• Title/Summary/Keyword: road repairing

Search Result 34, Processing Time 0.028 seconds

Flow Characteristics of the Ballast Blower for the Prevention a Foreign Object Damage on the Rail Road (선로상 이물질 제거를 위한 자갈날림판 유동특성 연구)

  • Rho, Joo-Hyun;Kim, Duck-Young;Ku, Yo-Cheon;Yun, Su-Hwan;Kwon, Hyeok-Bin;Lee, Dong-Ho
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.414-419
    • /
    • 2006
  • The ballast or other objects may be located on the rail road by a lump of ice, repairing operation on the track, or the strong gust due to the high speed running of the train. When a train operated in this condition, it causes serious damages to the wheel, train, and structures near the track, or the secondary ballast flying. To remove these objects safely, a ballast blower is suggested which was attached under the train. Firstly, the numerical analyses are investigated to find out the basic flow characteristics of the ballast blower. Next, the performance of the ballast blower is verified by wind tunnel experiments. Through these studies, it is expected that the ballast blower can be applied practically.

  • PDF

A Study for Developing of Rail Bridge Inspection Robot (철도교량 자동화 로봇 개발을 위한 기초 연구)

  • Koo, Ja-Kyung;Hwang, In-Ho;Lee, Jong-Seh;Lee, Tai-Sik
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.188-193
    • /
    • 2008
  • According to introduce KTX in Korea, rail-road bridge section of KTX was increased approximately 50% of the total length. Bridge is required periodic inspection and check to prevent accident and hazard because various damage which have effects on traffic and replacement of damaged parts is difficult. Specifically, the train as large-scale transportation because accidents led to great damage, preventing these accidents are critical. Well-organized management and maintenance systems are required to prevent the accidents. In the case of roadway bridge, bridge inspection vehicle is used to deploy inspectors in roadway bridge. However, this method requires a lot of time and efforts, and inspectors are exposed to potential hazard. Also, surrounding environment like poor lighting system or electric wire could harm the inspector while repairing. Due to this reason, automatic repairing and inspecting system have been introduced to replace the old methods. Management system of the railroad bridge track for trains uses various advanced equipments, but whereas roadway bridge management system is lacking these efforts. As a result of that, this study looks over the existing management method. and review the method to apply the Bridge Inspection Robot in railroad bridge. Moreover, this study suggests future management technology using inspection robot.

  • PDF

An Experimental Study on the Safety Performance of the Rear Safety Guard with Air Bag for Truck (화물차량용 에어백 후부안전판 안전성능에 대한 실험적 연구)

  • Park, In-Song;Yun, Kyung-Won;Park, Kwang-Jong;Kim, Hyo-Jun
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.22 no.4
    • /
    • pp.10-19
    • /
    • 2014
  • Despite the movement of safe traffic by the Korean government to reduce deaths in traffic accidents, the casualties increase year by year. In particular, more and more accidents and casualties are reported from car collisions from the back of the vehicles parked for managing traffic accidents on the road, cleaning main roads and medial strips, repairing roads. In order to response to these accidents, the government should take protective measures for road users. In the last decade, seventy-one cases have been reported to occur during highway repair and maintenance. As a result, eight persons were killed and seventy-six were injured, showing the high death rate of 11.3 percent. Therefore, it seems urgent to take some actions against it. The United States and European countries legislate that vehicles of road repair and maintenance should be mandatorily equipped with shock absorber at the back. Korea, however, does not have such legislative measures, which are needed at this time to protect workers on the road. This study compares the performance of the traditional shock absorber for road maintenance vehicles with that of the rear safety guard using air bag, manufactured in accordance with related laws in Korea. Based on the results of the 60km/h rear collision test, this paper proposes improvements in related laws and regulations in an attempt to reduce casualties.

