• Title/Summary/Keyword: sequential repair

Search Result 19, Processing Time 0.029 seconds

Repair policies of failure detection equipments and system availability

  • Na, Seongryong;Bang, Sung-Hwan
    • Communications for Statistical Applications and Methods
    • /
    • v.29 no.2
    • /
    • pp.151-160
    • /
    • 2022
  • The total system is composed of the main system (MS) and the failure detection equipment (FDE) which detects failures of MS. The analysis of system reliability is performed when the failure of FDE is possible. Several repair policies are considered to determine the order of repair of failed systems, which are sequential repair (SQ), priority repair (PR), independent repair (ID), and simultaneous repair (SM). The states of MS-FDE systems are represented by Markov models according to repair policies and the main purpose of this paper is to derive the system availabilities of the Markov models. Analytical solutions of the stationary equations are derived for the Markov models and the system availabilities are immediately determined using the stationary solutions. A simple illustrative example is discussed for the comparison of availability values of the repair policies considered in this paper.

Bayesian Method for Sequential Preventive Maintenance Policy

  • Kim Hee Soo;Kwon Young Sub;Park Dong Ho
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2005.06a
    • /
    • pp.131-137
    • /
    • 2005
  • In this paper, we propose a Bayesian approach to determine the adaptive preventive maintenance(PM) policy for a general sequential imperfect PM model proposed by Lin, Zuo and Yam(2000) that PM not only reduces the effective age of the system but also changes the hazard rate function. Assuming that the failure times follow Weibull distribution, we adopt a Bayesian approach to update unknown parameters and determine the Bayesian optimal sequential PM policies. Finally, numerical examples of the optimal adaptive PM policy are presented for illustrative purposes.

  • PDF

Postoperative Ultrasound Findings of the Rotator Cuff Tendon after Arthroscopic Repair of a Rotator Cuff Tear (회전근개 파열의 수술적 치료 후 회전근개 초음파 소견)

  • Kwon, Dong Rak
    • Clinical Pain
    • /
    • v.19 no.2
    • /
    • pp.64-69
    • /
    • 2020
  • Ultrasound (US) imaging is an efficient, easy to use, rapid, dynamic, noninvasive, with rare side-effects and inexpensive tool allowing for facilitated diagnosis and management of the painful shoulder. It also has advantages over other imaging modalities in the evaluation of the postoperative shoulder for rotator cuff integrity and correct anchor and suture placement, as well as rotator cuff analysis following repair surgery. Early postoperative tendons frequently had a hypo- echoic echo texture and the absence of a fibrillar pattern, which might be misinterpreted as recurrent tears. however, these features often normalized into tendons with an increased echo texture and the reappearance of a fibrillar pattern at 6 months. Based on these sequential findings, the US findings within 3 months after surgery should be interpreted with caution to accurately understand and monitor the repaired tendon status.

Antifuse Circuits and Their Applicatoins to Post-Package of DRAMs

  • Wee, Jae-Kyung;Kook, Jeong-Hoon;Kim, Se-Jun;Hong, Sang-Hoon;Ahn, Jin-Hong
    • JSTS:Journal of Semiconductor Technology and Science
    • /
    • v.1 no.4
    • /
    • pp.216-231
    • /
    • 2001
  • Several methods for improving device yields and characteristics have been studied by IC manufacturers, as the options for programming components become diversified through the introduction of novel processes. Especially, the sequential repair steps on wafer level and package level are essentially required in DRAMs to improve the yield. Several repair methods for DRAMs are reviewed in this paper. They include the optical methods (laser-fuse, laser-antifuse) and the electrical methods (electrical-fuse, ONO-antifuse). Theses methods can also be categorized into the wafer-level(on wafer) and the package-level(post-package) repair methods. Although the wafer-level laser-fuse repair method is the most widely used up to now, the package-level antifuse repair method is becoming an essential auxiliary technique for its advantage in terms of cost and design efficiency. The advantages of the package-level antifuse method are discussed in this paper with the measured data of manufactured devices. With devices based on several processes, it was verified that the antifuse repair method can improve the net yield by more than 2%~3%. Finally, as an illustration of the usefulness of the package-level antifuse repair method, the repair method was applied to the replica delay circuit of DLL to get the decrease of clock skew from 55ps to 9ps.

  • PDF

Transient Ground Deformation induced by Sequential Earthquakes and Estimation of Underground Water Pipeline Performance in Canterbury, New Zealand (뉴질랜드 캔터배리 지역 연속지진에 의해 발생된 일시지반변형과 매설된 상수도관 성능평가)

  • Jeon, Sang-Soo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.4
    • /
    • pp.2818-2827
    • /
    • 2015
  • The spatial patterns and characteristics of these sequential earthquakes and ground motions induced by the earthquakes are examined by contours of peak ground velocity (PGV) and geometric mean peak ground velocity (GMPGV) using both ordinary kriging in geographical information system (GIS) and data, the records obtained from strong motion stations, acquired after recent sequential earthquakes in Canterbury, New Zealand (NZ). The performance of underground water pipeline system is examined by using data acquired after earthquakes. The spatial distribution of GMPGV is superimposed on water pipeline repairs throughout the water distribution system in areas affected principally by transient ground motion using GIS and then water pipeline repair rates, expressed as repairs/km, for different types of pipe are evaluated relative to the estimated GMPGV outside liquefaction areas. The earthquake performance of underground water pipeline systems is summarized in this study.

