• 제목/요약/키워드: shield analysis

검색결과 451건 처리시간 0.025초

Structural Analysis of Thruster Heat Shield for Satellite Propulsion System (인공위성 추진시스템용 추력기 열차폐막의 구조해석)

  • Lee, Kyun-Ho;Kim, Jeong-Soo;Han, Cho-Young
    • Proceedings of the KSME Conference
    • /
    • 대한기계학회 2003년도 춘계학술대회
    • /
    • pp.468-472
    • /
    • 2003
  • MRE-1 dual thruster module(DTM) which will be installed to the present under development KOMPSAT(Korea Multi-Purpose Satellite) can provide reliable and cost-effective means of propulsive control for attitude and maneuvering control system. Thruster heat shield, one of the main components of DTM, is designed to intercept the radiative heat exchange between thruster and satellite during firing. The inside diameter of the current configuration will be decreased a little compared with that of the previous one due to manufacturing method change. Therefore, the possibility of interference between thruster and heat shield due to configuration change is investigated through structural analysis and their results are described in this paper.

  • PDF

A Case Study of Delay Analysis for E.P.B Shield TBM Method in Construction Site (E.P.B(Earth Pressure Balance) Shield TBM 공사의 공기지연 사례연구)

  • Kwak, Jun-Hwan;Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • 제29권6D호
    • /
    • pp.737-743
    • /
    • 2009
  • Shield TBM, since it was employed for Suyoungman Bay riverbed tunnel of Busan Subway in 2000,has been increasingly adopted in Korea, and in line with growing popularity, the study on Shield TBM has been expanded. However the studies mostly focus on ground condition in a bid to estimate the advancement rate and develop the model for calculating the excavation efficiency, whereas the efforts to analyze the cause of delay and to develop the improvement measures have been neglected. Thus the studies were mostly intended to analyze the schedule slippage focusing on ground conditions, while the study on schedule behind due to equipment itself and related facilities have yet to be attempted in earnest. This study hence was aimed at evaluating the troubles and schedule slippage caused by mechanical elements such as shield TBM equipment and tools and ground conditions, making use of FMEA approach so as to analyze the risk of schedule delay by such elements, thereby proposing the preventive measures to deal with high-risk factors. So, this study suggest the solution to highly ranked trouble factor for the purpose of enhance the efficiency on Shield TBM.

Study on seismic behavior and seismic design methods in transverse direction of shield tunnels

  • He, Chuan;Koizumi, Atsushi
    • Structural Engineering and Mechanics
    • /
    • 제11권6호
    • /
    • pp.651-662
    • /
    • 2001
  • In order to investigate the seismic behavior and seismic design methods in the transverse direction of a shield tunnel, a series of model shaking table tests and a two-dimensional finite element dynamic analysis on the tests are carried out. Two kinds of static analytical methods based on ground-tunnel composite finite element model and beam-spring element model are proposed, and the validity of the static analyses is verified by model shaking table tests. The investigation concerns the dynamic response behavior of a tunnel and the ground, the interaction between the tunnel and ground, and an evaluation of different seismic design methods. Results of the investigation indicate that the shield tunnel follows the surrounding ground in displacement and dynamic characteristics in the transverse direction; also, the static analytical methods proposed by the authors can be used directly as the seismic design methods in the transverse direction of a shield tunnel.

Magnetic Shielding Characteristics of the Slitted Electrothermal Shield (틈새를 낸 열전자 차폐막의 자기차폐특성)

  • 이홍배;배동진;김석환;원영진;한성진;차귀수;한송엽
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • 제40권6호
    • /
    • pp.562-566
    • /
    • 1991
  • Many research and development activities have found that Superconducting Generators (SCG) have advantages such as high efficiency, light weight, small size, large unit size and good steady-state stability over conventional ones. However the transient stability of SCG is comparable to that of conventional ones. One way to improve the transient stability of SCG is to apply quick-response excitation system to the SCG. For this purpose, an SCG with an electrothermal shield of short electric time constants should be developed. In this paper, a new electrothermal shield, called slitted electrothermal shield(SES), is proposed. The SES can easily transmit radiated heat into the ends of the shield as in the conventional electrothermal shields(CES) and can easily pass magnetic flux produced by armature and field windings. By finite element analysis and experimental test, the slitting effects of SES on magnetic shielding are compared. Good agreement is obtained between simulated and test results.

  • PDF

An Analysis of Insulation Performance Result from Shield of Outside Vacuum interrupter (진공인터럽터 외부쉴드가 절연성능에 미치는 영향 분석)

  • Yoon, Jae-Hun;Lim, Gee-Jo
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 한국전기전자재료학회 2010년도 하계학술대회 논문집
    • /
    • pp.100-100
    • /
    • 2010
  • Because of power consumption increase, global wanning, and limitation of installation, not only high reliability and interruption capability but also compact and light power apparatuses are needed. To improve the insulation performance, the high E field concentration phenomena was considered. Breakdown mechanism in vacuum is different from that in other insulation materials. therefore, It is necessary to understand the electric field distribution and insulation characteristics. This paper discusses the simulation and LI(light impulse) test of the shield of outside vacuum interrupter As a result, FEM simulation and LI test show that improve distribution of electrical field and equi-potential line. due to external shield. in this case, outside shield induced electric field of triple junction point.

