• Title/Summary/Keyword: settlement monitoring

Search Result 189, Processing Time 0.033 seconds

Trend and Development Direction of Restoration Technology Utilization in Ecosystem Conservation Charge Project - Focusing on Implementation Cases from 2014 to 2020 - (생태계보전부담금 반환사업의 복원기술 활용 경향과 방향 - 2014년부터 2020년까지 시행 사례를 중심으로 -)

  • Yoon, Young-Kwan;Lee, Ho-Woo;Koo, Bon-Hak
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.26 no.5
    • /
    • pp.1-18
    • /
    • 2023
  • The Ecosystem Conservation Levy (formerly known as the Ecosystem Conservation Cooperation Fund) system has been in place for 20 years, and it can be said that it has now entered the settlement stage. Based on an analysis of publicly available project implementation data from 2014 to 2020, we found that: 1) As the number of return projects increases, the targets of restoration technologies are also strengthening, and it is necessary to frame a series of processes from application, creation, and monitoring for some detailed projects to improve the effectiveness and efficiency of utilizing the levy. 2) Most of the implemented projects are applied as micro-ecosystem creation, but there are many cases where the contents of the project can be seen as other project categories. This shows that the purpose of the return project needs to be approached more clearly and suggests that institutional complementation is needed from the project application stage. 3) The detailed technologies applied tend to be gradually expanding, but most of them are technologies that are not differentiated from general development projects. It is urgent to secure a more technical identity, such as a range and list of utilized technologies suitable for the characteristics and purposes of return projects. 4) It is necessary to establish a relevant evaluation system or framework to utilize the monitoring results of restoration projects. 5) There have been few cases of application of single restoration technologies since the beginning, but the content and scope of the complexity tend to expand in recent years. Even if the objectives are not comprehensive and diverse, it can be seen that many parts of the projects are oriented toward convergence, so it is necessary to conduct separate research on this. 6) As for the direction of improvement of the return project, it is possible to consider expanding the restoration and conservation focus to partially accommodate the complexity of the natural environment and human ecology. It seems that the expansion of restoration technologies that consider the role and function of humans in the natural environment should be explored.

A Study on Image Copyright Archive Model for Museums (미술관 이미지저작권 아카이브 모델 연구)

  • Nam, Hyun Woo;Jeong, Seong In
    • Korea Science and Art Forum
    • /
    • v.23
    • /
    • pp.111-122
    • /
    • 2016
  • The purpose of this multi-disciplinary convergent study is to establish Image Copyright Archive Model for Museums to protect image copyright and vitalize the use of images out of necessity of research and development on copyright services over the life cycle of art contents created by the museums and out of the necessity to vitalize distribution market of image copyright contents in creative industry and to formulate management system of copyright services. This study made various suggestions for enhancement of transparency and efficiency of art contents ecosystem through vitalization of use and recycling of image copyright materials by proposing standard system for calculation, distribution, settlement and monitoring of copyright royalty of 1,000 domestic museums, galleries and exhibit halls. First, this study proposed contents and structure design of image copyright archive model and, by proposing art contents distribution service platform for prototype simulation, execution simulation and model operation simulation, established art contents copyright royalty process model. As billing system and technological development for image contents are still in incipient stage, this study used the existing contents billing framework as basic model for the development of billing technology for distribution of museum collections and artworks and automatic division and calculation engine for copyright royalty. Ultimately, study suggested image copyright archive model which can be used by artists, curators and distributors. In business strategy, study suggested niche market penetration of museum image copyright archive model. In sales expansion strategy, study established a business model in which effective process of image transaction can be conducted in the form of B2B, B2G, B2C and C2B through flexible connection of museum archive system and controllable management of image copyright materials can be possible. This study is expected to minimize disputes between copyright holder of artwork images and their owners and enhance manageability of copyrighted artworks through prevention of such disputes and provision of information on distribution and utilization of art contents (of collections and new creations) owned by the museums. In addition, by providing a guideline for archives of collections of museums and new creations, this study is expected to increase registration of image copyright and to make various convergent businesses possible such as billing, division and settlement of copyright royalty for image copyright distribution service.

