• Title/Summary/Keyword: safety requirement

Search Result 723, Processing Time 0.056 seconds

Confirmation System of Feasibility of Train Position Through Tachometer and Balise (타코미터와 발리스를 통한 열차 위치 타당성 확인 시스템)

  • Oh, Kwi-Jin;Lee, Jin-Haeng
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.472-475
    • /
    • 2009
  • Nowadays, Short headway is a requirement of Signaling System applied to subway and Light Rail Transit (LRT) being constructed in Korea. To satisfy this Systematic Requirement, the accuracy of train position information on the line is one of the main element to improve ATC system safety and performance. On-board ATC system performs feasibility of Train Position as comparing data from balise installed along the track with data from tachometer installed at both axles of train.

  • PDF

Analysis of Performance Requirement for Long-term Care Workers of Home Visit Care and Home Visit Bathing based on Korean Long-term Care Insurance System (방문요양.방문목욕 장기요양기관의 요양보호사 업무수행 요구도 분석)

  • Chang, Hyun-Sook
    • The Korean Journal of Health Service Management
    • /
    • v.5 no.3
    • /
    • pp.77-88
    • /
    • 2011
  • As same time of starting on the Korean Long-term Care Insurance System, the government developed a program to train new qualification of long-term care workers. The number of enrolled long-term care workers are 950,000 persons in 2010. Mostly they are working in home based care work places such as home visit care centers and home visit bathing centers covered insurance. The purpose of this study is to understand the difference of task performance requirement according to long-term care workers' responsibilities which divided into home visiting care and home visiting bathing. The comparison analysis was conducted to task performance requirement in basic management, safety management, administration management, practical services. Key result was found that task performance requirement of long-term care workers whose responsibilities are home visiting care were more higher than the home visiting bathing. Finally, To improve quality of home visiting care and home visiting bathing, it is necessary to provide the fields based continuing education and reflect new reimburse system.

A New Dynamic Reliability Assessment for Mid-loop Operations in a Nuclear Power Plant

  • Jae, Moosung
    • International Journal of Reliability and Applications
    • /
    • v.3 no.1
    • /
    • pp.25-35
    • /
    • 2002
  • This paper presents a dynamic reliability assessment methodology for use in the safety assessment of a complex system such as a nuclear power plant. The method is applied to a dynamic analysis of the potential accident sequences that may occur during mid-loop operation in a nuclear power plant. The idea behind this approach consists of both the use of the concept of the performance achievement/requirement correlation and of a dynamic event tree generation method. The assessment of the system reliability depends on the determination of both the required performance distribution and the achieved performance distribution. The quantified correlation between requirement and achievement represents a comparison between two competing variables. It is demonstrated that this method is easily applicable and flexible in that it can be applied to any kind of dynamic reliability problem.

  • PDF

A New Method for Assessing Dynamic Reliability for the Mid-loop Operation (원전의 부분충수운전에 대한 동적 신뢰도평가)

  • 제무성;박군철
    • Journal of the Korean Society of Safety
    • /
    • v.11 no.2
    • /
    • pp.52-59
    • /
    • 1996
  • This paper presents a new approach for assessing the dynamic reliability in a complex system such as a nuclear power plant. The method is applied to a dynamic analysis of the potential accident sequences which may occur during mid-loop operation. Mid-loop operation is defined as an operation to make RCS water level below the top of the flow area of the hot legs at the junction with the reactor vessel for repairs and maintenance of steam generators and reactor coolant pumps for a specific time. The Idea behind this approach consists of both the use of the concept of the performance achievement/requirement correlation and of a dynamic event tree generation method. The assessment of the system reliability depends on the determination of both the required performance distribution and the achieved performance distribution. The quantified correlation between requirement and achievement represents a comparison between two competing variables. It is demonstrated that this method is easily applicable and flexible in that it can be applied to any kind of dynamic reliability problem.

