I) (소수력발전입지의 수계별 설계변수 특성(I))

  • Park, Wan-Soon;Lee, Chul-Hyung
    • Journal of the Korean Solar Energy Society
    • /
    • v.30 no.4
    • /
    • pp.86-91
    • /
    • 2010
  • The characteristics of hydrologic design parameters for small hydro power(SHP) sites located in four major river systems have been studied. The model, which can predict flow duration characteristic of stream, was developed to analyze the variation of inflow. And another model to predict hydrologic performance for SHP plants is established. The results from hydrologic performance analysis for SHP sites located on five major river systems based on the models developed in this study show that the specific design flowrate and specific output of SHP site have large difference between the river systems. The load factor, however, have small difference compared with specific design flowrate and specific output for all river systems. Also, it was found that the models developed in this study can be used to predict the primary design specifications of SSHP plants effectively.

Hydrologic Performance Change of Small Scale Hydro Power Plant with Rainfall Condition Change (강우형태변화에 의한 소수력발전소 수문학적 성능의 변화)

  • Park, Wan-Soon;Lee, Chul-Hyung
    • Journal of the Korean Solar Energy Society
    • /
    • v.29 no.6
    • /
    • pp.56-61
    • /
    • 2009
  • The effects of design parameters for small scale hydro power(SSHP) plants due to climate change have been studied. The model to predict hydrologic performance for SSHP plants is used in this study. The results from analysis far rainfall conditions based on KIER model show that the capacity and load factor of SSHP site had large difference between the period. Especially, the hydrologic performance of SSHP site due to rainfall condition of recent period varied in design flowrate sensitively. However climate change gave small effect in load factor of existing SSHP plant. And also, the methodology represented in this study can be used to decide the primary design specifications of SSHP sites.

Characteristic Analysis of Kaplan Water Turbine Generator Applied to Agricultural Reservoirs (농업용 보에 적용된 카프란 수차 발전기의 동작 분석)

  • Kim, Jong-Gyeum;Ryoo, Yeon-Su
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.5
    • /
    • pp.689-693
    • /
    • 2015
  • Recently, many advanced countries are devoted to the development of eco-friendly new-renewable energy to prepare for the depletion of resources. Korea belongs to the absolute lack of energy to import from abroad 97% of energy use. So, development and supply of eco-friendly energy such as small hydro power has been required even more. Our country has a large number of small-sized reservoirs and dams. So, hydro generator has been installed at the small reservoirs and dams with the economy. Since the discharge flow of agricultural reservoir is not constant, the guide vane of wicket gate is used for adjusting the output of the generator.

Finite Element Analysis for the Contact Behavior in Double-Type Mechanical Face Seals Used for Small Hydro Power Turbine (소수력 터빈용 복수 기계평면시일의 접촉거동에 관한 유한요소해석)

  • Kim, Chung-Kyun;Kang, Hyun-Joon
    • Tribology and Lubricants
    • /
    • v.21 no.5
    • /
    • pp.201-208
    • /
    • 2005
  • This paper presents the FEM analysis on the contact behavior characteristics of mechanical face seals in a small hydro-power turbine. Especially, the axial displacement and contact normal stress between a seal ring and a seal seat of a primary sealing unit have been analyzed as functions of rotating speed of a hydro-turbine, sealing gap, water and cooling fluid temperature. Those are strongly related to a leakage of water and wear between a seal ring and a seal seat. The FEM computed results present that the rotating speed of a hydro-turbine may be kept less than 800 rpm, and the sealing gap in a primary sealing unit is restricted $0.5\~5$. The coolant temperature in which is most influential parameter to the contact behaviors of a sealing unit may be kept less than $15^{\circ}C$ for a safe operation of a sealing unit without a leakage and wear.

Performance and Internal Flow of Cross-Flow Hydro Turbine by Effective Head (횡류수차의 유효낙차 변화에 따른 성능 및 내부유동)

  • Kim, Doo-Hwan;Choi, Young-Do;Lim, Jae-Ik;Lee, Young-Ho
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.191.1-191.1
    • /
    • 2010
  • Global concerns about environmental issues such as a greenhouse effect are increasing gradually. Quantity of emission of carbon dioxide by Hydro-Power Plants is smaller than those by power plants of other renewable energy sources. Manufacturing costs of hydro turbine is relatively very expensive because the structure of hydro turbine is very complex. Therefore, cross-flow turbine is adopted in this study because of its simple structure and high possibility of applying to small hydropower. The result shows that as effective head increases, tangential and radial flow velocities increase and thus, the increased tangential velocity contributes to the increase of angular momentum and output torque.

  • PDF

Analysis of Performance Characteristic for Small Scale Hydro Power Plant with Long Term Inflow Condition Change (장기유입량 변화에 의한 소수력발전소 성능특성분석)

  • Park, Wan-Soon;Lee, Chul-Hyung
    • New & Renewable Energy
    • /
    • v.5 no.4
    • /
    • pp.39-43
    • /
    • 2009
  • The variation of inflow at stream and hydrologic performance for small scale hydro power(SSHP) plants due to climate change have been studied. The model, which can predict flow duration characteristic of stream, was developed to analyze the variation of inflow caused from rainfall condition. And another model to predict hydrologic performance for SSHP plants is established. Monthly inflow data measured at Andong dam for 32 years were analyzed. The existing SSHP plant located in upstream of Andong dam was selected and analyzed hydrologic performance characteristics. The predicted results from the developed models show that the data were in good agreement with measured results of long term inflow at Andong dam and the existing SSHP plant. Inflow and ideal hydro power potential had increased greatly in recent years, however, these did not lead annual energy production increment of existing SSHP plant. As a results, it was found that the models represented in this study can be used to predict the primary design specifications and inflow of SSHP plants effectively.

  • PDF

Hydrologic Performance Characteristics of Small Scale Hydro Power Site (소수력발전입지의 수문학적 성능특성)

  • Park, Wan-Soon;Lee, Chul-Hyung
    • Journal of the Korean Solar Energy Society
    • /
    • v.27 no.3
    • /
    • pp.135-142
    • /
    • 2007
  • The model to predict flow duration characteristics and performance for small scale hydro power(SSHP) plants is studied to analyze the effects of rainfall condition. One existing SSHP plant was selected and performance characteristics was analyzed by using the developed model. The predicted results from the model developed show that the data were in good agreement with operational results of existing SSHP plant. The results show that both the scale parameter and the shape parameter have large effects on the performance of SSHP sites. And also it was found that the model developed in this study can be a useful tool to predict the performance of SSHP sites.

A Study on the Performance Prediction for Small Hydro Power Plants (소수력발전소의 성능예측)

  • Park, Wan-Soon;Lee, Chul-Hyung
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.448-451
    • /
    • 2005
  • This paper presents the methodology to analyze flow duration characteristics and performance prediction for small hydro power(SHP) plants and its application. The flow duration curvecan be decided by using monthly rainfall data at the most of the SHP sites with no useful hydrological data. It was proved that the monthly rainfall data can be characterized by using the cumulative density function of Weibull distribution and Thiessen method were adopted to decide flow duration curve at SHP plants. And, the performance prediction has been studied and development. One SHP plant was selected and performance characteristics was analyzed by using the developed technique. Primary design specfications such as design flowrate, plant capacity, operational rate and annual electricity production for the SHP plant were estimated. It was found that the methodology developed in this study can be a useful tool to predict the performance of SHP plants and candidate sites in Korea.

  • PDF