• 제목/요약/키워드: series-parallel

검색결과 966건 처리시간 0.025초

그림자 영향과 태양광 어레이 구조에 따른 최대발생전력 비교 해석 및 실험 (Comparison of maximum generated power by shading effect and PV array configurations)

  • 김의종;유병규;차한주;유권종
    • 한국태양에너지학회 논문집
    • /
    • 제29권2호
    • /
    • pp.8-13
    • /
    • 2009
  • In this paper, two configurations of PV array are analyzed and tested under shading condition, where two configurations are series-parallel and total-crass-tied configuration. Each photovoltaic module is emulated by two 5 inch po1y-crystalline cells in series and an array is constructed by connecting 24 of the modules to compare a generated maximum power of the two configurations. Pspice and Sun simulator. PASAN IIIb, are used for simulation and experiment to test the array under various partial shading conditions. Test results show the total-cross-tied configuration generates 7.63% higher maximum power than the series-parallel configuration, and it is well matched to the analysis and simulations of the two configurations.

직렬 능동 보상기를 이용한 Line-Interactive UPS의 새로운 제어 기법 (A New Control Scheme of the Line-Interactive UPS Using the Series Active Compensator)

  • 장훈;이우철;현동석
    • 대한전기학회논문지:전기기기및에너지변환시스템부문B
    • /
    • 제52권8호
    • /
    • pp.405-412
    • /
    • 2003
  • This paper presents a three-phase Line-Interactive uninterruptible power supply (UPS) system with series-parallel active power-line conditioning capabilities, using synchronous reference frame (SRF) based controller, which allows an effective power factor correction, source harmonic voltage compensation, load harmonic current suppression, and output voltage regulation. The three-phase UPS system consists of two active power compensator topologies. One is a series active compensator, which works as a voltage source in phase with the source voltage to have the sinusoidal source current and high power factor under the deviation and distortion of the source voltage. The other is a parallel active compensator which works as a conventional sinusoidal voltage source in phase with the source voltage, providing to the load a regulated and sinusoidal voltage with low THD (total harmonic distortion). The control algorithm using SRF method and the active power flow through the Line-interactive UPS systems are described and studied. The simulation and experimental results are depicted in this paper to show the effect of the proposed algorithm.

새로운 위상전이 병렬입력/직렬출력 모듈화를 적용한 듀얼 컨버터 (A New Phase Shift PWM Parallel-input/series-output Modularized Dual Converter)

  • 노정욱
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2000년도 전력전자학술대회 논문집
    • /
    • pp.270-273
    • /
    • 2000
  • A new phase shift PWM parallel-input/series-output modularized dual converter is proposed in this paper. This converter is operated with a fixed duty ratio and its output voltage is regulated by phase shift between each module. Since the operating duty ratio of each module is fixed it is sufficient to implement a simple open loop drive circuitry for each module and the cost of total system can be much reduced. The operation of the converter is analyzed in this paper and verified by computer simulation.

  • PDF

직렬입력-병렬출력 연결된 2-스위치 포워드 컨버터의 시간 영역 시뮬레이션을 위한 고속 분리 알고리즘 (A Fast-Decoupled Algorithm for Time-Domain Simulation of Input-Series-Output-Parallel Connected 2-Switch Forward Converter)

  • 김만고
    • 동력기계공학회지
    • /
    • 제6권3호
    • /
    • pp.64-70
    • /
    • 2002
  • A fast decoupled algorithm for time domain simulation of power electronics circuits is presented. The circuits can be arbitrarily configured and can incorporate feedback amplifier circuits. This simulation algorithm is performed for the input series output parallel connected 2 switch forward converter. Steady state and large signal transient responses due to a step load change are simulated. The simulation results are verified through experiments.

