• 제목/요약/키워드: scheduling method

검색결과 1,379건 처리시간 0.025초

Enhanced Technique for Performance in Real Time Systems (실시간 시스템에서 성능 향상 기법)

  • Kim, Myung Jun
    • Journal of Information Technology Services
    • /
    • 제16권3호
    • /
    • pp.103-111
    • /
    • 2017
  • The real time scheduling is a key research area in high performance computing and has been a source of challenging problems. A periodic task is an infinite sequence of task instance where each job of a task comes in a regular period. The RMS (Rate Monotonic Scheduling) algorithm has the advantage of a strong theoretical foundation and holds out the promise of reducing the need for exhaustive testing of the scheduling. Many real-time systems built in the past based their scheduling on the Cyclic Executive Model because it produces predictable schedules which facilitate exhaustive testing. In this work we propose hybrid scheduling method which combines features of both of these scheduling algorithms. The original rate monotonic scheduling algorithm didn't consider the uniform sampling tasks in the real time systems. We have enumerated some issues when the RMS is applied to our hybrid scheduling method. We found the scheduling bound for the hard real-time systems which include the uniform sampling tasks. The suggested hybrid scheduling algorithm turns out to have some advantages from the point of view of the real time system designer, and is particularly useful in the context of large critical systems. Our algorithm can be useful for real time system designer who must guarantee the hard real time tasks.

Efficient Scheduling Method based Cross-Layer on Mobile Communication Multimedia Environments (이동통신 멀티미디어 환경에서의 효율적인 크로스레이어 기반의 스케줄링 기법)

  • Kim, Joo-Seok;Kim, Hyung-Jung;Jo, Gweon-Do;Kim, Kyung-Seok
    • The Journal of the Korea Contents Association
    • /
    • 제7권10호
    • /
    • pp.1-9
    • /
    • 2007
  • Allocation and management of the resource is very important in wireless networks because the wireless resource is limited. Therefore, the importance of designing cross layer, which adapt between different layers, is on the rise. In this paper, we investigate the scheduling techniques of the cross layer. This paper researches conventional scheduling methods and proposes the complementary scheduling method. On multimedia environment, the scheduling method must be applied variably because of offering variable services. Therefore, this paper proposes the new scheduling method according to the variable services. The proposed method shows that utility efficiency of the wireless resource more excellent than the conventional method through the simulations.

A Study on Method for solving Fuzzy Environment-based Job Shop Scheduling Problems (퍼지 환경을 고려한 Job Shop에서의 일정계획 방법에 관한 연구)

  • 홍성일;남현우;박병주
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • 제20권41호
    • /
    • pp.231-242
    • /
    • 1997
  • This paper describe an approximation method for solving the minimum makespan problem of job shop scheduling with fuzzy processing time. We consider the multi-part production scheduling problem in a job shop scheduling. The job shop scheduling problem is a complex system and a NP-hard problem. The problem is more complex if the processing time is imprecision. The Fuzzy set theory can be useful in modeling and solving scheduling problems with uncertain processing times. Lee-Li fuzzy number comparison method will be used to compare processing times that evaluated under fuzziness. This study propose heuristic algorithm solving the job shop scheduling problem under fuzzy environment. In This study the proposed algorithm is designed to treat opinions of experts, also can be used to solve a job shop environment under the existence of alternate operations. On the basis of the proposed method, an example is presented.

  • PDF

APPLYING A STOCHASTIC LINEAR SCHEDULING METHOD TO PIPELINE CONSTRUCTION

  • Fitria H. Rachmat;Lingguang Song;Sang-Hoon Lee
    • International conference on construction engineering and project management
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.907-913
    • /
    • 2009
  • Pipeline construction is a highly repetitive and resource-intensive process that is exposed to various constraints and uncertainties in the working environment. Effective look-ahead scheduling based on the most recent project performance data can greatly improve project execution and control. This study enhances the traditional linear scheduling method with stochastic simulation to incorporate activity performance uncertainty in look-ahead scheduling. To facilitate the use of this stochastic method, a computer program, Stochastic Linear Scheduling Method (SLSM), was designed and implemented. Accurate look-ahead scheduling can help schedulers to better anticipate problem areas and formulate new plans to improve overall project performance.

  • PDF

Task-Technology Fit in Construction Scheduling

  • Yang, Juneseok;Arditi, David
    • International conference on construction engineering and project management
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.117-121
    • /
    • 2015
  • Construction managers use scheduling methods to improve the outcome of their project. Despite the many obvious advantages of the critical path method (CPM), its use in construction has been limited. Understanding the reasons why CPM is not used as extensively as expected could improve its level of acceptance in the construction industry. The link between construction scheduling methods and the tasks expected to be performed by schedulers has been an on-going concern in the construction industry. This study proposes a task-technology fit model to understand why CPM is not used as extensively as expected in construction scheduling. A task-technology fit model that aims to measure the extent to which a construction scheduling method functionally matches the tasks expected to be performed by the scheduling staff. The model that is proposed is an answer to the lack of proper instruments for evaluating the extent to which scheduling methods are used in the industry.