Trend Analysis of Curriculum Application Status of 2015 Revised Integrated Science and Scientific Laboratory Experiment Curriculum (2015 개정 통합과학과 과학탐구실험 교육과정의 2차 년도 적용 현황 추이 분석)

  • Kwak, Youngsun
    • Journal of the Korean Society of Earth Science Education
    • /
    • v.13 no.1
    • /
    • pp.53-63
    • /
    • 2020
  • The purpose of this study is to analyze the current status of the second year of application of Integrated Science and Science Laboratory Experiments, which are common courses of high school, and to explore suggestions for curriculum development in the future. To this end, the results of the survey of a total of 244 science-core and general high schools were compared with the survey result of 2018 school year. In addition, in-depth interviews were conducted with nine science teachers of the focus group to discuss the current state of curriculum implementation. According to the results, as in the first year, most of the Integrated Science courses were implemented in 6-8 units, and in most schools the number of teachers in charge of Integrated Science per class were 3-4. In the teacher's focus group interview, teachers insisted that Integrated Science requires integrated teaching approaches and is good for generating students' interest, but it is difficult to implement process-based assessment due to issues such as ensuring fairness of assessment. Most of Science Laboratory Experiments courses were implemented in two semesters, one unit per semester, and there was little link between Integrated Science and Science Laboratory Experiments because of the different teaching staff. The school life record entry method of Science Laboratory Experiments has been changed to criterion-based assessment starting in 2019, so students' satisfaction or flow of classes is much better than expected, and teachers can teach without burden. Based on the research results, ways to support the settlement of Integrated Science and Science Laboratory Experiments as common subjects, and ways to improve those subjects in the next curriculum revision were suggested.

Case Study of the Stability of a Large Cut-Slope at a Tunnel Portal (터널 입구부 대절토 사면 안정성 사례 연구)

  • Park, Dong Soon;Bae, Jong-Soem
    • The Journal of Engineering Geology
    • /
    • v.25 no.1
    • /
    • pp.115-129
    • /
    • 2015
  • The cut-slope of a large-sectional tunnel portal is recognized as a potential area of weakness due to unstable stress distribution and possible permanent displacement. This paper presents a case study of a slope failure and remediation for a large-scale cut-slope at a tunnel portal. Extensive rock-slope brittle failure occurred along discontinuities in the rock mass after 46 mm of rainfall, which caused instability of the upper part of the cut-slope. Based on a geological survey and face mapping, the reason for failure is believed to be the presence of thin clay fill in discontinuities in the weathered rock mass and consequent saturationinduced joint weakening. The granite-gneiss rock mass has a high content of alkali-feldspar, indicating a vulnerability to weathering. Immediately before the slope failure, a sharp increase in displacement rate was indicated by settlement-time histories, and this observation can contribute to the safety management criteria for slope stability. In this case study, emergency remediation was performed to prevent further hazard and to facilitate reconstruction, and counterweight fill and concrete filling of voids were successfully applied. For ultimate remediation, the grid anchor-blocks were used for slope stabilization, and additional rock bolts and grouting were applied inside the tunnel. Limit-equilibrium slope stability analysis and analyses of strereographic projections confirmed the instability of the original slope and the effectiveness of reinforcing methods. After the application of reinforcing measures, instrumental monitoring indicated that the slope and the tunnel remained stable. This case study is expected to serve as a valuable reference for similar engineering cases of large-sectional slope stability.

