• Title/Summary/Keyword: safety management activities

Search Result 912, Processing Time 0.028 seconds

A Survey Study on Occupational Safety and Health Management Activities in Contractor and Supplier Companies of the Car Industry (자동차산업 모기업-협력업체의 산업안전보건 실태조사)

  • Ko, Won-Kyoung;Lee, Kwang-Gil;Gal, Won-Mo
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.2
    • /
    • pp.47-53
    • /
    • 2013
  • This study is aimed to investigate the occupational safety and health management of contractor company in the car industry. The questionnaire survey was conducted on the suppliers and contractors of car industry. Data were collected from 10 contractor companies and their 291 contractor companies(each outside and inside company). From the survey result, it was found that the level of all-round safety and health management is above the average. To strengthen the relationship for safety and health management, it is needed that the supplier company employ the person in exclusive charge to support contractor. Also it is needed the active support of the contractor company and needed that the supplier company employ the person in exclusive charge to support contractor. Finally, Many of the problems associated with the safety and health management by strengthening contractor company responsibility will have to be solved simultaneously.

A Study on the Role of Fire Fighting and Rescue Squad in terms of Fire Investigation (화재조사 측면에서의 화재진압 및 구조대원의 역할에 대한 연구)

  • Lee, Seung-Hun;Lee, Chang-U
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2012.04a
    • /
    • pp.461-470
    • /
    • 2012
  • Fire scene is mostly destroyed by the flames but fire fighter's fire suppression and rescue activities also destroys a substantail portion. Structures and furnitures which has already become weaken can be easily damaged. Or when structures built up by moving to another location, it's very hard to restore the original state. Also if it is restored, the object has no evidence that it has existed. In all scenes, the scene can't be preserved when quick extinguishment, rescue activities and preventation of fire spread is needed. On this paper, it reviewed the notes about the possibility of field damage by fire suppression and rescue squad's activities. Also it has reviewed the notes how to minimize the field damage by putting out fires and rescue activities by observing the precautions. The reviewed information will help to make guidelines for preserving the scene. By this, it is expected to make a field study exactly by collecting more valid evidence.

  • PDF

TRIZ-Used 6-Sigma Integrated Design ; TPM-Based Combination Activity Methodology (TRIZ를 활용한 6시그마 통합설계 ; TPM을 기반으로 한 병합활동방법론)

  • Kim, Hye-Jeong;Lee, In-Su;Park, Young-Taek;Cho, Jai-Rip
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2008.04a
    • /
    • pp.247-258
    • /
    • 2008
  • This paper purports to investigate the statistical basic principles through "TRIZ-used 6-sigma integrated activity design" and further, to raise "the importance of measuring technical innovative activities based on 6-sigma integrated design methodology by organization". This paper intends to investigate how the activities of the best conditions, which are necessary for the stage of 6-sigma design, are chosen in the TPM-based 6-sigma integration activities. And it will examine the options, when used together with other technique, in the probability statistical methodology. Through the combination of the situations which are chosen when activity techniques, which are mostly used for production and technology, and 6-sigma integration activities are used together, it intends to practically use as the basic data for company standards.

  • PDF

The Effect of Community Mapping Application Development and Application on the Safety Consciousness of Elementary and Middle Schools (커뮤니티맵핑 어플리케이션 개발과 활용이 초·중생의 안전의식 고취에 끼치는 영향)

  • Kwon, Jin-Suk;Lee, Hyo-Jeong;Shin, Eun-Hye;Park, So-Soon
    • Journal of the Society of Disaster Information
    • /
    • v.15 no.3
    • /
    • pp.323-338
    • /
    • 2019
  • Purpose: The purpose of this study is to propose an educational program for enhance safety capability of elementary and middle school students through community mapping application. Method: Developed and utilized a community mapping application that can be easily used for research. After participating in 425 elementary and middle school students, This study analyzed the change of safety competency through survey. Results: Through the community mapping activities, it was possible to derive the actual life surrounding risk factors of the earthy life, and it was found through the questionnaire before and after the activity that the safety competence of the participants improved. Conclusion: Investigation of similar related cases of Public Participant Safety Mapping Tool and analysis of their functionalities are conducted, and user demanded functionalities with improved usability accessability expandability are derived. Also, the system applied the test to elementary and middle school students and the survey showed that the safety capacity was improved according to Safety Mapping activities. This is proposed as a safety education program.

Analysis and improvement of weapon system software development and management manual based on functional safety standards (기능 안전 표준 기반의 무기체계 소프트웨어 개발 및 관리 매뉴얼 분석 및 개선 방안 연구)

  • Kim, Taehyoun;Bak, Daun;Paek, Ockhyun
    • Journal of Software Engineering Society
    • /
    • v.29 no.1
    • /
    • pp.7-12
    • /
    • 2020
  • As interest in functional safety has recently increased, application of functional safety standards has been required in various industrial fields. A functional safety standard is a document that defines functional safety-related activities required to prevent system malfunctions. All activities defined in this standard are required differentially according to the classification results calculated through the risk analysis and assessment of the system. In the field of domestic weapon systems, there is a manual for the development and management of weapon system software issued by the Defense Acquisition Program Administration (DAPA ). This manual requires static and dynamic analysis of software for functional safety related activities. However, the manual does not specifically address the classification activity through risk analysis and assessment as required for the preceding activities. Therefore, in this study, we analyze the problems of the manual based on the representative functional safety standards, and propose improvement plans.

