• Title/Summary/Keyword: schedule delay

Search Result 220, Processing Time 0.028 seconds

A MAC Protocol Considering Traffic Loads Information For a Clustered Wireless Sensor Networks (클러스터 기반의 무선 센서 네트워크 환경에서 트래픽 부하 정보를 고려한 MAC 프로토콜)

  • Kim, Seong-Cheol;Kim, Hyung-Jue
    • Journal of the Korea Society of Computer and Information
    • /
    • v.14 no.3
    • /
    • pp.113-119
    • /
    • 2009
  • In this paper, we proposed an efficient TDMA scheduling algorithm for a clustered Wireless Sensor Network. Since some previous algorithms used unnecessary idle period and schedule period in each frame. It became an overhead that might consume unexpected energy and delay data transmission. To solve this problem, a dynamic scheduling algorithm according to the number of member nodes and node traffic load within a cluster was suggested. Our proposed DS-MAC(Dynamic Scheduling MAC) could save energy and reduce transmission delay Then DS-MAC was analyzed mathematically to compare with the previous algorithms.

A Study on a System of Resolving Claim according to the Delay of Construction Projects - Focus on Liquidated Damages - (공기지연에 따른 클레임 대응방안에 관한 연구 - 지체상금을 중심으로 -)

  • 이영민;이상범;김정길
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.111-116
    • /
    • 2002
  • The delay of the completion of the construction project occurs frequently because the origin schedule is affected by numerous factors that contribute to the overall delay in completing the project. But in our country. the dealing with a claim is not sufficient yet by reasons of fairl relation between owner and constructor, cognitive shortage in claim, and such. especially they have make a wrong application of baseless the rule. In this study. we make a rational model ; that includes calculating of dispute costs, and suggest the solution and the prevention for claim by considerating the law followed liquidated damages.

  • PDF

TACT Modification Methods for Responding to Delay in Winter Season (동절기 공정지연 대응을 위한 TACT 공정 조정방안)

  • Kim, Dae-Kyu;Jeong, Yong-Joon;Lee, Jun-Ho;Moon, Hyun-Seok;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.125-126
    • /
    • 2011
  • Construction projects are being more complicated in proportion to the economic development. Process management is a critical issue in the construction that decides success of a project. Especially, a TACT method which divides and manages resources to repeat each activity is more important. Although becoming an issue dealing with the delay at winter season, it is not property developed. This paper suggests 'activity priority method' and 'TACT unit method' through case study. We validate necessity and efficiency of the TACT method through simulations and a survey. We expect cost reduction by decreasing unnecessary spending.

  • PDF

On the Service Improvement of High-Density Urban Railway Transportation (고밀도 도시철도 운행품질 개선 방안 연구)

  • Kim, Dong-Hee
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.3
    • /
    • pp.163-168
    • /
    • 2010
  • Recently, there are many problems of service qualities such as regular-rapid-safe -comfortable transport, that was traditionally advantages in urban railway transportations. These problems cause train delays that affects consecutive schedule, capacity, operation plans, and it is hard to prevent the propagation of delay and find the recovery solution. Because the urban transport demands is continuously increased and the railway service is also expanded, the railway operation company makes efforts to improve operation performance and efficiency for passengers. In this paper, we analyse the issues and problems existing in the major operation line of high-density urban railways, and suggest the development direction of intelligent operation technology to improve the urban railway service by minimizing the occurrence and propagation of delay. And the result of numerical case study is also presented.

Experimental Study on the Estimation of Station Dwell Time for Metro Railways (도시철도 운행역에서의 정차시분 추정에 관한 실증연구)

  • Kim, Dong-Hee;Hong, Soon-Heum
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.673-678
    • /
    • 2008
  • In crushed service areas of Metro railway lines, there are problems such as the buildup discontent, the irregular operation time and rotation of rolling stocks, caused by frequently occurred train delay. Train delay is affected by operation conditions or infrastructure capacities such as train schedule, line capacity, car rotation plan, shunting movements at origin and destination, and also by transport demand characteristics. Furthermore, a delay produce another delays and spread over the following trains. So it is not easy to build up a protection and recovery plan. In this research, we conduct experimental analysis study based on the real metro data, and as a result, present the relation between the traffic demand and the dwell time. And finally, propose future research themes for improving the operation efficiency of metro railways.

