• 제목/요약/키워드: rock anchor

검색결과 91건 처리시간 0.035초

자연표토 복원공법에 의한 암절취비탈면의 생태적 복원에 관한 연구 : 원주사례지역을 중심으로 (Study on the Ecological Restoration of Rock-exposed-cut-slope by Natural Topsoil Restoration Methods : In Case of Won-Ju Experiment)

  • 남상준;석원진;김남춘
    • 한국환경복원기술학회지
    • /
    • 제2권4호
    • /
    • pp.54-63
    • /
    • 1999
  • This study was conducted to suggest the ecological restoration and environmentally friendly revegetation technology for the rock-exposed cut-slopes by the Natural Topsoil Restoration Methods (NTRM) with the following restoration objectives; (1) prevention or reduction of wind and water erosion, (2) provision of food and cover for variety of animal species, (3) improvement of the visual or aesthetic quality of the disturbed slopes. On Nov. in 1995, the 5cm thick layer of artificial soil and 2cm thick layer of straw-mulching was attached at rock-exposed cut-slopes by NTRM without using anchor wire and anchor pin. The main results during four years surveying on the ground-coverage effect, plant growth, species diversity and importance values were summarized as follows. 1. Artificial soil attached at rock exposed cut-slopes was not eroded until recovered by tree and herbaceous vegetation in spite of not using anchor wire and anchor pin. Also it shows low soil hardiness and has almost the same amount of bacteria and fungi with in surrounding natural topsoil. 2. In 'combination for the woody vegetation', Lespedeza cyrtobotrya, Albizzia julibrissin, Rhus chinensis, Indigofera pseudo-tinctoria occupied upper layer vegetation. Since three years after seeding, Indigofera pseudo-tinctoria had overwhelmed the other woody plants and cool season foreign grasses, Erigeron canadensis, Taraxacum mongolicum, Commelina communis, Arundinella hirta (Thunberg) and Oenothera erythrosepala grows at lower part of the vegetation, 3. The heights of the Rhus chinensis grows 1.8m, Indigofera pseudo-tinctoria 2.0m, so it seems that the objectives of woody vegetation with native plants could be accomplished. 4. After 4 years later after seeding in 'combination for the herbaceous vegetation', the most dominant plant was Indigofera pseudo-tinctoria, the next was in order of cool-season grasses, Taraxacum mongolicum, Erigeron canadensis, lxeris dentata (Thunberg), Oenothera erythrosepala, Arundinella hirta (Thunberg). The diversity index in 'combination for woody vegetation' was higher than that in 'combination for the herbaceous vegetation'. The tendency of the intrusion of secondary succession plants was more effective in 'combination for the herbaceous vegetation' than in 'combination for the woody vegetation'.

  • PDF

현수교의 지중정착식 앵커리지 설계 (The Design of Rock Anchored Anchorage of Suspension Bridge)

  • 안익균;김경택;박기웅;장학성
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.629-640
    • /
    • 2008
  • South anchorage(AN1, Myodo side) of supension bridge between Myodo and Gwangyang is designed as rock anchorage with 36m anchor length using the resistance of rock mass in Myodo. Checking the overall stability of the anchorage, we considered rock joints, bedding planes, fault zones and condition of rock structure in situ by analysis results for photo-lineaments, aerial photograph interpretation and drill-hole logs are considered. This anchorage consists of an access shaft, adit, and the upper and lower concrete bearing plate to introduce pre-stressing force into rock mass.

  • PDF

콘크리트보수용 접착제를 이용한 Anchor Bolt의 인발지지력 산정에 관한 실험적 연구 (Performance test of Chemical Anchor Bolts for Concrete Repair)

  • 김용곤
    • 한국안전학회지
    • /
    • 제17권2호
    • /
    • pp.85-91
    • /
    • 2002
  • A research on the performance of retrofit anchors was conducted using adhesives for rehabilitation. From the pull-out tests of the chemical anchors, the effect of the hole diameter, spacer, temperature, moisture, embedment depth, and aging time were investigated. The spacer did not directly increased the pull-out load hilt increased post-yielding resistance therefore the ductility of the retrofit anchors. When the hole was cleaned and dried after the immersion, the pull-out load was greatly increased compared to the wet hole. A design equation was unposed depending on the embedment depth of the anchor bolt.