  • PDF

주파수 추적을 위한 직병렬 구조의 새로운 주종 필터뱅크 (A New Master-Slave Filter-Bank with Series-Parallel Structure for Tracking Center Frequency)

  • 윤형식;임재환;이석필;박상희
    • 대한전기학회논문지
    • /
    • 제43권2호
    • /
    • pp.339-345
    • /
    • 1994
  • A new filter-bank is proposed in order to track center frequency of narrow band signal. The two banks are connected in series-parallel. The master filter bank which is made of traditional filter bank detects the center frequency roughly. And the performance for tracking center frequency is greatly improved by the slave filter bank which is based on energy-difference estimator. Computer simulations show that it achieves a good tracking accuracy.

  • PDF

공진 인덕터 보조권선을 이용한 개선된 LCLC 공진형 컨버터 (An improved LCLC Resonant Converter using Auxiliary winding of Resonant Inductor)

  • 백주원;이영식;정창용;조정구;김흥근
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 1999년도 전력전자학술대회 논문집
    • /
    • pp.472-475
    • /
    • 1999
  • An improved series-parallel resonant converter using auxiliary winding of resonant is presented. The conventional series-parallel resonan converter and newly developed converter are compared for high voltage application. This proposed converter gives several merits such a wide load ranges, small circulating current, low peak voltage at no load. Two experimental results for the proposed converter and conventional one are presented for conventional LCC type converter and the proposed one.

  • PDF

직렬입력-병렬출력 연결된 2-스위치 포워드 컨버터에 대한 이산 시간 영옌 고속 시뮬레이션 (A Fast Discrete-Time-Domain Simulation for the Input- Series -Output-Parallel Connected 2-Switch Forward Converter)

  • 김만고
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2002년도 전력전자학술대회 논문집
    • /
    • pp.533-537
    • /
    • 2002
  • A fast time domain modeling and simulation is performed for the input-series-output-parallel connected 2-switch forward converter Steady-state and large-signal transient responses due to a step load change are simulated. The simulation results are verified through experiments.

  • PDF

10KVA 급 직병렬 보상형 무정전 전원 장치 (10KVA Series-Parallel compensated UPS)

  • 전성즙;조규형
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 하계학술대회 논문집 B
    • /
    • pp.1083-1086
    • /
    • 2000
  • In this paper a development of 10KVA series-parallel compensated UPS is shown, which has high input power factor and sinusoidal output voltage regulation capability. Compared to conventional cascaded UPS, the size can be reduced significantly with high quality input and output waveforms. The front converter and the main inverter can be considered decoupled, hence the front converter and the main inverter can be designed independent of each other. In this paper, analysis and experimental results for an 10 KVA prototype are presented.

  • PDF

A Batch Sequential Sampling Scheme for Estimating the Reliability of a Series/Parallel System

  • Enaya, T.;Rekab, L.;Tadj, L.
    • International Journal of Reliability and Applications
    • /
    • 제11권1호
    • /
    • pp.17-22
    • /
    • 2010
  • It is desired to estimate the reliability of a system that has two subsystems connected in series where each subsystem has two components connected in parallel. A batch sequential sampling scheme is introduced. It is shown that the batch sequential sampling scheme is asymptotically optimal as the total number of units goes to infinity. Numerical comparisons indicate that the batch sequential sampling scheme performs better than the balanced sampling scheme and is nearly optimal.

  • PDF

Dynamic response of pile groups in series and parallel configuration

  • Sawant, V.A.;Ladhane, K.B.
    • Structural Engineering and Mechanics
    • /
    • 제41권3호
    • /
    • pp.395-406
    • /
    • 2012
  • Basic problem of pile foundation is three dimensional in nature. Three dimensional finite element formulation is employed for the analysis of pile groups. Pile, pile-cap and soil are modeled using 20 node element, whereas interface between pile or pile cap and soil is modeled using 16 node surface element. A parametric study is carried out to consider the effect of pile spacing, number of piles, arrangement of pile and soil modulus on the response of pile group. Results indicate that the response of pile group is dependent on these parameters.