• Title/Summary/Keyword: site management

Search Result 4,642, Processing Time 0.04 seconds

A Practical Study on the Safety Management Technique - with a particular consideration of construction work - (안전관리 기법에 관한 실증적 연구 - 건설작업을 중심으로 -)

  • 채준석;갈원모;손기상
    • Journal of the Korea Safety Management & Science
    • /
    • v.2 no.1
    • /
    • pp.1-17
    • /
    • 2000
  • Many Safety training up to now has been done at site varying with their condition without any standardization or fundamental work related technique. In order to prevent any accidents from construction site, now as we all know, we have to approach on it with work based method. The authors have investigated a couple of construction site for collecting the ideas from site Engineers of this. Some of ideas analyzed with the above related data have been shown as conclusions.

  • PDF

Estimation of Site Index for Larix kaempferi and Pinus koraiensis in Gangwon and North Gyeongsang Provinces

  • Lee, Daesung;Seo, Yeongwan;Park, Gildong;Choi, Jungkee
    • Journal of Forest and Environmental Science
    • /
    • v.31 no.3
    • /
    • pp.202-206
    • /
    • 2015
  • Site index curves were developed for Larix kaempferi and Pinus koraiensis in Gangwon and North Gyeongsang provinces in Korea. For the development of site index, Schumacher and Chapman-Richards model were applied using the data collected from 2012 to 2014. Base age was set to 40 years for Larix kaempferi and Pinus koraiensis in site index of this study. Coefficient of determination and root mean square error of site index models were provided by species, and the models were compared with the previous studies to check the suitability. Overall, site index models developed in this study fitted in the current data well. Thus, the site indexes are considered to be properly used in Gangwon and North Gyeongsang provinces.

Viaduct seismic response under spatial variable ground motion considering site conditions

  • Derbal, Rachid;Benmansour, Nassima;Djafour, Mustapha;Matallah, Mohammed;Ivorra, Salvador
    • Earthquakes and Structures
    • /
    • v.17 no.6
    • /
    • pp.557-566
    • /
    • 2019
  • The evaluation of the seismic hazard for a given site is to estimate the seismic ground motion at the surface. This is the result of the combination of the action of the seismic source, which generates seismic waves, the propagation of these waves between the source and the site, and site local conditions. The aim of this work is to evaluate the sensitivity of dynamic response of extended structures to spatial variable ground motions (SVGM). All factors of spatial variability of ground motion are considered, especially local site effect. In this paper, a method is presented to simulate spatially varying earthquake ground motions. The scheme for generating spatially varying ground motions is established for spatial locations on the ground surface with varying site conditions. In this proposed method, two steps are necessary. Firstly, the base rock motions are assumed to have the same intensity and are modelled with a filtered Tajimi-Kanai power spectral density function. An empirical coherency loss model is used to define spatial variable seismic ground motions at the base rock. In the second step, power spectral density function of ground motion on surface is derived by considering site amplification effect based on the one dimensional seismic wave propagation theory. Several dynamics analysis of a curved viaduct to various cases of spatially varying seismic ground motions are performed. For comparison, responses to uniform ground motion, to spatial ground motions without considering local site effect, to spatial ground motions with considering coherency loss, phase delay and local site effects are also calculated. The results showed that the generated seismic signals are strongly conditioned by the local site effect. In the same sense, the dynamic response of the viaduct is very sensitive of the variation of local geological conditions of the site. The effect of neglecting local site effect in dynamic analysis gives rise to a significant underestimation of the seismic demand of the structure.

A Study on Factors Influencing the Web Site Development (웹사이트 개발 수준에 영향을 미치는 요인에 관한 연구)

  • Moon Yong-Eun;Jung Eau-Jin
    • The Journal of Information Systems
    • /
    • v.12 no.2
    • /
    • pp.73-90
    • /
    • 2003
  • IT and e-business is a hot issue of the world business and economic communities. The web site is the portal through which most of electronic transactions are conducted today. The main purpose of this paper is to investigate on factors influencing the web site development at the firms in Korea. Survey questionnaires were distributed via email & post to 281 firms that have implemented web site. Out of 44 responded questionnaires, 39 data sets were available for statistical analysis with SPPSSWin 10.1. Factor analysis identified five dimensions of web site development : (1) support of top management, (2) information technologies maturity, (3) strategic utilization of web site, (4) strength of rivalry among competing firm, (5) support policy of the government. Results of this study show that information technologies maturity and strategic utilization of web site positively influence on web site development. But support of top management, strength of rivalry among competing firm and support policy of the government don't influence on web site development. This study may provide a guideline to improve the quality of web site development.

  • PDF

A Study on the Management and Improvement of Purchased Land in the Youngsan·Seomjin-River Riparian Area - Focusing on the Suncheon City Region - (영산강·섬진강 수계 수변구역 매수토지의 관리 현황 및 개선 방안 - 순천시 지역을 중심으로 -)

  • Byon, Seong-Soo;Lee, Sang-Houck
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.15 no.6
    • /
    • pp.69-77
    • /
    • 2012
  • This study observes the purchased lands in riparian areas of Suncheon City region and proposes a reasonable management method. For the study, the site surveying and analysis on the neglected purchased lands is executed, then, based on the site analysis result, the appropriate management method for each neglected purchased land is established. Each management method is approached from the ecological restoration perspective. According to site surveying and analysis of the neglected purchased lands, most of the sites were bare and agricultural lands. The reason for this is thought to be as when purchasing a land, the areas with higher nonpoint source pollution are bought preferentially. As for the dominant species coverage, 26% ($364,000m^2$) of the total neglected purchased land area in Sucheon City was covered with the dominated species, and for the exotic species coverage, 17% ($232,000m^2$) of the total neglected purchased land area in Sucheon City was covered with the exotic species. The survey site constituted of five different invasive species such as Japanese Hop (Humulus japonicus), Daisy Fleabane (Erigeron annuus), and Evening Primrose (Oenothera odorata). As for the natural succession on site, about 47% of the area showed poor natural succession process. The reason for this outcome is understood as having a lack of appropriate management for purchased lands. Based on the site surveying and analysis, especially the current management state of the and its location, the research site was categorized into preservation, restoration, and improvement sites. During the establishment of the ecological riparian belt, the comprehensive management for preservation, restoration, and improvement of the purchased lands should be executed.