풍화암에 시공된 부력저항 앵커의 거동특성 (Characteristics of Anchor Behavior Resisting Buoyancy Forces in the Weathered Rock)

  • 유남재;이근착;정길수;박병수
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 지반공학 공동 학술발표회
    • /
    • pp.698-705
    • /
    • 2005
  • This study contains actual scaled site experiments on mediation factors affecting ultimate pulling force of the buoyancy resisting anchor which is installed underground water level suffering buoyancy force and breaking mechanism. Site buoyancy test selected the buoyancy acting site where acting buoyancy to the station structure since the stream and reservoir is neighboured to the vicinity ground and executed site experiments leading to variation of anchoring length, drilling diameter and tendon diameter at the weathered rock ground. The test result showed that pulling force getting increased more and more proportionate to increase of anchoring length, drilling diameter and tendon diameter, and as a result of analysis for correlations between anchoring length-ultimate limited load and drilling diameter-ultimate load (on the basis of 254mm settlement), modulus of correlation showed very high relation 0.9 and 0.99 respectively and correlation formular showed the limited load is increasing proportionate to cubic meters of anchoring length as well as the ultimate load proportionate to alignment of drilling diameter. It is also showed that limited load increased about 42.5% from 392kN to 559kN as a result of change the tendon diameter to 36mm and 50mm.

  • PDF

암반 앵커기초로 시공된 송전철탑 구조물의 거동특성에 관한 연구 (Behavior of Electric Transmission Tower with Rock Anchor Foundation)

  • 김경열;홍성연;이대수
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 추계 학술발표회
    • /
    • pp.605-614
    • /
    • 2010
  • In this paper, the initial behavior of transmission tower was analyzed. This tower was firstly constructed by rock anchor foundation in domestic 154 kV transmission line and wireless real-time monitoring system was installed to obtain the measured data for analysis of the structure behavior. For this purpose, 16 strain gauges was installed in anchors of foundation and strain gauges, clinometers, anemoscope and settlement sensors was installed at superstructure. As the results, the main factor which influence the behavior of superstructure is wind velocity, wind direction, rainfall and temperature change. Especially, the uplift load at stub of transmission structure revealed about 35.4 percentages of design load. Hereafter the long term stability will be analyzed.

  • PDF

암반사면의 안정성검토 및 보강방안에 관한 사례연구 (A Case Study on The Stability and Reinforcement Method at a Rock Slope)

  • 천병식;이승언;공진영;임주헌
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 추계학술대회 논문집
    • /
    • pp.1369-1375
    • /
    • 2006
  • This study analyzes stability and the reason of slope failure about cut slope on stony mountain in Acheondong, Guri and suggests the reasonal reinforce method. Based on the results of the subsurface exploration, laboratory tests, and the numerical analysis of finite element method, the potentials of plane and wedge failure are highly estimated. The safety factor was 1.2 under dry and 1.06 wet condition. The most proper reinforce method to raise the safety factor more than 1.5 was the way to control displacement by using step retaining wall, earth anchor, wire mesh, and rock anchor.

  • PDF

단일 록 앵커(Rock Anchor) 인발시험에 관한 연구 (The Experimental Study on the Uplift Capacity Test of Circular Anchors in Rock Mass)

  • 이경진;나환선;박동수;김강식;김우범
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1999년도 가을 학술발표회 논문집
    • /
    • pp.3-10
    • /
    • 1999
  • There is an increasing demand for using rock anchors as foundations in many geotechnical engineering structures such as transmission towers, dams, etc. For investigate the behavior and strength of rock anchors, in-situ pull-out tests were carried out. From the tests, various forms of failure of rock anchors were observed. Ultimate capacity of each failure modes of 1) Tendon failure, 2) Interface failure(tendon-grout interface, sheath-grout interface and grout-rock interface), 3) Combined interface failure, was obtained by varying the parameters such as diameter and length of tendon, grout strength, and quality of rock.

