• Title/Summary/Keyword: shotcrete

Search Result 399, Processing Time 0.036 seconds

An experimental study on the improvement of tunnel drainage system using a geogrid composite (지오그리드 복합 배수재를 이용한 터널 배수성능 개선에 관한 실험적 연구)

  • Lee, Jun S.;Choi, Il-yoon;Lim, Jihoon;Yoon, Suk Chul
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.1
    • /
    • pp.31-40
    • /
    • 2016
  • A new testing equipment is designed to investigate the characteristics of the drainage fabric which is used in the tunnel drain system. The equipment is possible to model the loading as well as boundary conditions of the shotcrete precisely and it follows the general guideline of ASTM D4716 so that the interface between shotcrete and concrete lining retains the real situation in the tunnel site. Using the real loading conditions and surface irregularities, the flow rate and its capacity of the regular fabric has been estimated. A composite drainage fabric having geogrid inside was also used to investigate the flow rate and its efficiency. The advantages of the composite fabric compared with the regular one have been demonstrated using the experimental data and brief outline of the future work is finally proposed.

Evaluation of Support Requirements for the Single Shell Tunnels from the Case Study of Rock Mass Classifications (국내 암반분류 사례를 통한 싱글쉘 터널 지보량 산정 연구)

  • Kim Hak-Joon;Lee Seong-Ho;Shin Hyu-Seong;Bae Gyu-Jin
    • The Journal of Engineering Geology
    • /
    • v.16 no.3 s.49
    • /
    • pp.283-291
    • /
    • 2006
  • Shotcrete is used as a permanent lining in single shell tunnels even though shotcrete has been used as a temporary lining in NATM tunnels. Therefore, the accurate evaluation of strength parameters is very crucial because the reliable estimation of loads acting on the shotcretes is necessary to maintain the stability of tunnels. The evaluation of strength parameters of the ground far the single shell tunnels should be investigated to adapt the method in Korea because the geological condition of Korea is different from that of other country. Rock classification and strength parameters obtained from 25 tunnel sites were investigated for this study. Support types fur the different rock classes are suggested for the single shell tunnels in Korea based on the NMT because Q-system has been widely used in Korea. The support types in terms of both Q and RMR values are given based on the correlation of Q and RMR values obtained from the case studies.

Construction Method and Durability Evaluation of Mock-up Test for Bobsleigh Track (실물크기형 봅슬레이 트랙 Mock-up Test 시공방법 및 내구성 평가)

  • Lee, Kyeo-Re;Han, Seung-Yeon;Nam-Gung, Kyeong;Yun, Kyong-Ku
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.1
    • /
    • pp.315-323
    • /
    • 2016
  • This study examined the durability and method for making a mockup of bobsled tracks for constructing a bobsled stadium, which is a sport in the Winter Olympics. As bobsleigh games are very fast and dangerous, a safety design for players and a precise construction using highly efficient shotcrete is necessary. Moreover, a general molding construction is difficult because bobsleigh tracks are composed of various curves and slopes, and it is necessary to construct them using high-strength and high durability materials. The developed method for making a mockup and performing durability evaluation of bobsleigh tracks through this research will be applied in the construction of the 2018 Pyeongchang Winter Olympics Sliding centre and bobsleigh tracks using domestic techniques.

A Study on Reinforcement Method of Reinforced Soil Retaining Wall Through Field Experiment (보강토옹벽의 배부름현상 분석 및 보강 방법에 대한 실험적 연구)

  • Lee, Won-Hong;Mun, Byeong-Jo;Lee, Seuong-Yeol
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.4
    • /
    • pp.103-112
    • /
    • 2019
  • This study proposes a system to control the bulging phenomenon occurring in the reinforced earth retaining wall and to evaluate the reliability of the system by field experiment. In this study, drainage facilities were not installed in order to induce reinforcement earth retaining wall bulging, and the bulging was induced by rainfall. The induced bulging displacement exceeded the horizontal displacement criterion during the construction of FHWA. The retaining wall block was drilled and grouting was performed by inserting the nail into the drilling hole. The wire mesh is installed on the reinforcing surface and the head of the nail is connected horizontally so that the blocks of the reinforcing earth retaining wall can be supported with each other. In order to protect the reinforcements, the reinforcement surface was closed with shotcrete and a measuring device was installed to detect the progress of the displacement. After the reinforcement, the bulging were not found to progress any more, confirming the reliability of the system.

A Fundamental Study for Proper Maximum Size of Coarse Aggregate of Ready-mixed Shotcrete (레디믹스트 숏크리트의 적정 골재최대치수 제안을 위한 기초적 연구)

  • Ma, Sang-Joon;Choi, Hee-Sup;Kim, Dong-Min
    • Journal of the Korean Geotechnical Society
    • /
    • v.24 no.4
    • /
    • pp.47-55
    • /
    • 2008
  • This study was carried out to investigate and analyse the influence of maximum size of coarse aggregate and quality control of aggregate on the properties of shotcrete through the laboratory and field test. From the results of the test, as the maximum size of coarse aggregate decreased from 13 mm to 8 mm, plasticity property declined and compressive strength and dynamic modulus of elasticity of hardened concrete increased remarkably, so it was found that the aggregate size 8 mm was superior to 13, 10 mm in fluidity, constructability and durability. Therefore, it was advisable for well maximum size of coarse aggregate to apply to the 8mm aggregates through the Ready-mixed Method for quality control and minimum segregation.

