A BLOG BASED RISK MANAGEMENT SYSTEM USING SOFT SCHEDULE

  • Soo-Myeong Jin;You-Sang Yoon;Myung-Houn Jang;Sang-Wook Suh
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1334-1339
    • /
    • 2009
  • To achieve the best performance of a project, uncertainties involved in the building construction process need to be identified in the planning phase of the project. Uncertainties seldom create a positive impact on construction project, but they almost cause delay and increase costs. Therefore, risk management plays a significant role in construction to minimize risk occurred due to uncertainties of a project. Although the importance of the risk management has been known to the construction industry, it is not enough to be developed to meet the demands of the industry. It has not been enough for Systems to control schedule risks for managers in the field. Therefore, a tool is necessary to efficiently control risks. The propose of this study is to invent Schedule Risk Control System Module to prepare for risks in preconstruction phase.

  • PDF

AN EXAMPLE OF REPRESENTING THREE LEVEL'S SCHEDULES WITHIN SCHEDULE HIERARCHY BY BDM TECHNIQUE

  • Seon-Gyoo Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.445-452
    • /
    • 2011
  • The schedule hierarchy in construction project is generally composed of three levels. The highest level is a milestone schedule and represented by Bar Chart format. The middle level is an integrated project schedule (IPS) and represented by CPM (Critical Path Method) format. The lowest level is a detail working schedule and usually represented by Bar Chart. The traditional scheduling techniques such as ADM (Arrow Diagramming Method) or PDM (Precedence Diagramming Method) cannot represent all kinds of schedule within schedule hierarchy as identical schedule format. However, the BDM (Beeline Diagramming Method) technique can represent all kinds of schedule within schedule hierarchy as identical CPM format. This paper describes the basic concept, principle, interpretation methods, and schedule computation methods of the BDM as a new networking technique that can represent all kinds of overlapping relationships between activities, and then presents an example of representing three level's schedules within schedule hierarchy by the BDM technique.

  • PDF

On Establishing a New Fee Schedule for General Surgical Procedure Using Fuzzy MCDM

  • Hung, Chih-Young;Huang, Yuan-Huei;Chang, Pei-Yeh;Wang, Kuei-Ing;Chang, King-Jen;Liu, Yi-Hsin
    • Industrial Engineering and Management Systems
    • /
    • 제4권2호
    • /
    • pp.218-227
    • /
    • 2005
  • In this research a model for establishing a new, rational fee schedule for general surgical procedures in a national health insurance program is developed. A fuzzy multiple criteria decision-making (FMCDM) model is proposed. The relative values of eleven surgical procedures were obtained through an empirical study based on the FMCDM model. Consequently, a new fee schedule obtained from the FMCDM model. This new fee schedule is more convincing than previous schedule and more persuasive to the references for the policy setting.

IPA 방법을 활용한 국내 건설 산업 공정관리 역량 평가 (Evaluating Schedule Management Capability in Korean Construction Industry through Importance-Performance Analysis)

  • 이진강;송보현;김다인;최재현
    • 한국건축시공학회지
    • /
    • 제24권1호
    • /
    • pp.145-156
    • /
    • 2024
  • 건설 프로젝트의 규모와 복잡성이 커지는 가운데, 체계적이고 통합적인 공정관리의 실행은 국내 건설 산업의 도전과제로 남아있다. 이러한 배경에서 본 연구는 먼저 종합적인 관점에서 공정관리 역량을 제도 및 규정, 발주자 요구사항, 전문 인력 및 조직, 공정관리 관련 업무, 스마트건설 기술 활용 5개 분야로 정의하였다. 그리고 국내 건설 산업 종사자를 대상으로 각 분야별 공정관리 역량 요소별로 중요성과 현재수준을 평가하는 설문을 진행하고 IPA분석을 실시하여 국내 건설 산업의 공정관리 역량을 분석하였다. 이를 통해 공정관리 역량을 구성하는 다양한 요소를 대상으로 중요성을 인식되고 있지만, 현재 수준과의 격차가 존재함을 밝혀, 개선이 필요한 영역을 제시하였다. 특히 개선이 필요한 영역으로는 발주처의 공정 관리를 위한 예산 확보, 공사 기간의 적정성 산전 및 평가기준 수립, 현장 공정 관리 인력의 배치, 공정 관리 소프트웨어에 대한 투자 등이 꼽혔다. 이와 같이 본 연구는 국내 건설 산업의 공정 관리 역량에 대한 자세한 시각과 개선방향을 제시하였으며, 이는 공정관리 실무적용을 활성화하는데 도움이 될 것으로 기대된다.

한국과 미국의 기술료에 대한 상대가치 비교 (Comparison of Relative Value on Physician Payment Schedule for reimbursement of health insurance between Korea and U.S.A.)

  • 김한중;조우현;손명세;박은철
    • 보건행정학회지
    • /
    • 제2권1호
    • /
    • pp.1-16
    • /
    • 1992
  • This study compares the physician payment of national fee schedule for Korean Medical Insurance with that of the United States based on Resource Based Relative Value Scales (RBRVS) which Hsiao developed in 1988 for the Medicare reimbursement. Through the comparison of two fees schedules, this study is purposed to evaluate the appropriateness of relative values which assigned to each physician services of Korean fee schedule. A total of 264 physician services are selected for the comparison. The ratio of Korean schedule to RBRVS is selected as an index of appropriateness. It the score of index shows large variation among services, the relative value of Korean fee schedule is inappropriate with U.S. RBRVS which was developed recently. The Ratios of Korean schedule to RBRVS are widly variated ; the range of those is 8.1 to 379.3. In subgroups which are regrouped to controll systematic differences between two national fee schedules, these ratios are also variated. Services which are relatively less compensated are management/evaluation services, while services which are relatively more compensated are invasive and imaging services. By the way, the service classification of Korean fee schedule is unclear, specially in management/evalutaion services. Therefore, Korean Medical Insurance fee schedule should be modified to be more balanced and rational.