Study on Subsurface Collapse of Road Surface and Cavity Search in Urban Area (도심지 노면하부 지반함몰 및 공동탐사 사례 연구)

  • Chae, Hwi-Young
    • Tunnel and Underground Space
    • /
    • v.27 no.6
    • /
    • pp.387-392
    • /
    • 2017
  • Recently, road cave-ins, also referred to as ground sinking, have become a problem in urban environments. Public utility facilities such as sewage pipelines, communications pipes, gas pipes, power cables, and other types of underground structures are installed below the roads. It was reported that cave-ins are caused by the aging and lack of proper maintenance of underground facilities, as well as by construction problems. A road cave-in is first initiated by the formation of cavities typically induced by the breakage of underground pipelines. The cavities then grow and reach the base of the pavement. The traffic load applied at the surface of the roads causes an abrupt plastic deformation. This type of accident can be considered as a type of disaster. A road cave-in can threaten both human safety and the economy. It may even result in the loss of human life. In the city of Seoul, efforts to prevent damage before cave-ins occur have been prioritized, through a method of discovering and repairing joints through the 3D GPR survey.

The Engineering Characteristic of Asphalt Waste for Recycling (재활용을 위한 폐아스팔트 혼합재의 역학적 특성)

  • Jung, Sung-Yun;Lee, Kyu-Hwan;Jung, Dae-Suk
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.932-937
    • /
    • 2008
  • The asphalt waste has been collected more than ten thousands' ton from repairing works on the road and excavation repair works, most of them are disposed on land of reclamation. Only a few percentage of wasted asphalt recycled to new one. Therefore, In this study, usage of wasted asphalt and has been done engineered characteristic test for recycling materials of sub-grade and structure. To know the characteristic of asphalt waste, tamping test, bearing-ratio test, permeability test and direct shear test was done using asphalt-sand mixture. The test results shows that, mixed asphalt materials with sand can be used for materials of subgrade-soil and structure.

  • PDF

The Estimation of the Number of Spare Parts and the Changing Time about DSRC Road Side Equipment (단거리전용통신방식 노변기지국의 예비부품수 및 교체시기 산정)

  • Han, Dae-Hee;Lee, Chung-Won
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.6 no.3
    • /
    • pp.174-182
    • /
    • 2007
  • There are not many studies on the maintenance and replacement for the ITS equipments. Most of ITS center has no comprehensive regulation on the equipment replacement. This study was focusing on estimation of equipment replacement period and the number of spare parts in stock using the actual failure data of Road Side Equipment (RSE) by Dedicated Short Range Communication (DSRC). The failure data showed a type of bath-tub curves. The data, however, did not fit to any probability distribution curve, which means that the preventive replacement cannot be strongly applied for the RSE. In the aspect of practical strategy, this study suggest that repairing cost and failure frequency be used for decision of replacement of RSE after the 1 or 2 year warrant period. The future study needs to include more RSE failure data as well as other equipments of the ITS.

  • PDF

Evaluation on Patching Materials for Asphalt Pavement (아스팔트 포장도로의 응급보수재료 평가에 관한 연구)

  • Shim, Jae-Pill;Jin, Jung-Hoon;Park, Tea-Soon;Lee, Jae-Sik
    • International Journal of Highway Engineering
    • /
    • v.14 no.3
    • /
    • pp.59-67
    • /
    • 2012
  • This study presents the evaluation of the patching materials that are used to repair the distress of asphalt pavement. Four kinds of patching materials currently used in practice were tested in both laboratory and field. The laboratory tests included the dry and soaked Marshall stability test, indirect tensile test, wheel tracking test and adhesive strength between the asphalt pavement and the repairing material was tested as a performance test. The field study was conducted using the slab samples placed on the location of vehicle tire passing and the performance of the repairing materials were investigated as passing the traffic load. The result of the laboratory tests were satisfied with the current design criteria and material standard except for water-immersion stability. Type C patching material showed the highest adhesive shear strength among the patching materials tested. However, the mature distress, such as rutting and stripping were monitored after construction in 10 days. It was found that performance of patching material is lack of quality behavior when they were applied in the field and required to develop and applu to prevent the mature distress of the current patching materials.

