• Title/Summary/Keyword: road repairing

Search Result 34, Processing Time 0.026 seconds

A Study on the Development of Road Traffic Safety Moderator Robot using AHP (AHP분석을 통한 도로 교통안전지킴이 로봇 개발에 관한 연구)

  • Lee, Young Woo;Kwon, Hyuck Jun
    • International Journal of Highway Engineering
    • /
    • v.16 no.6
    • /
    • pp.159-167
    • /
    • 2014
  • PURPOSES : The purpose of this study is to analyze the requirements of the road traffic safety moderator robot when road repairing. The road traffic safety moderator robot is road traffic safety equipment and to conversions mechanical engineering and IT when road repairing. METHODS : The study used AHP based on the survey from road repair related expert that field engineers, design engineers, public officials and professors. The survey used paired comparison. The survey items were safety, convenience and economics. The safety is classified as visibility or efficiency, the convenience is classified as utility or mobility and the economics is classified as initial investment cost or maintenance $ management cost. The survey alternatives were the road traffic safety moderator robot, traffic regulation by human, traffic regulation by mannequin and traffic signs. The software for AHP is Expert Choice 2000. RESULTS : The results of AHP analyze, the weighted value of safety was analyzed with the highest at 0.488 of survey items. The weighted value of convenience was analyzed at 0.295, the weighted value of economics was analyzed at 0.218. The results of the road traffic safety moderator robot, the weight value of efficiency and utility were analyzed with the highest at 0.284 and 0.259 of alternatives. The weighted value of initial investment cost and maintenance & management cost were analyzed with the lowest at 0.203 and 0.211 of alternatives. The consistency test results of each items, null hypothesis is rejected because the CR values were 0.000 respectively. Therefore, the study results are consistency. CONCLUSIONS : The result of this study, overall value of the road traffic safety moderator robot came off second-best of other alternatives. The road traffic safety moderator robot has been received highest praise by the result of the study as good road traffic safety equipment when road repairing because the weighted values of efficiency and utility were analyzed with the highest of survey items. The efficiency mean securing safety and the utility mean practical assistance when road repairing. The results of this study showed that the road traffic safety moderator robot will effective for traffic safety when road repairing. economics and visibility are that supplementation of the road traffic safety moderator robot because the weighted values of economics and visibility were analyzed with the lowest of survey items. The consistency test results are consistency because the CR values were 0.000 respectively.

A Study for Selecting the Optimal Model among Ten Models of Crushing Machine with Various Constraints Related to Road Repairing (도로공사에 관련된 많은 제약조건을 갖는 열개의 파쇄장비 모델들 중 최적 모델 선정에 관한 연구)

  • Im Yeong Mun;Hwang Yeong Seop
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.11a
    • /
    • pp.125-130
    • /
    • 2004
  • It is not difficult to see the road repairing. There are many and various machines that can crush road surface. The efficiency and power of the machine depend on crushing head-shape, crushing interval, crushing load, crushing stress, machine's dropping height and roller's kind. The objective of this study is to select the optimal model among ten models of crushing machine with constraints such as crushing depth, variation, and crushed particle size. The data for this study are chosen from the site of construction in Kangnung during three months ($2004.\;6.\;1\;\sim\;2004.\;8.\;31$). The provided methodology in this paper will be fruitful not only for the selection of crushing machine but also for the aspects of construction period, cost, work efficacy according to the condition from the various sites of construction.

  • PDF

AUTOMATIC ROAD NETWORK EXTRACTION. USING LIDAR RANGE AND INTENSITY DATA

  • Kim, Moon-Gie;Cho, Woo-Sug
    • Proceedings of the KSRS Conference
    • /
    • 2005.10a
    • /
    • pp.79-82
    • /
    • 2005
  • Recently the necessity of road data is still being increased in industrial society, so there are many repairing and new constructions of roads at many areas. According to the development of government, city and region, the update and acquisition of road data for GIS (Geographical Information System) is very necessary. In this study, the fusion method with range data(3D Ground Coordinate System Data) and Intensity data in stand alone LiDAR data is used for road extraction and then digital image processing method is applicable. Up to date Intensity data of LiDAR is being studied. This study shows the possibility method for road extraction using Intensity data. Intensity and Range data are acquired at the same time. Therefore LiDAR does not have problems of multi-sensor data fusion method. Also the advantage of intensity data is already geocoded, same scale of real world and can make ortho-photo. Lastly, analysis of quantitative and quality is showed with extracted road image which compare with I: 1,000 digital map.

  • PDF

A Study on the quality of High Early Strength Concrete as Whitetopping Materials (Whitetopping 포장재의 시험포설 및 시공품질에 대한 평가연구)

  • 임채용;엄태선;유재상;이종열;엄주용;조윤호
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.10a
    • /
    • pp.507-512
    • /
    • 2002
  • In road pavements, it is known that cement concrete pavement has superior durability. But in repairing pavement, cement concrete pavement is not usually applied because of the length of time while the road is interrupted when using Ordinary and Rapid-hardening Portland Cement. And Super High Early Strength Cement and Ultra Super High Early Strength Cement are not favorable for ready mixed concrete because of rapid setting time, high slump loss and other restrictions. We developed special cement developing 1 day strength of over 30.0N/$mm^2$ to open the road within 1 day and workable time is maintained over 1 hour so that it can be used as ready mixed concrete. We performed experimental overlay construction with concrete and evaluated the properties of the fresh and hardened concrete. The flexural strength was over 5.0N/$mm^2$ and the compressive strength was over 30N/$mm^2$ at 1 day. So it is thought that the road can be open to traffic within 1 day after placement.