Geotechnical investigation on causes and mitigation of ground subsidence during underground structure construction (터널 및 지중매설물 시공에 따른 지반함몰 발생 원인 및 대책에 대한 지반공학적 조사 연구)

  • Choi, Shin-Kyu;Back, Seung-Hun;An, Jun-Beom;Kwon, Tae-Hyuk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.2
    • /
    • pp.143-154
    • /
    • 2016
  • This study investigated the occurrences, causes, and mitigation of the recent ground subsidence and underground cavity generation events in Korea. Two main causes of ground subsidence are (1) the soil erosion by seepage during tunneling and earth excavation and (2) the damage of underground pipes. The main cause of the soil erosion during tunneling was the uncontrolled groundwater flow. Especially, when excavating soft grounds using a tunnel boring machine (TBM), the ground near TBM operation halt points were found to be the most vulnerable to failure. The damage of underground pipes was mainly caused by poor construction, material deterioration, and differential settlement in soft soils. The ground subsidence during tunneling and earth excavation can be managed by monitoring the outflow of groundwater and eroded soils in construction sites. It is expected that the ground subsidence by the underground pipe damage can be managed or mitigated by life cycle analysis and maintenance of the buried pipes, and by controlling the earth pressure distribution or increasing the bearing capacity at the upper ground of the buried pipes.

An Application of Construction Sequence Analysis for Checking Structural Stability of High-Rise Building under Construction (초고층 건물의 시공 중 구조적 안정성 검토를 위한 시공단계해석의 적용)

  • Eom, Tae-Sung;Kim, Jae-Yo
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.22 no.3
    • /
    • pp.211-221
    • /
    • 2009
  • With recent trends of super-tallness, atypical plan shapes and zoning constructions in high-rise buildings, a structural stability of the building under construction is arising as a key issue for design and construction plan. To ensure the structural stability under construction, the differential column shortening of vertical members, the lateral displacement of tower frames, and differential settlement of raft foundation by unbalanced distributions of a tower self-weight before the completion of a lateral load resisting system should be checked by construction sequence analysis, which should be performed by systematic combinations with structural health monitoring, construction compensation program, and construction panning. This paper presents the scheme of zone-based construction sequence analysis by using the existing commercial analysis program, to check the stability of high-rise building under construction. This scheme is applied to 3-dimensional structural analysis for a real high-rise building under construction. The analysis includes real construction zoning plans and schedules as well as creep and shrinkage effects and time-dependent properties of concrete. The simplified construction sequence and assumed material properties were continuously updated with the change on construction schedule and correlations with in-situ measurement data.

Track Stability Assessment for Deep Excavations in Adjacent to Urban Railways (도시철도 인접지반 깊은 굴착 시 궤도 안정성 평가)

  • Jeon, Sang-Soo;Lee, Sang-Seung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.6
    • /
    • pp.614-627
    • /
    • 2018
  • Urban railway lines have been constructed adjacent to residential buildings and urban areas. The expansion of transportation networks and reconstruction of residential buildings in highly populated urban areas require deep excavations in areas adjacent to urban railways. Mobilized soil stresses and changes in the groundwater level induced by deep excavations results in track irregularities in urban railways. In this study, a three-dimensional finite difference model using the commercial program FLAC3D was adopted to estimate the horizontal displacements of earth retaining structures, settlements of backfill, the stability of track irregularity and underground box structure based on the criteria of each railway organization and its relationships. In deep excavations, a change in groundwater level induces relatively very small differences for track gauge irregularities, whereas relatively large differences for longitudinal irregularities of 72.5%, twist irregularities of 83.3%, cross level irregularities of 61.9%, and alignments of 43.3% were found to be the maximum differences when the horizontal displacement of earth retaining wall and settlement of backfill were 65.1% and 21.4%, respectively, because the groundwater level (GWL) on the ground surface-mobilized tensile strength of the underground box structure exceeds the allowable value. Therefore, three-dimensional numerical analysis was performed in this study. Overall, real-time monitoring should be carried out to prevent railway accidents in advance when a deep excavation adjacent to urban railway structures is constructed.

