• Title/Summary/Keyword: road traffic condition

Search Result 279, Processing Time 0.026 seconds

Existential Psychological approaches about risk and safety (위험과 안전에 대한 실존심리학적 고찰)

  • Soon yeol Lee
    • Korean Journal of Culture and Social Issue
    • /
    • v.22 no.3
    • /
    • pp.387-410
    • /
    • 2016
  • This study conducted a review of the existential and psychological perspective about the risks and safe. The risk was identified as existential task through the existential philosophy and psychology discussed were the safety regulations as existential need. As existential anxiety that is caused by unmet and insufficiency of the existential needs and the existential task that was presented to identify the subjective risk. Subjective risk as existential anxiety, and suggested that serves as a compass to advance to the completion and the facing the existential. In addition, existential anxiety as a subjective function as a signal that can identify the problem conditions that expressed phenomena. Problematic aspect of a subjective risk was suggested that it can be adjusted through a method for supplying information that can be recognized by an experienced and symmetrical state with the direction of the expressed symptoms. The attempt to determine the existence of and psychological point of view, it gave provided the underlying psychological spokesman for the analysis of human society, including the Sewol ferry of Korea-type disaster. There are also presented some implications that can be applied effectively to give more psychological approach to future risk reduction and safety enhancement. In addition, this study through the various views presented by a comprehensive existential subject of several ways to adjust the status Theme conditioning method (Theme Condition Adjustment Theory: TCAT) to establish a theoretical basis for expecting it to be that.

  • PDF

Finding the One-to-One Optimum Path Considering User's Route Perception Characteristics of Origin and Destination (Focused on the Origin-Based Formulation and Algorithm) (출발지와 도착지의 경로인지특성을 반영한 One-to-One 최적경로탐색 (출발지기반 수식 및 알고리즘을 중심으로))

  • Shin, Seong-Il;Sohn, Kee-Min;Cho, Chong-Suk;Cho, Tcheol-Woong;Kim, Won-Keun
    • Journal of Korean Society of Transportation
    • /
    • v.23 no.7 s.85
    • /
    • pp.99-110
    • /
    • 2005
  • Total travel cost of route which connects origin with destination (O-D) is consist of the total sum of link travel cost and route perception cost. If the link perception cost is different according to the origin and destination, optimal route search has limitation to reflect the actual condition by route enumeration problem. The purpose of this study is to propose optimal route searching formulation and algorithm which is enable to reflect different link perception cost by each route, not only avoid the enumeration problem between origin and destination. This method defines minimum unit of route as a link and finally compares routes using link unit costs. The proposed method considers the perception travel cost at both origin and destination in optimal route searching process, while conventional models refect the perception cost only at origin. However this two-way searching algorithm is still not able to guarantee optimum solution. To overcome this problem, this study proposed an orign based optimal route searching method which was developed based on destination based optimal perception route tree. This study investigates whether proposed numerical formulas and algorithms are able to reflect route perception behavior reflected the feature of origin and destination in a real traffic network by the example research including the diversity of route information for the surrounding area and the perception cost for the road hierarchy.

The Effect of Staggered Pedestrian Crossings at Wide Width Intersections (광폭교차로에서 2단 횡단보도 설치 효과분석)

  • Kim, Dong-Nyong;Hong, Yoo-Min
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.10 no.5
    • /
    • pp.23-35
    • /
    • 2011
  • The pedestrian green time is usually long at wide width intersections. This sometimes causes the increase of delay on the whole intersection because of long cycle length and thus small g/C ratio on some direction. In this paper, to improve these problems, staggered pedestrian crossing was evaluated on the vehicular and pedestrian aspects. The results were gained by using both TRANSYT-7F and VISSIM model. The vehicle control delay of the staggered pedestrian crossing was estimated to be decreasing than that of the general pedestrian crossing by 14.9% to 85.6%. The pedestrian average delay of two pedestrian crossing systems was examined by analytical method and VISSIM. According to the analytical method there was no significant difference between each pedestrian crossing system. The pedestrian delay of staggered pedestrian crossing was from 13.4% to 22.3% than the general pedestrian crossing by VISSIM. In conclusion, the staggered pedestrian crossing was more effective than general pedestrian crossing for both the vehicle and the pedestrian. However this conclusion was resulted from micro simulation where traffic volume condition, v/c, was from 0.8 to 1.1.