  • PDF

A Study on Evaluation of High Early Strength Concrete as Pavement Overlay Materials for Early Traffic Opening(2) (신속개방형 콘크리트 도로포장재의 설계를 위한 평가 연구(2))

  • 엄태선;임채용;유재상;이종열;엄주용;조윤호
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.11a
    • /
    • pp.233-238
    • /
    • 2001
  • In road Pavements, it is known that cement concrete pavement has superior durability, safety compared with asphalt pavement. But in repairing pavement, cement concrete pavement is not usually applied because of the length of time while the road is interrupted when using Ordinary and Rapid-hardening Portland Cement. And Super High Early Strength Cement and Ultra Super High Early Strength Cement are not favorable for ready mixed concrete because of rapid setting time, high slump loss and other restrictions. We aim to develope special cement and concrete developing 1 day strength of over 300 kg/$\textrm{cm}^2$ to open the road within one day and workable time is maintained over 1 hour that can be used as ready mixed concrete. In this study, we produced cement using rapid-hardening cement, Hauyne clinker, anhydride gypsum and accelerator and studied on its properties. The comperssive strength was over 400 kg/$\textrm{cm}^2$ and tensile at 1 day and workable time was maintained for over 1 hour.

  • PDF

Experimental Study on Performance of MgO-based Patching Materials for Rapid Repair of Concrete Pavement (콘크리트 포장의 급속 보수를 위한 산화마그네슘계열 단면복구재의 성능에 대한 실험적 연구)

  • Lee, Hyeongi;Ann, Kiyong;Sim, Jongsung
    • International Journal of Highway Engineering
    • /
    • v.18 no.1
    • /
    • pp.43-55
    • /
    • 2016
  • PURPOSES : This study aims to develop a repair material that can enhance pavement performance, inducing rapid traffic opening through early strength development and fast setting time by utilizing MgO-based patching materials for repairing road pavements. METHODS : To consider the applicability of MgO-based patching materials for repairing domestic road pavements, first, strength development and setting time of the materials were evaluated, based on MgO to $KH_2PO_4$ ratio, water to binder ratio, and addition ratio of retarder (Borax), by which the optimal mixture ratio of the developed material was obtained. To validate the performance of the developed material as a repair material, the strength(compressive strength and bonding strength) and durability (freezing, thawing, and chloride ion penetration resistance) was checked through testing, and its applicability was evaluated. RESULTS : The results showed that when an MgO-based patching material was used, the condensation time was reduced by 80%, and the compressive strength was enhanced by approximately 300%, as compared to existing cement-based repair materials. In addition, it was observed that the strength (compressive strength and bonding strength) and durability (freezing and thawing, and chloride ion penetration resistance) showed an excellent performance that satisfied the regulations. CONCLUSIONS : The results imply that an emergent repair/restoration could be covered by a rapid-hardening cement to meet the traffic limitation (i.e. the traffic restriction is only several hours for repair treatment). Furthermore, MgO-based patching materials can improve bonding strength and durability compared to existing repair materials.

A Study and Evaluation of Super High Early Strength Concrete as Pavement Overlay Materials for Early Traffic Opening(3) (신속개방형 콘크리트 도로포장재의 설계를 위한 평가 연구(3))

  • 임채용;엄태선;유재상;이종열;엄주용;조윤호
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.05a
    • /
    • pp.607-612
    • /
    • 2002
  • In road pavements, it is known that cement concrete pavement has superior durability, safety compared. But in repairing pavement, cement concrete pavement is not usually applied because of the length of time while the road is interrupted when using Ordinary and Rapid-hardening Portland Cement. And Super High Early Strength Cement and Ultra Super High Early Strength Cement are not favorable for ready mixed concrete because of rapid setting time, high slump loss and other restrictions. We developed special cement developing 1 day strength of over 30.0N/mm$^2$ to open the road within 1 day and workable time is maintained over 1 hour so that it can be used as ready mixed concrete. We performed experimental overlay construction with the cement and evaluated the mechanical property and the durability. At curing temperature of 8-l8$^{\circ}C$,the flexural strength was 6.4N/mm$^2$at 1 day, so that the road can be open to traffic within 1 day. In durability test, the hardened concrete showed higher durability than Portland cement concrete.

  • PDF

A Methodology and Reliability for Selecting the Optimal Model among Ten Models of Crushing Machine with Various Constraints (다양한 제약조건을 갖는 열개의 파쇄장비 모델들 중 최적 모델 선정을 위한 방법과 신뢰성)

  • Leem Young Moon;Hwang Young Seob
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.1
    • /
    • pp.159-166
    • /
    • 2005
  • It is not difficult to see the road repairing. There are many and various machines which crush road surface. The efficiency and power of the machine depend on crushing head-shape, crushing interval, crushing load, crushing stress, machine's dropping height and roller's kind. The objective of this study is to select the optimal model among ten models of crushing machine with constraints such as crushing depth, variation, and crushed particle size. And then this paper provides the valid theoretical base on selected model. The data for this study are chosen from the site of construction in Kangnung during three months (2004. 6. 1${\~}$2004. 8. 31). The provided methodology in this paper will be fruitful not only for the selection of crushing machine but also for the aspects of construction period, cost, work efficacy according to the condition from the various sites of construction.