  • PDF

A study on the application of creative methods for Kano model (Kano 모델을 위한 창조성 기법적용에 관한 연구)

  • Kim, Hye-Mi;Kim, Tae-Young;Yoon, Sung-Pil;Cho, Tae-Yeon
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2008.11a
    • /
    • pp.491-503
    • /
    • 2008
  • As customer needs become diversified, there are many efforts to develop creative ideas on the products to satisfy the customer requirement. Also it is very important to classify the customer requirement to the product's quality. According to the previous study, the idea of the products by collecting opinions and brainstorming is mainly studied in new product development. To create the attractive quality for the product, Kano model has commonly been used. However, the brainstorming in the stage of create ideas has the problem of lower linkage between purpose and idea and lower quality of new idea. Therefore, the paper suggests a way to invent more creative ideas by comparing forced connection method to the brainstorming that is applied to the Kano model.

  • PDF

A Study on Electrical Safety Requirement of Fuel cell (태양광 발전설비 전기적 안전사항에 관한 연구)

  • Jung, Jin-Soo;Han, Woon-Ki;Song, Young-Sang;Lim, Hyun-Sung;Cho, Sung-Koo
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.1563-1564
    • /
    • 2015
  • 태양광 발전설비의 경우 입지선정이 다른 신재생에너지원에 비해 비교적 자유롭기 때문에 일반적으로 가장 많이 사용되고 있는 신재생에너지원이다. 그러나 전기 전문가 외에 일반인들도 많이 사용하기 때문에 설비 사고발생시 감전사고와 같은 재해유발가능성이 높다. 따라서 본 논문에서는 태양광 발전설비의 전기적 안전사항을 위해 어떤 규정들이 있는지 비교하여 태양광 발전설비를 안전하게 운영할 수 있는 방안에 대해 알아보고자 한다.

  • PDF

A Study on Electrical Safety Requirement of Fuel cell (연료전지 전기적 안전사항에 관한 연구)

  • Song, Young-Sang;Han, Woon-Ki;Jung, Jin-Soo;Lim, Hyun-Sung;Cho, Sung-Koo
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.1082-1083
    • /
    • 2015
  • 연료전지의 경우 신재생에너지원 중 기후 조건에 영향을 받지 않고 안정적으로 전력공급이 가능하다. 또한, 타 신재생에너지원에 비하여 입지선정이 비교적 자유롭고 작은 공간에 설치가 가능한 장점이 있다. 또한, 단독발전 효율이 47%의 고효율이기 때문에 운영시 경제적인 이점이 있다. 연료전지의 경우 이러한 장점이 있으나 수소를 사용한다는 점에서 위험하다는 인식과 설치비용이 비싸다는 점에서 보급화 진행이 늦춰지고 있는 실정이다. 이러한 시점에서 본 논문에서는 연료전지의 전기적 안전사항에 대하여 검토하고자 한다.

  • PDF

Hazard Analysis Process Based on STPA Using SysML (SysML을 이용한 STPA 기반의 위험원 분석 프로세스)

  • Choi, Na-yeon;Lee, Byong-gul
    • Journal of Internet Computing and Services
    • /
    • v.20 no.3
    • /
    • pp.1-11
    • /
    • 2019
  • Today's software systems are becoming larger and more complicated, and the risk of accidents and failures have also grown larger. Software failures and accidents in industrial fields such as automobiles, nuclear power plants, railroad industries, etc. may lead to severe damage of property and human life. The safety-related international standards, such as IEC 61508 have been established and applied to industries for decades. The safety life cycle specified in the standards emphasize the activities to develop safety requirements through hazard and risk analysis in the early stage of software development. In this paper, we propose 'Hazard Analysis Process based on STPA using SysML' in order to ensure the safety of software at the early stage of software development. The proposed hazard analysis can be effectively performed minimizing the loss of hazard by using the BDD and the IBD of SysML to define the control structure of a system. The proposed method also improves the specification of the safety constraints(requirement) by using SD. As a result, it is possible to identify the hazard without missing and identify the hazard scenarios in detail, and safety can be sufficiently ensured in the early stage of software development.