Investigation of Lateral Resistance of Short Pile by Large-Scale Load Tests (실물 재하시험을 통한 짧은말뚝의 횡방향 저항거동 평가)

  • Lee, Su-Hyung;Choi, Yeong-Tae;Lee, Il-Wha;Yoo, Min-Taek
    • Journal of the Korean Geotechnical Society
    • /
    • v.33 no.8
    • /
    • pp.5-16
    • /
    • 2017
  • When a lateral load is applied to a short pile whose embedded depth is relatively smaller than its diameter, an overturning failure occurs. To investigate the behavior of laterally loaded short piles, several model tests in laboratory scales had been carried out, however the behavior of large moment carrying piles for electric poles, traffic sign and road lamp, etc. have not been revealed yet. This paper deals with the real-scale load tests for 750 mm diameter short piles. To simulate the actual loading condition, very large moment was mobilized by applying lateral loads to the location 8 m away from the pile head. Three load tests changing the pile embedded lengths to 2.0 m, 2.5 m, and 3.0 m were carried out. The test piles overturned abruptly with very small displacement and rotation before the failures. These brittle failures are in contrast with the ductile failures shown in the former model tests with the relatively smaller moment to lateral load ratio. Comparisons of the test results with three existing methods for the estimation of the ultimate lateral capacity show that the method assuming the rotation point at pile tip matches well when the embedded depth is small, however, as the embedded depth increases the other two methods assuming the inversion of soil pressure with respect to rotation points in pile length match better.

A Study for Roughness of Joungbu Expressway (중부고속도로 평탄성 특성에 관한 연구)

  • Kim, Sung-Ho;Suh, Young-Chan;Cho, Yoon-Ho;Park, Kyung-Boo
    • International Journal of Highway Engineering
    • /
    • v.3 no.2 s.8
    • /
    • pp.131-140
    • /
    • 2001
  • Concrete pavement of Jungbu Expressway composed of CRCP(Continuously Reinforced Concrete Pavement) and JCP(Jointed Concrete Pavement). The CRCP was firstly constructed and applied to new expressway in Korea. It is a good source of the study to analyze the performance of CRCP and JCP because it experiences same amount of traffic and environmental loading. Up to the present, condition survey has conducted several times during 13 years but roughness measurement has not been carefully conducted. Through comparisons among several types of pavement(CRCP, JCP, Asphalt) by roughness, CRCP is superior to JCP. In addition, connected sections in the highway such as bridges and tunnels that have higher IRI values, about 5mm/m, than normal sections should be considered appropriated maintenance such as diamond grinding. The relationship between IRI and distresses carried out by Korea Highway Cooperation in 1999 skewed that the number of crack is related to IRI value in JCP, while other distresses of JCP and CRCP are not shown clearly. The comparison study with IRI values between Jungbu Expressway and GPS-3(JCP) and GPS-5(CRCP) of LTPP data also showed that roughness of Jungbu Expressway is not inferior to that of the state. Some of section showed larger values of IRI are linked with under-9round structures for passages and drainages. The overall performance considering only roughness, the CRCP is also superior to JCP in sections with under-ground tunnels.