Numerical investigation on 3D behavior of 2-Arch tunnel (2-Arch 터널의 3차원 거동 특성 - 수치해석 연구)

  • Yoo, Chung-Sik;Kim, Joo-Mi;Kim, Hee-Chul
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.3
    • /
    • pp.255-264
    • /
    • 2009
  • This paper concerns the behavior of 2-Arch tunnel constructed under various conditions. A 2-Arch tunnel section adopted in a subway tunnel construction site is considered in this study. A calibrated 3D finite element model was adopted to conduct parametric studies on a variety of construction scenarios including lagged distance between left and right tunnels, overburden, and geological condition. The results of analyses were examined in terms of crown settlement, shotcrete lining stress, and load on center column in relation to the lagged distance, cover depth, and the ground condition. The results indicate that the shotcrete lining stress and the center pillar load are more influenced by the second tunnel excavation than the tunnel deformation. Also shown is that a greater lagged distance is required to minimize the interaction between two tunnels when the ground condition becomes weaker. Fundamental mechanisms of 2-arch tunnel were also discussed based on the results.

The Ground Reinforcement on Daylight Collapsed Block of Crown Head in the Face of the Tunnel of Highway (고속도로 터널막장 천단부의 붕락구간에 대한 지반보강)

  • 천병식;정덕교;한기식;정진교
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.03a
    • /
    • pp.323-330
    • /
    • 1999
  • Daylight collapse have been occurred by about 5.0m deep at ground surface and collapse of the crown head part of the tunnel have connected to the ground surface during first step of shotcrete work after blasting of upper half section of the tunnel driving at two-way double track tunnel face section on highway construction. This study is for a successful illustration case for the earth improvement method through applying such strengthening methods as cement milk grouting, S.G.R grouting,, steel pipe reinforced multi-step grouting etc. for the purpose of earth strengthening of loosened earth block occurred by tunnel collapse.

  • PDF

Field Evaluation of the Swelled Steel Tube Rockbolts (튜브형 강관 록볼트의 현장 적용성 평가)

  • Son, Sung-Gon;You, Jin-O;You, Joung-Hoon;Chung, Jae-Min
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1149-1156
    • /
    • 2011
  • A rockbolt is one of the most important reinforcement of on-site soil, as with the shotcrete and steel rib. The rockbolt by setting within the tunnel can prevent the deformation of the ground profile; furthermore it improves the structural behavior of soil and rock. In general, the rockbolt is mainly used with reinforced steel. However, steel pipe or the materials with the same strength can be used depending on the soil conditions, ground water outflow condition, and the surrounding of applying location. In Korea, most tunnel construction sites have used cement mortar or resin for steel reinforcement on the rock. Due to the ground water outflow in the construction site, the usability of steel reinforcement is poor and it requires curing time especially after installation. To improve exist above problems, this study introduces the development of a swelled steel pipe rockbolt, as well as presents the field testing and performance results.

  • PDF

Correlations in the Flexural Performance of SFRC Beams and Panels (강섬유보강 숏크리트의 휨 성능평가를 위한 보시편과 패널시편의 상관성 연구)

  • 류종현;한승환;김진철;안태송;이상돈
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.10a
    • /
    • pp.727-732
    • /
    • 2002
  • Steel Fiber Reinforced Shotcrete(SFRS) has been prevalently used in lining to stabilize tunnel structures as temporary or permanent support. In recent, it is one of the major elements of tunnel construction, and so the quality control of SFRC should be clarified to guarantee the safety. The experimental study has been performed to verify the possible correlations in several chracteristics related to quality of SFRC and examine the applicability of round panel test for in field. The test variables were the type and dosage of accelerator, aspect ratio of fiber, and fiber content. The test results such as compressive strength, flexural strength, flexural toughness, and energy absorption capacity, were exmained and analyzed scrutinizingly.

  • PDF

TAFEM을 이용한 터널 예제 해석

  • Jo, Seon-Gyu;Jeong, Jae-Dong;Eom, Jong-Uk
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1991.10a
    • /
    • pp.216-232
    • /
    • 1991
  • This Finite Element Program(TAFEM) has been developed to be able to carry out the structural analsis of tunnel section and simulate the surrounding ground behaviour due to New Austrian Tunnelling Method, of which main support is the surrounding ground, itself. The Elasto-plastic theory has been applied. The used finite elements are 8-noded isoparametric element(rock & shotcrete), 2 or 3-noded rod element(rock bolt) and infinite boundary element. The load incremental method and tangential stiffness method has been used. Associated flow rule was applied to plastic flow and yield criteria inclued not only Mohr-Coulomb but also Drucker-Prager. In this paper, Drucker-Prager yield criterion has been used. The relationship between plastic strain and stress is based on the incremental strain concept and stress-strain equation on the basis of the stress path of each gauss point has been adopted. It may be rational that rock is considered to be no-tension material, so that no-tension analysis has been adopted in accordance with the brittle fracture constitutive equation.

  • PDF