• Title/Summary/Keyword: schedule planning

Search Result 364, Processing Time 0.027 seconds

A Study on the Secure Coding for Security Improvement of Delphi XE2 DataSnap Server (델파이 XE2 DataSnap 서버의 보안성 개선을 위한 시큐어 코딩에 관한 연구)

  • Jung, Myoung-Gyu;Park, Man-Gon
    • Journal of Korea Multimedia Society
    • /
    • v.17 no.6
    • /
    • pp.706-715
    • /
    • 2014
  • It is used to lead to serious structural vulnerability of the system security of security-critical system when we have quickly developed software system according to urgent release schedule without appropriate security planning, management, and assurance processes. The Data Set and Provider of DataSnap, which is a middleware of Delphi XE2 of the Embarcadero Technologies Co., certainly help to develop an easy and fast-paced procedure, but it is difficult to apply security program and vulnerable to control software system security when the connection structure Database-DataSnap server-SQL Connection-SQL Data set-Provider is applied. This is due to that all kinds of information of Provider are exposed on the moment when DataSnap Server Port is sure to malicious attackers. This exposure becomes a window capable of running SQL Command. Thus, it should not be used Data Set and Provider in the DataSnap Server in consideration of all aspects of security management. In this paper, we study on the verification of the security vulnerabilities for Client and Server DataSnap in Dlephi XE2, and we propose a secure coding method to improve security vulnerability in the DataSnap server system.

A Study on the Technical Development for the Exterior Wall System of Container House (컨테이너 하우스 외벽 구성 시스템 기술개발연구)

  • 김환식;백기영
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.2 no.2
    • /
    • pp.57-63
    • /
    • 2001
  • This paper aims at searching the attentiveness and method in planning. design and construction procedure of the container house system where container is used as core framework. For this. we try to produce researching fundamental materials for the construction performance and design standards of steel house, and finish the sample exterior wall system of the container house. By applying this sample system to the two case study of container housing construction we find out that there are considerable efnciency of the cost saving and catch up schedule compared with existing brick housing construction system. This study is significant in that it shows future direction of technical development and investment on the prefabricate housing market through development of the prefabricated container housing system.

  • PDF

A Study on Improvement of a Production System in Small and Medium Sized Shoes Companies using Simulation (시뮬레이션을 이용한 중소 신발생산기업의 생산시스템 개선방안 연구)

  • Lee, Kyung-Keun;Yun, Won-Young;Moon, Il-Kyeong;Cho, Hyung-Soo;Cha, Byung-Chul
    • IE interfaces
    • /
    • v.18 no.1
    • /
    • pp.35-43
    • /
    • 2005
  • A production system in domestic shoes companies has difficulty in achieving automation and information because of insufficiency of flexibility and standardization. Particularly small and medium sized shoes companies producing by OEM have tendency to chase the given production schedule blindly without considering major factors that may affect the production. Therefore, the production schedules or the process conditions can not be optimally set and are extemporized by the experience in the past. These behaviors cause low productivity and financial loss. To maximize efficiency and productivity of the shoe-making process, we develop a simulation model based on a production system in small and medium sized shoes companies. The model has been developed using ARENA which has been demonstrated to be a powerful tool to simulate various manufacturing systems. Using the simulation model, we find out several problems for the production process, and then suggest several alternatives to improve the system.

An Integer Programming Model and Heuristic Algorithm to Minimize Setups in Product Mix (원료의 선택 및 혼합비율의 변경 횟수를 최소화하기 위한 정수계획법 모형 및 근사해 발견 기법(응용 부문))

  • Han, Jung-Hee;Lee, Young-Ho;Kim, Seong-In;Shim, Bo-Kyung
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.11a
    • /
    • pp.127-133
    • /
    • 2006
  • Minimizing the total number of setup changes of a machine increases the throughput and improves the stability of a production process, and as a result enhances the product quality. In this context, we consider a new product-mix problem that minimizes the total number of setup changes while producing the required quantities of a product over a given planning horizon. For this problem, we develop a mixed integer programming model. Also, we develop an efficient heuristic algorithm to find a feasible solution of good quality within reasonable time bounds. Computational results show that the developed heuristic algorithm finds a feasible solution as good as the optimal solution in most test problems. Also, we developed a web based scheduling and monitoring system for a zinc alloy production process using the developed heuristic algorithm. By using this system, we could find a monthly zinc alloy production schedule that significantly reduces the total number of setup changes.

  • PDF

An Estimating Method for Software Testing Manpower (소프트웨어 시험 인력의 추정 방법)

  • Park Ju-Seok
    • The KIPS Transactions:PartD
    • /
    • v.11D no.7 s.96
    • /
    • pp.1491-1498
    • /
    • 2004
  • Successful project planning relics on a good estimation of the manpower required to complete a project, together with the schedule options that may be available. Despite the extensive research done developing new and better models, existing software manpower estimation models are present only the total manpower or instantaneous manpower distribution according to the testing time for the software life-cycle. This paper suggests the manpower estimating models for software testing phase as well as testing process and debugging process in accordance with de-tected faults. This paper presents the polynomial model for effort based on testing and debugging faults. These models are verified by 5 different software project data sets with coefficient of determination and mean magnitude of relative error for adaptability of model.