A Economic Order Quantity(EOQ) Determination Method considering Stock Yard Size (야적장 크기를 고려한 철근의 경제적 주문량(EOQ) 산정)

  • Lee, Jae-Myung;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.549-552
    • /
    • 2007
  • Inventory management is an important factor for cost saving in a construction project. stock yard of general public residence site is secured. but site of the downtown area is not. inventory management of site was performed an intuition and an experience. According to inventory management of site is necessary systematic and efficient. This study examine general idea stock and inventory management. and suggests a EOQ determination method considering stock yard size. and particularity of site.

  • PDF

A study on the safety supervision team's efficient using at construction site (건설현장에서의 안전감시단의 효율적 활용에 관한 연구)

  • Gang, Yong-Tak;Kim, Chang-Eun
    • Journal of the Korea Construction Safety Engineering Association
    • /
    • s.37
    • /
    • pp.74-83
    • /
    • 2006
  • As there are more accidents which are more serious in construction site than other industries, it needs the safety management system to be SLIM on the same time, there are still lots of difficulties to prevent those accidents exactly, so it also needs a safety supervision team to prevent the accident, unsafe operation and condition before happening, which is also called as a Man-to Man safety management method. The range of the job site in one personnel's management is very big and large, so it needs the personnel to deep watch the safety operation and prevent any unsafe/fire accidents; the personnel also should find out the unsafe points in the job site, and carefully supervise the dead angle site, then support the totally safety management POINT and realize the ZERO accident.

  • PDF

Research on Digital Construction Site Management Using Drone and Vision Processing Technology (드론 및 비전 프로세싱 기술을 활용한 디지털 건설현장 관리에 대한 연구)

  • Seo, Min Jo;Park, Kyung Kyu;Lee, Seung Been;Kim, Si Uk;Choi, Won Jun;Kim, Chee Kyeung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.239-240
    • /
    • 2023
  • Construction site management involves overseeing tasks from the construction phase to the maintenance stage, and digitalization of construction sites is necessary for digital construction site management. In this study, we aim to conduct research on object recognition at construction sites using drones. Images of construction sites captured by drones are reconstructed into BIM (Building Information Modeling) models, and objects are recognized after partially rendering the models using artificial intelligence. For the photorealistic rendering of the BIM models, both traditional filtering techniques and the generative adversarial network (GAN) model were used, while the YOLO (You Only Look Once) model was employed for object recognition. This study is expected to provide insights into the research direction of digital construction site management and help assess the potential and future value of introducing artificial intelligence in the construction industry.

  • PDF

Development of Integrated Cost and Schedule Management System using Work Package Concept for Efficient Project Management (Work package 개념을 활용한 현장의 공정관리와 공사비 통합관리 효율화 방안)

  • Kim, Yongpyo;Lee, Yongjun;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.5
    • /
    • pp.32-40
    • /
    • 2017
  • Korean construction industry is facing downtime mood and need more productivity. In order to successfully accomplish the construction project with more productivity, systematic and reasonable schedule management techniques should be developed and utilized. Therefore, in this study, first, a current status of the schedule management in the construction site is identified and the improvements in the schedule management are suggested. And, the effective schedule management technique in the construction site is proposed based on the in-site experience of the researcher. In order to find solutions, survey questionnaires designed to measure the understanding of process management and measure perception of the importance of schedule management. Total twenty nine field engineers who are performing schedule management of construction project at domestic civil engineering construction site were participated in the survey, and In-depth interviews were conducted. Eleven construction sites are inspected. Finally, a simple and effective schedule management technique including from WSB classification to schedule analysis, performance management, and performance improvement is proposed based on the inspection of current status of schedule management in civil engineering construction site.

Investigation on the Manpower Staffing Plan Utiling Density Analysis Method (밀도분석에 의한 공동주택 현장관리 인력 배치계획 분석)

  • Kwon, Gi-Deoc;Kim, Sun-Kuk;Sohn, Hyo-Won;Choi, Jae-Hwi;Lee, Dong-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.119-123
    • /
    • 2010
  • Recent economic slump has highlighted the needs for the construction industry to develop strategies to improve productivity and overhaul organization structure. Notably, it is urgent to improve productivity of apartment building construction projects that account for about half of the aggregate revenue of building construction projects in Korea. As construction site management manpower staffing plan has close relation with the productivity of building construction, it is essential to staff construction sites adequately in consideration of site conditions and characteristics. However, construction companies of Korea are still far from developing site management manpower staffing plan in reference to quantitative standards. Therefore, this research aims to analyze site management manpower staffing plan of apartment building construction project by means of density analysis. To be more specific, site organization charts and staffing plans of apartment building construction projects put together by large construction companies in Korea are studied and essential resources and their mobilization time of apartment building construction projects are examined. Conclusions herein will provide basic inputs to subsequent studies of apartment building construction site management manpower staffing standards.

  • PDF