• Title/Summary/Keyword: school building project

Search Result 363, Processing Time 0.03 seconds

A Study on Predicting Construction Cost of Educational Building Project at early stage Using Support Vector Machine Technique (서포트벡터머신을 이용한 교육시설 초기 공사비 예측에 관한 연구)

  • Shin, Jae-Min;Kim, Gwang-Hee
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.11 no.3
    • /
    • pp.46-54
    • /
    • 2012
  • The accuracy of cost estimation at an early stage in school building project is one of the critical factors for successful completion. So various of techniques are developed to predict the construction cost accurately and expeditely. Among the techniques, Support Vector Machine(SVM) has an excellent ability for generalization performance. Therefore, the purpose of this study is to construct the prediction model for construction cost of educational building project using support vector machine technique. And to verify the accuracy of prediction model for construction cost. The performance data used in this study are 217 school building project cost which have been completed from 2004 to 2007 in Gyeonggi-Do, Korea. The result shows that average error rate was 7.48% for SVM prediction model. So using SVM model on predicting construction cost of educational building project will be a considerably effective way at the early project stage.

A Study on Predicting Construction Cost of School Building Projects Based on Support Vector Machine Technique at the Early Project Stage (Support Vector Machine을 이용한 교육시설 초기 공사비 예측에 관한 연구)

  • Shin, Jae-Min;Park, Hyun-Young;Shin, Yoon-Seok;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.153-154
    • /
    • 2012
  • The accuracy of cost estimation at an early stage in school building project is one of the critical factors for successful completion. So many method and techniques have developed that can estimate construction cost using limited information available in the early stage. Among the techniques, Support Vector Machine(SVM) has received attention in various field due to its excellent capacity for self-learning and generalization performance. Therefore, the purpose of this study is to verify the applicability of cost prediction model based on SVM in school building project at the early stage. Data used in this study are 139 school building cost constructed from 2004 to 2007 in Gyeonggi-Do. And prediction error rate of 7.48% in support vector machine is obtained. So the results showed applicability of using SVM model for predicting construction cost of school building projects.

  • PDF

Exploring a BIM-based approach of project management

  • MA, Xiaozhi;XIONG, Feng;DONG, Na
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.241-244
    • /
    • 2015
  • Within the building industry, building information modelling has been widely applied among different organizations, disciplines and project phases. In order to achieve coordination and synergy collaborative effort, it demands organized information flow and communication for effective implementation of project management through the construction process. Although many BIM researches provides solutions for project management, few efforts have involved the whole life-cycle process of project. In this article, BIM-based project management relying on a series of applications of BIM technology was introduced by coupling management requirement of a project with BIM. Through adopting BIM to the life-cycle management of the project and incorporating BIM applications to project management practice, we have developed a BIM-based project management approach that specialize in integrated BIM chain and interface-supporting system. At the end, the developing process of BIM-based project management approach is concluded.

  • PDF

Decision-making Reliability Estimation Model based on Building Construction Project Participants' Experience

  • Kim, Chang-Won;Kim, Baek-Joong;Yoo, Wisung;Cho, Hunhee;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.2
    • /
    • pp.148-158
    • /
    • 2013
  • Generally, building construction projects have a complex decision-making process because of the participation of various agents. In this situation, a final decision is arrived at by relying on subjective judgments based on the experience of project participants. For this reason, a method of assessing the objectivity of opinions is needed. In previous studies, the multi-criteria decision making method was applied to arrive at a final decision objectively, but this method has a limitation, in that the experience of each decision maker is not considered differently in the decision making process. Therefore, this study proposed a theoretical model using the S-shaped growth curve and regression analysis by building construction project type to quantitatively estimate decision-making reliability according to the experience of individual project participant`s. The developed model could be added to the Multi-criteria decision making method, and secure the objectivity and reliability of project participants' final opinion.

Schedule Management for Green Building Projects in Singapore: Schedule Delay, Causal Factors and Solutions

  • Hwang, Bon-Gang;Zhao, Xianbo;Leong, Lay Peng
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.527-531
    • /
    • 2015
  • With the mounting concerns over environmental issues, green construction is gaining a place in the global construction industry. However, rare research has been conducted to analyze green construction projects, especially in the aspect of project schedule performance. As a result, this study aims to investigate the degree of project delay in green building construction, analyze the factors affecting schedule delay of green building projects, and finally provide recommendations to improve schedule performance of green building project. To achieve the objectives, a comprehensive literature review was carried out, followed by a survey conducted with 30 companies that provided data from 220 traditional and 96 green building projects. The analysis of the responses identified that 15.9% of the traditional building projects were delayed while 32.3% of the green building projects were completed behind schedule. Furthermore, the amount of the delays in green building projects was an average of 4.8% of their planned schedule. The top 5 critical factors that can cause delay in green building projects were identified as: (1) speed of decision-making by clients; (2) speed of decision-making involving all project teams; (3) communication/coordination between key parties; (4) level of experience of consultants; and (5) difficulties in contractors' project financing. Lastly, a list of recommendations was introduced, aiming to reduce schedule delay in green building construction projects based on the observations. This study will serve as s a base for further research on the enhancement of green building project schedule performance.