  • PDF

A Study on the Expansion Joint of Concrete Lining and Duct in a Tunnel (터널 콘크리트 라이닝 및 공동구 신축이음 설치방안에 관한 연구)

  • Son, Moorak;Park, Yangheum;Park, Yunjae;Kim, Jaegyoun;Yoon, Jongcheol
    • Journal of the Korean Geotechnical Society
    • /
    • v.31 no.3
    • /
    • pp.39-50
    • /
    • 2015
  • The installation of the expansion joints in a tunnel concrete lining and duct would minimize the cracking at the location of structural shape and stiffness change, differential settlement, big temperature change, and so on. However, it is difficult to determine the required spacing of the expansion joint in a tunnel concrete lining and duct quantitatively because the spacing is influenced by temperature change, structure construction condition, ground-structure interaction, and etc. Nevertheless, a highway specification (Korea Expressway Corporation, 2012) or a road design manual (Ministry of Land, Transport and Maritime Affairs, 2010) specifies that the expansion joint spacing in a tunnel concrete lining should be installed uniformly smaller than 25 m from the tunnel portals to 50 m inside of a tunnel and elsewhre 20-60 m in a tunnel (because there is no specifcation for a duct it is assumed that a duct follows the specfication of lining). This specification results in several construction and economic problems in relation with a tunnel construction. Accordingly, in order to minimize the problems, this study analyzed both domestic and foreign design standards and specifications. In addition, field test, theoretical and numerical analyses were carried out in relation to the expansion joint in a tunnel lining and duct. The purpose of this study is to reestabilish a criterion for installing the expansion joint in a tunnel concrete lining and duct.

Validation of Permanent Deformation Model for Flexible Pavement using Accelerated Pavement Testing (포장가속시험을 이용한 소성변형예측 모델의 검증)

  • Choi, Jeong Hoon;Seo, Youngguk;Suh, Young Chan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.4D
    • /
    • pp.491-497
    • /
    • 2009
  • This paper presents the results of accelerated pavement tests (APT) that simulate permanent deformation (rutting) of asphalt concrete pavements under different temperatures and loading courses. Also, finite element (FE) analysis has been conducted to predict the test results. Test section for APT is the same as one of test sections at Korea Expressway Corporation test road and is subjected to a constant moving dual tire wheel load of APT at three different temperatures: 30, 40, $50^{\circ}C$. The moving wheel is applied at different loading courses within a 75cm wide wheel path to account for traffic wandering. Also, the effect of wandering on permanent deformation development is investigated numerically with three wandering schemes. In this study, ABAQUS is adopted to model APT pavement section with plain stain elements and creep strain rate model is used to take into account viscoplastic stain of asphalt concrete mixtures, and elastic layer properties are back-calculated from FWD measurements. Plus, the effect of boundary condition and subgrade on FE permanent deformation predictions is investigated. A full FE model that accounted for subgrade provided more realistic rut depth predictions, indicating subgrade has contributed to surface rutting.

The Commencement Period of the Korean Type Bronze Dagger Culture, Seen from the Condition of the Section Polishing Technique - Through the Chronology of Chinese Data - (구분마연 기술로 본 한국식동검문화의 개시 연대 - 중국 자료의 편년을 통하여 -)