  • PDF

Staffing-Technology Fit in Construction Scheduling

  • Yang, Juneseok;Arditi, David
    • International conference on construction engineering and project management
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.631-635
    • /
    • 2015
  • Construction managers use scheduling methods to improve the outcome of their project. In spite of the many obvious advantages of the critical path method (CPM), its use in construction has been limited. Understanding the reasons why CPM is not used as extensively as expected could improve its level of acceptance in the construction industry. The link between construction scheduling methods and the capabilities of the scheduling staff has been an on-going concern in the construction industry. This study proposes a staffing-technology fit model to understand why CPM is not used as extensively as expected in construction scheduling. A staffing-technology fit model that aims to measure the extent to which a construction scheduling method matches the staff's experience, know-how and capabilities. The model that is proposed is an answer to the lack of proper instruments for evaluating the extent to which scheduling methods are used in the industry.

  • PDF

Based on the Demand, A Scheduling Method for the Seoul-Busan High Speed Rail (수요기반의 경부고속철도 열차운행계획 수립기법에 관한 연구)

  • Park, Jin-Yong;Chang, Justin S.
    • Proceedings of the KSR Conference
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.380-388
    • /
    • 2010
  • This paper explored an effective scheduling method for the Seoul-Busan High Speed Rail. It is important to decide train frequency influencing on scheduling method. Main factors to decide train frequency are location of station, social economic index, land use of station area and travel demand. In this paper, we focused on travel demand which is critical factor to decide train frequency. And we studied on standardized scheduling method. Simulation method is used to analyze the performance of explored method.

  • PDF

Opportunistic Packet Scheduling Method Considering QoS Requirement in MMR (MMR에서 QoS를 고려한 기회적 패킷 스케줄링 방법)

  • Lee, Kang-Won;Kook, Kwang-Ho;Oh, Dong-Ik
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • 제34권3A호
    • /
    • pp.244-257
    • /
    • 2009
  • We analysed the opportunistic scheduling method in MMR proposed by Samsung Electronic Cooperation and confirmed the efficiency by simulation. We also investigated the relationship between the throughput and fairness under the proposed method. The main objective of this study is to propose an opportunistic packet scheduling method in MMR, which considers the QoS requirement of user. Using the simulation the performance of the proposed method is compared with those of i) pure opportunistic packet scheduling method which doesn't consider QoS requirement and ii) packet scheduling method which only consider the QoS requirement, but does not utilize opportunistic packet scheduling.

A Bottleneck-Based Production Scheduling under Fuzzy Environment (퍼지 환경하에서 품질수준 확보를 위한 일정계획에 관한 연구 -Bottleneck을 고려한 생산라인에서-)

  • Lee, Sang Wan;Shin, Dae Hyuk
    • Journal of Korean Society for Quality Management
    • /
    • 제23권3호
    • /
    • pp.156-166
    • /
    • 1995
  • Job shop scheduling problem is a complex system and an NP-hard problem. Thus it is natural to look for heuristic method. We consider the multi-part production scheduling problem for quality level in a job shop scheduling under the existence of alternative routings. The problem is more complex if the processing time is imprecision. It requires suitable method to deal with imprecision. Fuzzy set theory can be useful in modeling and solving scheduling problems with uncertain processing times. Li-Lee fuzzy number comparison method will be used to compare processing times that evaluated under fuzziness. This study presents heuristic method for quality level in bottleneck-based job shop scheduling under fuzzy environment. On the basis of the proposed method, an example is presented.

  • PDF

Mixed Task Scheduling Using Synthetic Utilization (합성 이용율을 이용한 혼합 태스크 스케줄링)

  • Moon, Seok-Hwan;Kim, In-Guk
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • 제14권10호
    • /
    • pp.2277-2282
    • /
    • 2010
  • O(1) time synthetic utilization is not considered periodic tasks, except scheduling methods for aperiodic tasks where one of the aperiodic tasks is a scheduling method. But really aperiodic tasks scheduling method is composed of mixed task types. Aperiodic task scheduling method guarantee an analysis of the schedualibility of aperiodic task. The set of mixed tasks periodic and aperiodic tasks scheduling method uses synthetic utilization that is presented in this paper. The new method shows that schedulability increases 20% aperiodic server method.