Consolidation Behavior of Vertical Drain in consideration of Smear Effect and Well Resistance (교란효과와 배수저항을 고려한 연직 배수재의 압밀 거동)

  • Kim, Tae Woo;Kang, Yea Mook;Lee, Dal Won
    • Korean Journal of Agricultural Science
    • /
    • v.25 no.2
    • /
    • pp.225-234
    • /
    • 1998
  • This study was compared the degree of consolidation by Hyperbolic, Curve fitting, Asaoka's, Monden's methods using measured value with theoretical curve in consideration of smear effect and well resistance. The results of the study were summarized as follows ; 1. The degree of consolidation by Hyperbolic method was underestimated than the degree of consolidation by Curve fitting, Asaoka's, and Monden's methods. 2. Typical range of horizontal coefficient of consolidation was $C_h=(2{\sim}3)C_v$ in the case considering smear effect and well resistance, and $C_h=(0.5{\sim}2.5)C_v$ in the case disregarding smear effect and well resistance. 3. The degree of consolidation obtained by ground settlement monitoring was nearly same value when the coefficient of permeability of smear zone by back analysis was shown the half that of in-situ and the diameter of smear zone was shown double that of mendrel. 4. Increasing of diameter reduction ratio of drain, the time of consoildation was delayed. The affection of well resistance the case of small coefficient of permeability was much more than that in the case of large coefficient of permeability. It was recommended that design of diameter reduction of drain consider smear effect and well resistance.

  • PDF

3D Wetlands Classification Mapping of Eulsukdo Area Using LiDAR Data (LiDAR 자료를 이용한 을숙도 지역 3차원 습지 구분도 제작)

  • Lee, Jae-One;Yi, Gi-Chul;Kim, Yong-Suk;We, Kwang-Jae
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.27 no.6
    • /
    • pp.639-647
    • /
    • 2009
  • In line with the rapid settlement of information society, the demand for geospatial information and its applications are dramatically increasing. The Project of National Geographic Information System(NGIS) is actively on going to meet up-to-dateness and accuracy of geospatial data. It is fact that the public interest in environmental issues is increasing than ever in accordance with the restoration of the four major rivers, core project of Green New Deal Policy, and the event of the Ramsar General Meeting. Because the Nakdong River Estuary is a place of great importance in both aspects of wetland and environment conservation, a variety of researches related to this area are progressing. Although artificial developments and natural phenomena are rapidly changing the topography and ecosystem of this area, the effort to build topographic DB for change monitoring is very slow. This study describes a Lidar surveying project over the restored wetland Eulsukdo, the southermost part of the Nakdong River, to establish precise topographic DB throughout producing 3D topographical maps and wetland classification maps. The results of this study will make a large contribution to the systematic maintenance and management for the restored Eulsukdo wetland.

A Study for Enhancing Disaster Operations Management at Seoul Emergency Operations Center - Focused on the Education and Training for Firefighters of Seoul (서울종합방재센터 상황실 재난상황관리능력 제고 방안 - 서울특별시 소방공무원 교육훈련을 중심으로)

  • Park, Soonil;Park, Chanseok
    • Journal of the Society of Disaster Information
    • /
    • v.14 no.4
    • /
    • pp.480-491
    • /
    • 2018
  • Purpose : This study aims to suggest social support composed of organizational support and managerial support would be systematically managed to enhance Disaster Operations Management at Seoul Emergency Operations Center. Method : Emotional labor was used as an independent variable, and organizational commitment was used as a dependent variable to analyze the mediating effects of social support. Results : First, in the aspect of organizational support, the objective evaluation of disaster situation management, disaster situation management emotional labor reduction education and training program development, monitoring of disaster situation management, quality improvement and work imbalance mitigation of firefighters, and emergency coordination managers are needed for systematic work management for emotional labor settlement. Secondly, it is necessary to select competent firefighters in the level of managerial support, to prepare healing measures for structured phased emotional labor for firefighters, and to have counseling competency for managers for emotional labor firefighting officers. Conclusion : In order to improve disaster management ability, education and training programs should be developed to improve organizational commitment based on social support.