  • Heo, Jun-Yang
    • Korean Journal of Heritage: History & Science
    • /
    • v.50 no.3
    • /
    • pp.4-29
    • /
    • 2017
  • The purpose of this study is to grasp the commencement date of Korean-type bronze dagger through the chronology of Chinese data. It focuses on the fact that the same section polishing technique appears both in Korean type bronze dagger and Dongzhou type bronze dagger. Dongzhou type bronze dagger in Anqiu Shandong, in which A1 type section polishing technique is observed, was said to have been collected remains in 1958, but the clear excavation cannot be identified. Therefore, this study presents Tomb No.1 Zuojiawa Jinan, Dongzhou type bronze dagger, and associated products. As associated products, bronze weapon and bronze ware were excavated, whose periods are estimated to be in the Spring and Autumn period, the transition period of Warring States, and the former part of the China's Warring States. Accordingly, the Korean bronze dagger, excavated in the remains of the Han Peninsula appears to have run parallel with the Dongzhou type bronze dagger of the A1 type section polishing technique, excavated in China for a fixed period. In addition, the chronology of Tomb No. 61MI grave in Wanrongmiaoqian, Shanxi is estimated to range from the former part to the middle part of the China's Warring States, which is identified to be connected to the A1 type section polishing technique. Examining the data of the relative date, we can find out that the Commencement Period of the Korean type bronze dagger Culture is seen to be the transition period and the former part of the China's Warring States, which is estimated to be the 5th and 4th centuries BC. This chronology is followed by Tomb No.6512 Zhengjiawazi Shenyang, recorded as the 6th century B.C. which reveals that Liaoning type bronze dagger culture and Korean-typed Bronze Dagger Culture are naturally connected. Furthermore, the A1 type section polishing technique was distributed in the southwestern area of the Korean peninsula and Shandong, China, while the A2 type section polishing technique was distributed in the southern area of the Korean peninsula, Shanxi-Province in China, and Northern Kyushu region in Japan. Seen from the weapon-shaped bronze ware of the section polishing technique, Shanxi area(Central Plains area), China. the southwestern area of the Korean peninsula (northwest area), and Northern Kyushu region in Japan are set up as one traffic road(spreading route). This demonstrates that the section polishing technique emerged around the Han Peninsular, spreading the technique regionally.

Dinosaur Tracksite at Jeori, Geumseongmyeon, Euiseonggun, Gyeongsangbukdo, Korea(National Monument No. 373) - Occurrences, Significance in Natural History, and Preservation Plan - (경북 의성군 금성면 제오리 공룡발자국화석 산지(천연기념물 제373호) - 산상, 자연사적 가치 및 보존 방안 -)

  • Paik, In Sung;Kim, Hyun Joo;Kang, Hee Cheol;Lim, Jong-Deock
    • Korean Journal of Heritage: History & Science
    • /
    • v.46 no.1
    • /
    • pp.268-289
    • /
    • 2013
  • The Dinosaur tracksite at Jeori, Geumseongmyeon, Euiseonggun, Gyeongsangbukdo, Korea (National Monument No. 373) has been studied in the aspects of location, stratigraphy, sedimentology, fossil occurrence, unique geological records, literature, significance in natural history, preservation, and management. On the basis of these features, the Jeori tracksite has been assessed semiquantitavely. The Jeori tracksite occurs in the Sagok Formation (Albian) of the Euiseong sub-basin, and over 300 footprints forming 12 sauropod trackways, 10 ornithopod trackways, and 1 theropod trackways are preserved in this tracksite. The track-bearing deposits consist of tabular-bedded medium- to fine-grained arkose with mudstone drape, interlaminated fine-grained sandstone to siltstone and mudstone, and shaly mudstone. The dinosaur tracks are preserved in the interlaminated fine-grained sandstone to siltstone and mudstone, and most of them are observed as underprints. The track-bearing deposits are interpreted as sheetflood deposits on the floodplain under a seasonal paleoclimatic condition with alternating of wetting and drying periods. Multiple tension fractures with NE strike were formed in the track-bearing bed, which resulted in that tracks seem to occur in several horizons. The significance in natural history of the tracksite can be summarized as follows: 1) the historical implication of the Jeori tracksite as the firstly designated National Monument of dinosaur fossil sites, 2) the high density of the occurrence of diverse footprints (over 300) within small area (about $1,600m^2$), and 3) the significance of the tension fractures associated with the track-bearing bed as geoeducational records for the understanding the development of fault. In order to share the value of the Jeori tracksite in the aspect of natural history with the community and public, the interpretive panel should be modified to include figures explaining paleoenvironment and tension fault development. In addition it is recommended that a brochure be published briefly explaining the tracksite and to educate the residents about the natural and social significance of the tracksite. For the safety of visitors it would be desirable for the road in front of the tracksite to be moved at least 10 m southward, which could mitigate the shaking of the track bed caused by traffic.