• Title/Summary/Keyword: schedule planning

Search Result 363, Processing Time 0.029 seconds

Development of Project Management Process for Product Development (제품개발 프로젝트관리 프로세스 개발)

  • Min, Taek-Kee
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.33 no.3
    • /
    • pp.93-101
    • /
    • 2010
  • Regarding project management, many organizations have developed and distributed general project management knowledge systems, and application fields use the knowledge systems to apply the process suitable for characteristics of a project. This study suggests project management process models to apply to product development projects and introduces the application cases. This product development project management process model is composed of five top processes of initiation and preparation, planning, implementation management, control, and termination and transfer. The five processes are re-divided into 18 bottom processes. These processes are expressed as input, control, output, and mechanism by using the IDEF0 model. This model is applied to the new car development project of a Korean automobile company and introduces the cases, which shows a project charter, a work breakdown structure, a project schedule, a progress s-curve, a risk register, and a performance report.

A Study on Measuring the Labor Intensity of Menus according to Various Cooking Types (조리유형별 메뉴의 노동강도 측정에 관한 연구)

  • 백승희;양일선;김효정
    • Korean journal of food and cookery science
    • /
    • v.20 no.4
    • /
    • pp.335-341
    • /
    • 2004
  • The purpose of this study was to measure the labor intensity of menus according to various cooking types. Through a literature review and in-depth interview, the attributes that affected the labor intensity were identified as the level of skill, amount of effort, degree of tiredness, time consumed, and machine usage. A survey was conducted in April, 2001 among cooks who Dew the entire process of cooking. There was a strong positive correlation between labor intensity and labor intensity attributes. Through regression analysis, a regression equation was obtained between labor intensity and labor intensity attributes. The labor intensity index calculated from this study showed the extent of labor intensity of menus. The result of this study could be used as basic data for foodservice manager to establish a menu planning and work schedule based on a scientific method.

Stochastic FMECA Assessment for Optimal RCM of Combustion-Turbine Generating Unit (복합화력발전기의 신뢰도 기반 유지보수를 위한 확률론적 FMECA 평가)

  • Joo, Jae-Myung;Lee, Seung-Hyuk;Shin, Jun-Seok;Kim, Jin-O
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.56 no.2
    • /
    • pp.254-259
    • /
    • 2007
  • PM(Preventive Maintenance) can avail the generating unit to reduce cost and gain more profit in a competitive supply-side power market. So, it is necessary to perform reliability analysis on the power systems in which reliability is essential. Thus, to schedule optimal PM planning based on reliability that is defined RCM(Reliability-Centered Maintenance), FMECA(Failure Mode Effects and Criticality Analysis) assessment is very important. Therefore, in this paper, the procedure of FMECA assessment for optimal RCM is proposed by probabilistic approach using real historical failure data of combustion-turbine generators in Korean power systems. The stochastic FMECA is performed based on the effects of probable failure modes of combustion-turbine generating unit.

Development of Computing Model for the Process and Operation Interval of Reinforced Concrete Work using Web-CYCLONE (철근콘크리트 골조공사의 프로세스 및 공정 공백 산출 시뮬레이션 모형 개발)

  • Park, Sang-Min;Son, Chang-Baek;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.341-343
    • /
    • 2012
  • This study introduces a method for computation of process and operation gap in the specific construction operation(i.e., RC frame construction applying a block-grouping scheme) using CYCLONE-based simulation modeling and analysis technique. Since uncertainty of construction environment exists, a thoughtful production planning is required to effectively deal with a risk resulting in schedule delay in advance. This study presents the concepts of a time delay occurred in a process level and operation level in a operation model, and a method of measuring gap-times in each level while the simulation progresses. It helps a site manager to decide how many segmentation in a construction block is suitable for eliminating unproductive time-delays under the constrained resources (e.g., laborer, equipment). A case study presents a network model representing a three segmented RC frame work, and result obtained from the simulation experiment.

  • PDF

A Detailed Design for DBR Based APS System (DBR 기반의 APS 시스템 상세 설계)

  • Choi, Jeong-Gil;Kim, Su-Jin;Ju, Jeong-Min;Chung, Sun-Wha;Chung, Nam-Kee
    • IE interfaces
    • /
    • v.14 no.4
    • /
    • pp.348-355
    • /
    • 2001
  • This paper suggests a detailed design of APS(Advanced Planning & Scheduling) system using the DBR (Drum-Buffer-Rope) which is a finite capacity scheduling logic of TOC(Theory of Constraints). Our design is composed of four modules; Network, Buffer, Drum and Subordination. The Network module defines the Product Network which is built from BOM and routings. The Buffer module inserts the Buffers into the Product Network. The Drum module describes detail procedures to create Drum Schedule on the CCR(Capacity Constraint Resource). The Subordination module synchronizes all non-constraints to the constraints by determining the length of Rope. This design documented by ARIS.