  • PDF

공정관리와 리스크관리의 통합을 위한 기초연구 (A Study on Integration of Schedule Management and Risk Management)

  • 장명훈;윤유상;서상욱
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.105-110
    • /
    • 2006
  • 건설공사에서 발생하는 리스크는 시공단계에 많이 발생하므로 공정관리와 통합하여 관리할 수 있다면 효율적일 것이다. 본 연구에서는 공정관리 프로그램을 이용하여 공정리스크를 통합관리하는 방법을 제안하고 있다. 제안된 방법은 사용자 프로그래밍(Visual Basic Application)이 가능한 Microsoft Project에서 구현되었으며, 공사관리자가 공정표를 작성하고 일정관리를 수행하는 과정에서 리스크를 예측하는데 도움을 줄 수 있을 것이다.

  • PDF

A Discount Price Schedule Based on Supplier's Profit Function

  • Kim, Kap-Hwan
    • 한국경영과학회지
    • /
    • 제17권1호
    • /
    • pp.113-126
    • /
    • 1992
  • It is discussed how a supplier should design a quantity discount pricing schedule for multiple buyers. It is emphasized that nor only the supplier's surplus but also each buyer's surplus resultant from quantity discount should be considered in designing price schedule. It is shown that if the supplier's quantity pricing schedule is based on his/her profit function, each buyer's surplus may be maximized. And it is also shown that when the supplier's main benefit comes from the reduced number of setups, the incremental discount schedule satisfies the requirement. Formulas to determine values of parameters of the incremental discount schedule are provided.

  • PDF

철골골조공사의 실시간 진도관리 시스템 구축에 관한 연구 (A Study on the Development of a Real-Time Schedule Progress Control System in Steel Structural Construction)

  • 김경훈;김경환;이윤선;김재준
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.886-891
    • /
    • 2007
  • 최근 공정관리를 위한 각종 기법들이 개발되고 있으며, 실질적인 시공프로세스를 구체적인 3차원 이미지로 형상화하여 보여줌으로써, 공정계획에 대한 추상적인 개념 모델을 구체적인 것으로 변환하여 발전시킬 수 있다. 하지만 이는 3D-CAD와 공정프로그램을 연계하여 사용하는 방식으로 사람이 정보를 옮겨주거나 입력을 해야 하는 번거로움이 수반된다. 본 연구에서는 3D-CAD 객체 정보 시스템 활용 및 공정자동생성 모듈을 활용하여 통합DB 구축을 통한 실시간 철골공사 공정관리 시스템 프로세스를 구축하였다. 본 연구는 IDEF0 모델을 이용하여 철골공정 관리 프로세스를 제시하였으며, RFID 시스템 설계를 통하여 실시간 진도관리 및 분석 프로세스를 제시하였다. 이를 통해 예상공정정보의 신속한 생성과 실시간으로 실제공정정보와의 비교 ${\cdot}$ 분석 및 시뮬레이션을 실현하고자 한다.

  • PDF

EVMS를 도입한 공정의 성과지수 분석 (Performance Index Analysis of Schedule Introducing EVMS)

  • 김영;이영대;김성환;김정기
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.456-459
    • /
    • 2002
  • 오늘날 건설공사의 효율화를 위한 EVMS(Earned Value Management System)도입의 중요성을 인식하고 많은 연구가 발표되고 있다. 그러나 EVMS를 도입한 공정에 대한 경험부족과 국내 건설의 제도적${\cdot}$환경적 요인으로 인해서, 기술적인 분석이나 사례분석에 대한 관한 연구는 아직 미흡한 실정이다. 본 연구에서는 EVMS를 도입한 공정상에 성과지수(SPI : Schedule Performance Index, CPI : Cost Performance Index)를 산정하여, 여러 통계적 분석방법을 적용해서 프로젝트 관리상에 일정, 비용상의 추세(Trend) 및 문제의 원인을 분석${\cdot}$연구하고자 한다.

  • PDF

공정관리와 연계한 건설 검측 업무 체계화 방안 (Integration of Construction Inspection to Schedule Management )

  • 송보현;정승환;이진강;최재현
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.161-162
    • /
    • 2023
  • The construction inspection is conducted by the contractor or construction supervisor after a certain stage of work has been completed. As the consturction inspection task is dependant on construction schedule, however, it is difficult to plan inspection task systematically, resulting in increased supervision costs, delays in construction, and disputes. Therefore, this study aims to integrate inspection work with schedule management to systematize inspection procedures. Firstly, the inspection work is defined based on the construction supervision checklist. Then its relationship with the construction process, required time, and resources for inspection tasks are defined in construction schedule. Lastly, a process management program is used to assess the effects of applying the inspection work and examine changes in the overall construction period and process management. The proposed method in this study can support to plan construction inspection more systematically and to improve the effectiveness of construction quality management.

  • PDF