A Study on How to Vitalize the ESG Management Strategy of SMEs through ESG Management Cases

  • KIM, Jin-Kwon;KIM, Min-Su;AHN, Tony-DongHui
    • The Journal of Economics, Marketing and Management
    • /
    • v.10 no.6
    • /
    • pp.39-46
    • /
    • 2022
  • Purpose: The purpose of this study is to look at the current status and cases of ESG at home and abroad, and through this, seek ways to activate the ESG strategy of domestic SMEs and suggest a direction. Research design, data and methodology: This study examines the current status of ESG management at home and abroad and examples of companies through related literature on ESG management and performance. Through this, the strategic direction of ESG management of domestic SMEs was presented. Results: Compared to the government and major corporations, SMEs can be said to lack ESG management activities. ESG activities include environmental activities such as carbon neutrality, waste management, eco-friendly supply chain management, establishment of safety and health processes to improve workers' environment, expansion of governance to guarantee autonomy and profitability such as fair trade, protection of social and shareholder rights such as anti-corruption, etc. should be based on Therefore, there are difficulties in ESG activities of SMEs that lack funds and manpower. Conclusions: Compared to the government and major corporations, SMEs can be said to lack ESG management activities However, it will be possible to establish and implement ESG management strategies based on the strengths of SMEs and the characteristics of each company.

Research on Six Sigma Application for Efficiency of Logistics (물류관리 효율화를 위한6시그마 적용에 관한 연구)

  • Yoon, Seong-Pil;Cho, Tae-Yeon;Yoo, Jin-Sung;Kim, Chang-Soo
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.4
    • /
    • pp.129-149
    • /
    • 2006
  • Six sigma, contrary to TQM, offers the concrete process for accomplishing the management innovation. Nowadays it has become as a standard means. Many companies claim to stand for durable management and would like to get customers' satisfaction and more profit with total six sigma activities. Under the present conditions we propose how to maximize efficiency with six sigma application on transportation management that is an issue among many companies.

Measurement and Testing System (측정 및 시험시스템(M&TS))

  • Choi, Sung-Woon
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2005.11a
    • /
    • pp.382-388
    • /
    • 2005
  • This paper has briefly explained the various measurement and testing system which is an Important component of modern quality and process improvement activities. This paper deals with precision and force measurement , NDT, and MSA.

  • PDF

A Study on the Integration of Systems Engineering Process and Systems Safety Process in the Conceptual Design Stage to Improve Systems Safety (시스템 개념설계 단계에서 안전도 향상을 위한 시스템공학 및 시스템안전 프로세스의 통합에 관한 연구)

  • Kim, Young-Min;Lee, Jae-Chon
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.3
    • /
    • pp.1-10
    • /
    • 2012
  • Recently, we have witnessed the definitely negative impacts of large-scale accidents happened in such areas as atomic power plants and high-speed train systems, which result in increased fear for the potential danger. The problems appear to arise due to the deficiency in the design of large-scale complex systems. One of the causes can be attributed to the design process that does not fully reflect the safety requirements in the early stage of the system development because of the substantially increased complexity. In this paper, to enhance the systems safety an integrated process is studied, which considers simultaneously both the system design process and system safety process from the beginning of the system development. In the conceptual system design phase an integrated process model is constructed by analyzing the activities of both the system design and safety processes. As a case study example, an inner city train system is described with the application of the developed process. The computer simulation of the example case is followed by the result discussed. The results obtained in the paper are expected to be the basis for the future study where a detailed process and its associated activities can be developed.

Integrated Safety Risk Assessment and Response Preparation on Construction Site Formwork Using FMECA Method (FMECA 기법을 적용한 건설현장 거푸집작업의 통합 안전위험성 평가 및 대응방안 마련)

  • An, Sun-Ju;Song, Sang-Hoon
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.3
    • /
    • pp.39-48
    • /
    • 2012
  • Risk Assessment to list possible safety disasters and their probability and severity is the starting point for effective safety management on construction project site. However, the safety managers in owners, construction supervisors, contractors, and sub-contractors still have difficulties in judging the priorities of safety activities and preparing responses to each potential safety disasters. Therefore, this study aimed to suggest a systematic method in assessing safety risk prior to commencement with the agreement of stakeholders. FMECA(failure mode effects and criticality analysis) was selected as a main assessment tool and it was modified according to the characteristics of construction projects and trades. Each risk is, firstly, evaluated with occurrence probability, possible loss and impacts to projects, and detections, and then risk priority number(RPN) is calculated. Subsequently, the managers of each stakeholder discuss the types, timing, and responsibilities of responses as a group decision-making process.