  • PDF

An Application of the Markov Process to the Management of Hospital Admissions

  • Choo, Hwi-Suck
    • Journal of the Korean Statistical Society
    • /
    • v.4 no.1
    • /
    • pp.79-87
    • /
    • 1975
  • However, the mechanism for producing revised estimate is the principal means of varying the resulting precisions of estimate. Therefore, a scheduling system including physician's revision should be checked by a computer simulation to evaluate possible gains to admissions scheduling accruing from the use of these estimates. The ability to accurately predict bed occupancy has long been an objective of hospital management. If the one were able to anticipate bed accupancy, then the one could more accurately plan for bed needs, schedule personnel, allocate service and supply. We may conclude that even though the Markov chain analysis would not lead to ready-made answers for the scheduling system of elective patients, it can provide the more detailed and systematic knowledgy for the solutions on the weekly base as well as the foundations for long run planning in relative sense.

  • PDF

A Qualitative Study on Dual-earner Couples' Work-life Balance (맞벌이 가정, 삶의 경로와 조정방식에 대한 질적 연구)

  • Kim, Seonmi
    • Journal of Family Resource Management and Policy Review
    • /
    • v.17 no.2
    • /
    • pp.219-241
    • /
    • 2013
  • The study explored the work-life balance of three dual-earning couples using the household economics approach according to the hermeneutics paradigm. Three families were analysed. The couples were interviewed individually with a non-structural interview guide about their work history and life history, and with a semi-structured interview and structured questionnaire about their work hours, childcare practice, husband-wife relation, household income and expenditure, and daily and weekly schedule. The results revealed the different paths and various strategies to adjust work-life balance among the cases. Strategies were discussed to facilitate changes in labor market policy, childcare policy, working place culture and family's daily life planning.

  • PDF

A Heuristic Approach to Disassembly Scheduling with Assembly Product Structure (조립구조 형태 제품의 분해 일정계획 문제에 대한 발견적 기법)

  • Lee Dong-Ho;Xirouchakis Paul
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2002.05a
    • /
    • pp.686-692
    • /
    • 2002
  • Disassembly scheduling is the problem of determining the ordering and disassembly schedules of used products while satisfying the demand of their parts of components over a certain planning horizon. The objective is to minimize the sum of purchase, setup, disassembly operation and inventory holding costs. This paper considers products with assembly structure, i.e. products without parts commonality, and suggests a heuristic in which an initial solution is obtained in the form of the minimal latest disassembly schedule, and then improved considering trade-offs among different cost factors. To show the performance of the heuristic suggested in this paper, computational experiments were done on the modified existing examples and the results show that the heuristic can give optimal of very near optimal solutions within very short computation times.

  • PDF

Quasi Assignment Algorithms in Job Shops

  • Byeon Eui-Seok;Lee Jang-Yong
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2002.05a
    • /
    • pp.704-708
    • /
    • 2002
  • Production scheduling has been one of the most critical issues in a manufacturing environment Job-shop scheduling problems(JSP) are well know from the standpoint of production planning and operations control in this research scheduling against due date is a measure of performance and the objective is minimizing total weighted tardiness This paper presents an idea of decomposition of the problem and shows robustmess of the schedule under various disturbances along with exact and approximation methods. The proposed method can indeed handle shop disturbances more effectively when compared with traditional and dynamic scheduling methods.

  • PDF

A Study on 4D CAD and GIS Integrated System for Process Risk Management Model (4D CAD와 GIS의 통합시스템을 통한 프로젝트 단계별 리스크관리 모델에 관한 연구)

  • Jeon, Seung-Ho;Yun, Seok-Heon;Paek, Joon-Hong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.3
    • /
    • pp.91-98
    • /
    • 2007
  • Recently a construction industry introduces information that brings about many advantages in the early planning phase, design phase and construction phase. Especially it replaces 2D, 3D systems(usually using explanation of drawing information) ai 4D CAD(offering a sort of 4D-having relation of construction schedule and 3D drawing information). Nevertheless a 4D has these benefits, it has limits which are not only usually using 3D modeling but also limit of making full use of practical affairs because of a lack of connecting varietals of progress of work. To solve these uppermost limits, this research is presenting unified systems to use in risk management which are efficient management of space and non-space information, space analysis, making full use of data base, introducing GIS system of easy interaction.