  • PDF

Study on anchorage effect on fractured rock

  • Wang, Jing;Li, Shu-Cai;Li, Li-Ping;Zhu, Weishen;Zhang, Qian-Qing;Song, Shu-Guang
    • Steel and Composite Structures
    • /
    • 제17권6호
    • /
    • pp.791-801
    • /
    • 2014
  • The effects of anchor on fractured specimens in splitting test are simulated by DDARF method, the results of which are compared with laboratory test results. They agree well with each other. The paper contents also use the laboratory model test. The main research objects are three kinds of specimens, namely intact specimens, jointed specimens and anchored-jointed specimens. The results showed that with the joint angle increased, the weakening effects of jointed rock mass are more obvious. At these points, the rock bolts' strengthening effects on the specimens have become more significant. There is a significant impact on the failure modes of rock mass by the joint and the anchorage.

앵커 긴장력 상시확인을 위한 육안확인장치 개발 (Development of Visual Confirmation Device for Anchor Tensile Force)

  • 윤환희;이용주;오동욱;김동현;정혁상
    • 터널과지하공간
    • /
    • 제28권5호
    • /
    • pp.493-511
    • /
    • 2018
  • 본 논문에서는 그라운드 앵커의 긴장력 손실에 대응하고자 긴장력 상시확인을 위한 앵커 긴장력 상시 육안확인장치에 대한 내용을 다루었다. 그라운드 앵커는 사회적 인프라 시설의 안정성을 확보하기 위해 시공되었지만 지속적인 긴장력 손실로 인해 시설물에 대한 안전이 심각하게 우려되고 있는 실정이다. 이에 앵커의 유지관리가 요구되지만 현재 잔존긴장력의 계측은 경제적인 측면을 고려하여 표본조사로 이루어지고 있어 정밀도에 대한 한계점을 지니고 있다. 따라서 본 논문에서는 앵커의 긴장력을 육안으로 확인할 수 있는 앵커 긴장력 상시 육안확인장치의 개발을 목적으로 개념설계, 실내 인장실험을 통한 규격화를 수행하였으며, 현장시험을 통해 성능을 확인하였다.

터널의 굴착을 위한 수직사면의 안정대책 방안 수립 및 시행 (Slope stability method establish and carry out in vertical slope for tunnel excavation)

  • 박철숙;김준용;곽한;김민조;최우경
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.992-1006
    • /
    • 2008
  • The tunnel type spillways is under construction to increasing water reservoir capacity in Dae-am dam. Cutting-slope adjacent to outlet of spillways had been originally designed to be 63 degrees and about 65m in height. Examination is carried out in preceding construction that it is caused to some problems possibility which of machine for slope cutting couldn't approach to the site, blasting for cutting slope might have negative influence on highway and roads nearby, and fine view along the Tae-hwa river would be eliminated. In order to establish stability of tunnel and more friendly natural environment that we are carry out detailed geological surface survey and analysis of slope stability. So, we are design and construct for tunnel excavation with possible method that it is keep up natural slope. The result of survey and analysis that natural slope was divided 3 zone(A, B, C zone). In A and B zone, in first removed floating rock, high tensile tension net is install that it prevent of release and falling of rock, in order to security during under working. In addition to, pre-stressed rock anchor is install purpose of security during tunnel excavation because of fault zone near vertical developed above excavation level. Zone C is relatively good condition of ground, design is only carry out random rock bolt. All zone are designed and constructed drainage hole for groundwater and surface water is easily drain. Desinged slpoe is harmony with near natural environment. Successfully, construction is completed.

  • PDF