An Analysis of Problems and the Current Status of Renewable Energy System in Buildings (건축물 신재생에너지원의 이용 현황 및 문제점 분석)

  • Jang, Hyang-In;Seong, Yoon-Bok;Cho, Young-Hum;Kim, Yong-Shik;Jo, Jae-Hun
    • Journal of the Korean Solar Energy Society
    • /
    • v.32 no.5
    • /
    • pp.75-82
    • /
    • 2012
  • This study aims to investigate the usage of the renewable energy systems installed in buildings and make suggestions for the effective management. In this regard, a questionnaire survey was conducted on 1)design and construction, 2) operation and management, 3) user satisfaction and improvements about the renewable energy systems in buildings. Findings from this study can be summarized as follows; a lack of the basic information about systems, non-use of energy management systems, the differences in the features by energy source, and a lack of expertise of managers. The requirements to resolved these problems include the integrated management of various electric heat sources including a renewable energy source, an operation schedule based on the prediction of production and consumption, and so on. Furthermore the necessity of multiplex energy sources management system was confirmed and the basic data needed to establish the targets of this system were obtained.

Implementation of Highly Integrated Total Energy System (전력수급 종합시스템 현장적용)

  • Park, Si-Woo;Yoon, Yong-Beum;Nam, Jae-Hyun;Choo, Jin-Boo;Choi, Bong-Soo;Lee, Hyo-Sang;Kim, Joon-Hwan;Lyu, Sung-Ho;Han, Seung-Goo;Baek, Woong-Gi
    • Proceedings of the KIEE Conference
    • /
    • 1999.07c
    • /
    • pp.1525-1525
    • /
    • 1999
  • The main purpose of HITES(Highly Integrated Total Energy System) is to build and develop an integrated energy system for power system operational planning and analysis which consists of load forecast, economic generation schedule, stability analysis and relational database system. The HITES can be utilized to supply a stable electric power and operate KEPCO's power system facilities economically. This system was put into operation in 1999. This paper describes the main feature of the HITES, main functions, numerical methods adopted in this system and network configuration.

  • PDF

Study on ISA's assessment to software process for EN50128 SIL4 (EN50128 SIL4 소프트웨어 프로세스 ISA 인증 사례 연구)

  • Cho, Chi-Hwan;Kang, Chan-Yong;Hwang, Jin-Ho
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.838-849
    • /
    • 2010
  • It is inevitable to control the systematic failure to obtain the software safety integrity of embedded software installed in rolling stock. Because it is not possible to assess systematic failure integrity by quantitative methods, SILs are used to group documentation, methods, tools and techniques throughout software development lifecycle which, when used effectively, are considered to provide an appropriate level of confidence in the realization of a system to a stated integrity level. Normally, safety approval process is through generic product, generic application and specification application for. For safety approval on generic application of software based system, it is required to apply the certified software processes from the planning stage for the assigned SIL. As such, we will develop project specific application with high safety integrity within time limit of contractual delivery schedule through software assessment to the modified area with the re-use of certified software module and documentation. At this point, Hyundai Rotem has developed software processes applicable to support SIL 4 based on EN50128 which was assessed and certified by TUV SUD. This paper introduces the Hyundai Rotem's detailed approach and prospective action to achieve software safety integrity level.

  • PDF

Generator's Maintenance Scheduling to Improve Supply Reliability (공급신뢰도 개선을 위한 발전기 보수계획)

  • 차준민
    • Journal of Energy Engineering
    • /
    • v.7 no.1
    • /
    • pp.89-95
    • /
    • 1998
  • Maintenance scheduling of generators plays an important role in evaluating supply reliability of power systems. Since generators must be maintained and inspected, the generation planner must schedule planned outages during the year. Several factors entering into this scheduling analysis include: seasonal load-demand profile, amount of maintenance, size of the units, elapsed time from last maintenance, and availability of maintenance crew. This paper proposes a new maintenance scheduling algorithm for the alternatives of long-term generation expansion planning by using LOLP levelization method which is known as an effective method for the generator's maintenance scheduling. To get the best supply reliability of power systems, we change the maintenance period to levelize the reliability over all period. The proposed algorithm is applied to a real size power system and the better reliability results are obtained.

  • PDF

Impacts of Wind Power Integration on Generation Dispatch in Power Systems

  • Lyu, Jae-Kun;Heo, Jae-Haeng;Kim, Mun-Kyeom;Park, Jong-Keun
    • Journal of Electrical Engineering and Technology
    • /
    • v.8 no.3
    • /
    • pp.453-463
    • /
    • 2013
  • The probabilistic nature of renewable energy, especially wind energy, increases the needs for new forms of planning and operating with electrical power. This paper presents a novel approach for determining the short-term generation schedule for optimal operations of wind energy-integrated power systems. The proposed probabilistic security-constrained optimal power flow (P-SCOPF) considers dispatch, network, and security constraints in pre- and post-contingency states. The method considers two sources of uncertainty: power demand and wind speed. The power demand is assumed to follow a normal distribution, while the correlated wind speed is modeled by the Weibull distribution. A Monte Carlo simulation is used to choose input variables of power demand and wind speed from their probability distribution functions. Then, P-SCOPF can be applied to the input variables. This approach was tested on a modified IEEE 30-bus system with two wind farms. The results show that the proposed approach provides information on power system economics, security, and environmental parameters to enable better decision-making by system operators.