Evaluation of Pavement Rehabilitation Using Precast Concrete Slabs and Slab Connection methods (보수용 조립식 콘크리트 포장 적용성 및 슬래브 접합 방식 분석)

  • Cho, Young-Kyo;Oh, Han-Jin;Hwang, Ju-Hwan;Kim, Seong-Min;Park, Sung-Ki
    • International Journal of Highway Engineering
    • /
    • v.12 no.4
    • /
    • pp.165-174
    • /
    • 2010
  • This study was conducted to evaluate the feasibility of expedite repairing of concrete pavements using precast concrete pavement method and to investigate the effectiveness of slab connection methods. In the demonstration construction, four slabs of jointed concrete pavements were replaced with the precast slabs. First, precast concrete slabs were designed and fabricated, then existing slabs were cut and removed, and finally precast slabs were installed. The slabs were leveled and pockets, holes, and space between the slab bottom and the underlying layer were grouted. From the demonstration construction, details about the design and construction of the precast pavements for repairing of pavements were evaluated. In addition, the slab connection methods such as pocket and hole connection methods were applied in the construction and the slab curling behaviors at the joints that include those connection methods were compared. The results showed that both slab connection methods were applicable, and the hole connection method was superior.

Member design and strength characteristics of the MMA mortar composites (I) (MMA 모르터 복합체의 강도특성 및 부재설계 (I))

  • Ji, Hyo-Seon;Mamdouh, El-Badry
    • Journal of the Korean Society for Advanced Composite Structures
    • /
    • v.6 no.3
    • /
    • pp.41-49
    • /
    • 2015
  • The repair of manhole raise has been caused much construction times and disruption of traffic flow, serious environmental pollution from crushed construction wastes, and budget waste due to the repeated repair construction works. In order to overcome such problems, we have developed the new manhole repairing composite structures by using a glass fiber-reinforced polymer (GFRP) pipe, which can raise manhole to the regular height of the overlayed road pavement with rapid construction and minimum traffic jams. This environmental-friendly technology is method completed by the methyl methacrylate monomer (MMA) double wide flanged GFRP pipe composite structures in order to raise manhole to the regular height. In this paper, two kinds of the compressive strength tests of MMA mortar composites were conducted and evaluated by a general compressive strength test, and compressive strength test after freezing-thawing resistance test. It was found that this MMA mortar composites will be used for the application of the double wide flanged GFRP pipe composite structures.

Case Study on Deciding a Time for Repairing Asphalt Pavement of Incheon International Airport (인천국제공항 아스팔트 포장 보수시기 결정 사례 연구)

  • Lee, Jae-Ho;Kim, Jang-Rack;Mun, Hyung-Chul;Cho, Nam-Hyun
    • International Journal of Highway Engineering
    • /
    • v.15 no.6
    • /
    • pp.49-60
    • /
    • 2013
  • PURPOSES : The evaluation of the pavement condition of the asphalt concrete pavement of No. 2 runway of Inchon International Airport through PMS, a supporting system for making a decision of pavement, maintenance and repair, was made, and the proper time for repair according to the PCI reduction rate was suggested. METHODS : By comparing and analyzing the evaluation results of pavements built in 2009, 2010, 2011, PCI change in each facility (No. 2 runway, C parallel taxiway, connection taxiway) was calculated. By applying the calculated change to PCI deduction rate model, the pavement condition of the target sections was estimated, and then the necessary section and time for repair were chosen. RESULTS : After careful consideration of the time for pavement and maintenance, based on the result of PCI prediction, it was estimated that the southern takeoff and landing section of No. 2 runway was required to be repaired in 2012; connection taxiway in 2013; and C parallel taxiway in 2014; however, the section which is the main moving route of connection taxiway and C parallel taxiway was needed to be repaired in 2012. CONCLUSIONS : For maintenance and repair of airport pavements, the optimal alternative should be chosen by considering economics and operability, via examining the time for repair and the aspect of management all together on the basis of this study.