  • PDF

Dynamic Modeling of Building Services Projects: A Simulation Model for Real-Life Hospital Project

  • Abhishek, V.;Jagadeesh, P.
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.3
    • /
    • pp.35-41
    • /
    • 2013
  • All infrastructure projects are said to be inter-dependent, uncertain and labour-intensive in nature. There is no exception for building services sub sector. For a real time project such as 'The construction, extension and refurbishment of Employees' State Insurance Corporation (ESIC) Hospital at Tirupathy, India with total area of 45,000 square feet at an estimated cost of 1100 million rupees, a generic process model is developed to simulate the effect of set of identified variables on construction project. The 'Stocks and Flows' of dynamic model affords relevant insights to project managers, who apply this knowledge when designing better performance through more appropriate project planning. It is concluded from the model-based approach that building services works can be improved through specific better focussed managerial efforts, such as an increasing coordination effectiveness at the planning stage, clarifying prerequisite conditions prior to installations. Otherwise, pending works arising from work clashes can lead to knock-on effects resulting in productivity constraints and pressures, as well as more rework and demolition. Current study reveals that the model enables deep insight into various interdependent processes, their by improving construction performance levels, by addressing the dynamics of design errors and defective works, and recovering delayed schedule.

Reducing Earthquake Fatalities and Destructions in Iran: A Project Management Perception

  • Tabassi, Amin Akhavan;Bakar, Abu Hassan Abu;Yusof, Nor'Aini
    • Asian Journal of Business Environment
    • /
    • v.4 no.1
    • /
    • pp.25-35
    • /
    • 2014
  • Purpose - Appropriate project management knowledge as well as its effective application in the construction industry increase construction quality and, therefore, reduce fatalities and destruction. Research design, data, and methodology - This study was conducted through a comparative analysis of earthquake fatalities in Iran, Turkey, Pakistan, Indonesia, China, Haiti, Japan, and the United States of America. The data was analyzed using a frequency study. The analysis contrasts the fatalities of some of the strongest earthquakes around the world between 1960 and 2010. Results - Poor quality construction practices and a lack of effective application of project management knowledge play a major role in the vast destruction, high death toll, and dismal tragedies that are associated with earthquakes, especially in Iran. Conclusions - Despite the history of tragic earthquakes and their continuing recurrence, this study attempts to make governments, companies, and disaster management personnel aware of the dangers of poor quality construction and the deficient application of project management knowledge and, further, accentuates effective ways to prevent the probability of serious damage in future. This study contains valuable information on the effects of project management application towards reducing earthquake fatalities and destruction.

Cooperative Design Method for Building Projects (건축 프로젝트의 협력설계 방안)

  • Kim, Eun-Youn;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.7 no.4
    • /
    • pp.67-76
    • /
    • 2011
  • Two main features of the recent building project are the enlargement of the size and the technological complexity. Due to these features, the number or the size of organizations participating in building project is also increasing and the relationships between the organizations are becoming more interdependent than ever. Owing to these features, some delays or errors in the decision-making process in the phase of planning of a building project may influence many subjects related to the project. The most important factor for a successful project is to arbitrate confrontations and build cooperative relationships between parties who have different interests with one another in the project. Efforts were made to find out general features of building project and the features in the phase of planning in order to set a direction of this research. To solve problems in the phase of planning, the concept of 'cooperative design', which means that different features and interests of various organizations should be reflected from the phase of planning, was introduced. By introducing cooperative design in building projects, more rapid and objective decision-makings are possible.

  • PDF

Development and Application of Guideline for Construction Management of School Building Seismic Retrofit (학교 건축물 내진보강 시공현장 관리를 위한 가이드라인 개발 및 적용에 관한 연구)

  • Hwang, Eun-A;Lee, Byoung-Ho;Park, Ku-Byoung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.36-37
    • /
    • 2020
  • The government seismic retrofit project for educational facilities is progressing more actively due to the 2018 Pohang earthquake. It is most important that seismic retrofit constructions are conformed to seismic design to achieve the desired purpose of the project as reduce direct damage caused by earthquake. However, the construction supervision system is not mandatory for the retrofit construction site of small buildings including school buildings according to applicable laws and regulations. The purpose of this study was to develop a guide for constructions management of school building seismic retrofit. In order to achieve this goal, the survey on the construction site was conducted and various problems related to the construction site of school building seismic retrofit was derived Additionally, the systematic checklist was presented according to the user and seismic reinforcement method.

  • PDF

Knowledge and Perception Level on Building Equipment Required of CMrs at the Project Design Stage

  • Jang, Young-Jun;Kim, Jin-Dong;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.674-681
    • /
    • 2012
  • With the rise in the functions required in modern building structures, the role of the building equipment that maintains the functions of a building has been emphasized and increased. Effective management in this area is only possible when the construction manager (CMr) is qualified and has the knowledge of building equipment that is needed. Therefore, in this study, a questionnaire survey was carried out on equipment engineers and CMrs, in order to determine the level of building equipment knowledge required, and to identify the perception level of CMrs about the building equipment in the construction project at the project design stage. The results of this study revealed that the CMrs surveyed had a lower level of knowledge on the building equipment than the level that was desired by the equipment engineers. This indicates that CMrs currently have a weak capacity for the management of building equipment. It is thus necessary for CMrs to undergo systematic training in order learn more about building equipment and thus be able to manage construction projects more efficiently.