  • PDF

Correlation Analysis between Delay and Turnaround Time at Jeju International Airport (제주국제공항의 지연과 Turnaround Time 간의 상관관계 분석)

  • Lee, Choongsub;Kim, Dongsin;Kim, Hyewook;Baik, Hojong
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.30 no.1
    • /
    • pp.1-11
    • /
    • 2022
  • The capacity of Jeju International Airport has reached its limit due to a surge in air traffic demand such as passengers and cargo and the continuous expansion of Low Cost Carriers (LCC). Despite COVID-19 that has began in November 2019, Jeju International Airport still has continuous demand in terms of passenger and cargo transportation. As a result, it is undeniable that the delay rate also unexpectedly increased as the air traffic volume at Jeju International Airport continued to increase. In this study, the correlation between Turnaround Time and delay rates of national airlines is analyzed based on past flight data at Jeju International Airport, and the cumulative delay time trend for sampled airlines is compared with Turnaround Time. Through this study, it is expected to contribute to securing aircraft operation efficiency and on-time by analyzing delays related to Turnaround Time at Jeju International Airport.

A Case Study on the Prevention of Construction Delays Using the Delay Management Index in Program Level Construction Projects (프로그램 수준 건설사업에서 지연관리지수(Delay Management Index)를 활용한 공사지연 예방 사례연구)

  • Yu, Jun-Hyeok;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.4
    • /
    • pp.347-359
    • /
    • 2021
  • Recently, construction projects have emerged in the form of program management, which is complicated by the large-scale of construction, and requires astronomical construction costs. In particular, projects that absolutely require management at the program level, such as large-scale construction projects, require overall control of the planned schedule and cost as a set of various projects, including infrastructure. But in Korea, there is no specific management standard for delays in construction. In order to avoid the risk of cost increase and project delay in the program-level construction project, it is necessary to apply more systematic management standards to prevent delay and to take a more preemptive response in the construction process. Therefore, in this study, a delay management index (DMI) was developed to successfully carry out large-scale construction projects at the program level and prevent delays in advance. In addition, case studies were conducted for large-scale construction projects, and a delay prevention system was established for program-level construction projects.

Barriers of Last Planner System: A Survey in Vietnam Construction Industry

  • Khanh, Ha Duy;Kim, Soo Yong
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.4
    • /
    • pp.5-11
    • /
    • 2013
  • Construction industry is overwhelmed by delay and often has suffered cost and time overrun. In this context, Last Planner System (LPS) has been considered as a very useful tool for the management of the construction process. Many previous studies have reported its effectiveness in construction performance. This study aims to evaluate the level of importance of the Last Planner processes in the Vietnam construction industry (VCI), and analyze the existing barriers when implementing these processes in construction management. These barriers were collected based on previous studies from International Group for Lean Construction (IGLC). A survey was carried out through questionnaire. The respondents are been experienced people in construction project management. There are four processes of LPS that were investigated including master schedule, phase schedule, lookahead plan, and weekly work plan. The results showed that master schedule is the most important item when performing a construction project in the VCI. The highest degree of agreement belongs to 'owner - contractor' pair with 77.1% importance indices; whereas the lowest belongs to 'consultants - contractors' pair with 63.8% importance indices. Eventually, three barrier factors were extracted from factor analysis technique with 62.2% of variance explained.

VLSI Architecture of a Recursive LMS Filter Based on a Cyclo-static Scheduler (Cyclo-static 스케줄러를 이용한 재귀형 LMS Filter의 VLSI 구조)

  • Kim, Hyeong-Kyo
    • Journal of the Institute of Convergence Signal Processing
    • /
    • v.8 no.1
    • /
    • pp.73-77
    • /
    • 2007
  • In this paper, we propose a VLSI architecture of an LMS filter based on a Cyclo-static scheduler for fast computation of LMS filteing algorithm which is widely used in adptive filtering area. This process is composed of two steps: scheduling and circuit synthesis. The scheduling step accepts a fully specified flow graph(FSFG) as an input, and generates an optimal Cyclo-static schedule in the sense of the sampling rate, the number of processors, and the input-output delay. Then the generated schedule is transformed so that the number of communication edges between the processors. The circuit synthesis part translates the modified schedule into a complete circuit diagram by performing resource allocations. The VLSI layout generation can be performed easily by an existing silicon compiler.

  • PDF

A Case Study on the R&D Programs of Fighter & Attacker Aircraft (군용항공기 연구개발 사업 사례분석)

  • Lee, Sung Eun;Kwon, Yong Soo
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.5 no.1
    • /
    • pp.7-20
    • /
    • 2009
  • This paper describes a case study on the R&D programs of fighter and attacker aircraft such as F-22A, F/A-18E/F, and T/A-50. F-22A and F/A-18E/F were developed in same age. The performance of each program was, however extremely different. F-22A program results in a lot of cost overrun and schedule delay. On the other hand F/A-18E/F program met the cost, schedule, and performance goals. In the T/A-50 program with a super-sonic advanced trainer, T-50 was also developed successfully on planned cost and time by Korea Air-force and KAI. This paper derives key elements for the success of the military aircraft R&D program through lessons learned from th e case study. Each program is analyzed in terms of its background, planning and management.

  • PDF