  • PDF

Characteristics of Shield Materials for Wireless Power Transfer

  • Chu, In Chang;Jeong, Jinseong
    • Journal of Magnetics
    • /
    • 제19권3호
    • /
    • pp.291-294
    • /
    • 2014
  • In this paper, we examine the electrical and magnetic properties of three different types of shield materials used for wireless power transfer systems: namely, FeSiAl-composite, NiZn-ferrite, and FeSi-amorphous types. The power transfer efficiency and resistance of an RX coil are measured, while varying the shield thickness. For all three types, a thicker shield provides better power transfer efficiency. Analysis of the measurements shows that the FeSiAl-composite type is suitable for systems with size limitation. In terms of magnetic properties, the FeSi-amorphous type shows the best features, and is suited to high power applications. This work can be used as a guideline to select suitable shielding material in various wireless power transfer systems.

State of the Art of Segment Lining in Shield Tunnel and Statistical Analysis of Its Key Design Parameters (쉴드터널 세그먼트 라이닝의 최신 기술동향과 핵심 설계항목의 통계 분석)

  • Chang, Soo-Ho;Lee, Gyu-Phil;Choi, Soon-Wook;Bae, Gyu-Jin
    • Tunnel and Underground Space
    • /
    • 제21권6호
    • /
    • pp.427-438
    • /
    • 2011
  • Segment lining is a key permanent lining structure to maintain the shield tunnel stability in shield tunnel operation. Moreover, segment lining generally accounts for the largest proportion in the shield tunnel construction costs. As a result, technical improvements to increase its economic feasibility have been actively carried out. This study aims to propose the development directions of high-performance segments from their recent cutting technologies. In addition, based on over 2,100 world-widely collected segment design data, a series of statistical analyses of segment key design parameters such as thickness, width and the number of divisions as well as segment materials were carried out to approximately estimate them in a design stage.

Comparison of Striking Distance Formulae and Their Effect on Lightning Shielding Analysis (뇌 차폐 해석에서 뇌격흡인 거리 수식과 영향 비교)

  • Kim, Sung-Sam
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • 제60권4호
    • /
    • pp.694-699
    • /
    • 2011
  • This paper compares the performance of lightning shielding analysis methods using the seven striking distance formulae in substation. For comparison, we evaluate the number of expected strikes and exposed area using WinIGS Software. Seven striking distance formulae are compared using the electrogeometric model analysis and the rolling sphere method. Based on the electrogeometric model analysis, the risk of shielding failure in either the whole substation or parts of it is determined. According to the simulation results, one can justify whether the substation satisfies the criterion of shielding design. In particular, according to the rolling sphere method, the exposed areas in substation determine the location of the additional shielding poles or shield wires. Therefore, the installation of the additional shielding poles and shield wires in substation was accepted by shield design at the phase conductors exposed in the larger area.

Behavior of Surface Flashover Depending on Shape and Gap Distance of End Shield in Vacuum Interrupter (진공인터럽터 내부 End Shield형상과 갭거리에 따른 연면방전거동)

  • Yoon, Jae-Hun;Lim, Kee-Jo
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • 제23권2호
    • /
    • pp.169-173
    • /
    • 2010
  • Because of power consumption increase, global warming, and limitation of installation, not only high reliability and interruption capability but also compact and light power apparatuses are needed. In this paper, E field calculation and experiment were processed to identify the influence of the shape of end shield and gap distance. It is expected that the results of FEM simulation and experiments could be the basic data to develop VI. the results of FEM simulation and experiments are as following. Firstly, maximum E fields were compared by means of finite element method as a function of the shape of end shield. 3 types of models were used to analyze maximum E field of each model and the influence of shape of shield could be identified. As a result, proposed L type shield could reduce the maximum E field by 20%. Secondly, the influence of the gap distance between end shields on E field was analyzed. As the gap distance become short the gap distance between inner walls of ceramic also become short. And the maximum E field concentrated on inner wall of ceramic finally increased. Thirdly, the experiment was conducted by fabricating each prototype. As a result, no creepage occurred in shieldless model. In other words, creepage occurred in the shield-installed models. And creepage inception voltages were different from each other because of the difference of maximum E field. Fourthly, The equation that shows relation between calculated E field and measured creepage inception voltage was proposed as a result of FEM analysis and experiment. It is concluded that when designing VI this equation could be important data to reduce time and cost by identifying indirectly the optimal gap distance and the shape of shield required to prevent creepage.

Analysis of correlation between shield TBM construction field data and settlement measurement data (쉴드 TBM 시공데이터와 지반침하 계측데이터 간 상관성 분석)

  • Jung, Ye-Rim;Nam, Kyoung-Min;Kim, Han-Eol;Ha, Sang-Gui;Yun, Ji-Seok;Cho, Jae-Eun;Yoo, Han-Kyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • 제24권1호
    • /
    • pp.79-94
    • /
    • 2022
  • The demand for tunnel construction is increasing as part of underground space development due to urban saturation. The shield TBM method minimizes vibration and noise and minimizes ground deformation that occurs simultaneously with excavation, and shield TBM is generally applied to tunnel construction in urban areas. The importance of urban ground settlement prediction is increasing day by day, and in the case of shield TBM construction, ground deformation is minimized, but ground settlement due to tunnel excavation inevitably occurs. Therefore, in this study, the correlation between shield TBM, which is highly applicable to urban areas, and ground settlement is analyzed to suggest the shield TBM construction factors that have a major effect on ground settlement. Correlation analysis was performed between the shield TBM construction data and ground settlement measurement data collected at the actual site, and the degree of correlation was expressed as a correlation coefficient "r". As a result, the main construction factors of shield TBM affecting ground settlement were thrust force, torque, chamber pressure, backfill pressure and muck discharge. Based on the results of this study, it is expected to contribute to the presentation of judgment criteria for major construction data so that the ground settlement can be predicted and controlled in advance when operating the shield TBM in the future.