Combined Orbital Fractures: Surgical Strategy of Sequential Repair

  • Hur, Su Won;Kim, Sung Eun;Chung, Kyu Jin;Lee, Jun Ho;Kim, Tae Gon;Kim, Yong-Ha
    • Archives of Plastic Surgery
    • /
    • v.42 no.4
    • /
    • pp.424-430
    • /
    • 2015
  • Background Reconstruction of combined orbital floor and medial wall fractures with a comminuted inferomedial strut (IMS) is challenging and requires careful practice. We present our surgical strategy and postoperative outcomes. Methods We divided 74 patients who underwent the reconstruction of the orbital floor and medial wall concomitantly into a comminuted IMS group (41 patients) and non-comminuted IMS group (33 patients). In the comminuted IMS group, we first reconstructed the floor stably and then the medial wall by using separate implant pieces. In the non-comminuted IMS group, we reconstructed the floor and the medial wall with a single large implant. Results In the follow-up of 6 to 65 months, most patients with diplopia improved in the first-week except one, who eventually improved at 1 year. All patients with an EOM limitation improved during the first month of follow-up. Enophthalmos (displacement, 2 mm) was observed in two patients. The orbit volume measured on the CT scans was statistically significantly restored in both groups. No complications related to the surgery were observed. Conclusions We recommend the reconstruction of orbit walls in the comminuted IMS group by using the following surgical strategy: usage of multiple pieces of rigid implants instead of one large implant, sequential repair first of the floor and then of the medial wall, and a focus on the reconstruction of key areas. Our strategy of step-by-step reconstruction has the benefits of easy repair, less surgical trauma, and minimal stress to the surgeon.

A Simulation Study on the Overhaul Repair Shop of Weapon System (전면정비방식의 무기체계 정비공장에 대한 시뮬레이션 연구)

  • Shin, Kyeong-Wook;Lee, Geun-Hyu;Moon, Dug-Hee
    • Journal of the Korea Society for Simulation
    • /
    • v.20 no.3
    • /
    • pp.119-127
    • /
    • 2011
  • Overhaul and repair service means the sequential processes of disassembly, repair and reassembly for a product which has been used for a long time. Overhaul is required for the companies producing airplanes, ships, trains, military weapons and heavy industrial equipments which are very expensive and have a long life cycle. The most important performance measure of the overhaul repair shop is usually the lead time. Thus, how to design the manufacturing system to meet the delivery date is a major concern in overhaul repair shop. This paper introduces the case study of an overhaul repair shop producing military weapon systems with the 3D simulation tool, $QUEST^{TM}$. At first, the characteristics of overhaul shop and what should be considered for simulation modeling are explained. Then, various simulation scenarios including two types of disassembly systems, one is flow line system and the other is cell system, are discussed with the results of simulation experiments.

The Effect of Failure Detection Equipment on System Availability (시스템 가용도에 미치는 고장감지장치의 영향)

  • Na, Seongryong;Bang, Sung-Hwan
    • The Korean Journal of Applied Statistics
    • /
    • v.26 no.1
    • /
    • pp.111-118
    • /
    • 2013
  • In this paper we study the effect of failure detection equipment(FDE)s on system availability. A new repair scheme is considered for the step of repairing FDE which becomes out of order in the course of repairing the main system(MS). We compute and compare the availability of MS.

NMR PEAK ASSIGNMENT FOR THE ELUCIDATION OF THE SOLUTION STRUCTURE OF T4 ENDONUCLEASE V

  • Im, Hoo-Kang;Jee, Jun-Goo;Yu, Jun-Suk;Lee, Bong-Jin
    • Proceedings of the Korean Biophysical Society Conference
    • /
    • 1996.07a
    • /
    • pp.18-18
    • /
    • 1996
  • Bacteriophage T4 endonuclease V initiates the repair of ultraviolet (UV)-induced pyrimidine dimer photoproducts in duplex DNA. The mechanism of DNA strand cleavage involves four sequential steps: linear diffusion along dsDNA, pyrimidine dimer-specific binding, pyrimidine dimer-DNA glycosylase activity, and AP lyase activity. (omitted)

  • PDF

Improved Design of Engine Manufacturing Line Using Simulation (시뮬레이션을 사용한 엔진생산라인의 설계개선)

  • 오필범;임석철;한형상
    • Journal of the Korea Society for Simulation
    • /
    • v.9 no.1
    • /
    • pp.1-9
    • /
    • 2000
  • When a new manufacturing line is constructed, its production capacity can be substantially affected in its design stage. Computer simulation often provides better design by evaluating feasible alternatives. In this paper we study an automobile engine manufacturing line which is under construction. Three alternatives are considered in the design; (1) to use machining tools of longer life; (2) to reassign the buffer space to each sequential processes while maintaining the same total buffer length; and (3) to reduce the machine repair time to 30 minutes using TPM and maintenance team. Simulation results using AutoMod indicates that employing the three alternatives will save about 1.5 million dollars per year.

  • PDF