• Title/Summary/Keyword: road collapse

Search Result 83, Processing Time 0.02 seconds

The Hazard Grade Classification Criterion using Character of Collapsed Cut Slope by Rainfall (강우에 의해 붕괴된 절토사면의 특성을 이용한 절토사면 위험등급 분류기준)

  • Yoo, Ki-Jeong;Koo, Ho-Bon;Baek, Yong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.600-605
    • /
    • 2004
  • The road construction with horizontal expansion of country using and augmentation of traffic demand is advanced actively and it accompanies hereupon, the above of 70% of the country is formed at the mountain in our country where the hazard cut slope has been created. In this study, It is prepared a effective management countermeasure of cut slope introduced priority investigation decision method against hazard cut slope which is influenced by abnormally rainfall by an unusual change in the weather such as a guerilla rainfall character. In meaning link, It was executed collapse cause by failure character analysis in the cut slope which has failed for the last five years and it is prepared the hazard grade criterion from E to A grade according to collapse cause. It is decided that a maintenance management grade by the hazard grade classification criterion of cut slope. So It is possible to hazard cut slope. It is established failure protection counter countermeasure by effective maintenance management through the hazard grade c1assification criterion and it will be able to dispose to advanced nation level like Hong Kong and Japanese.

  • PDF

A Study on Evaluation Model Developement for Investigation Priority Decision for Road Cutting Slopes Using Analytic Hierarchy Process (AHP를 이용한 도로절토사면의 조사우선순위 결정을 위한 평가모델 개발에 관한 연구)

  • Shin, Chang-Gun;Sung, Hyun-Jong;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.4
    • /
    • pp.107-114
    • /
    • 2008
  • Currently, each managing agencies are enforcing the maintenance against the cutting slopes, but the universality and objectivity are insufficient, because the evaluation item and model are various, the access method is not mutual-supplementary. Consequently, this study will lead the approach for a rational model development, by the analysis against the existing cutting slope evaluation technique, excavate a collapse primary reason and a factor, by the collapse example analysis, and make out evaluation table to decide a investigation priority of the existing cutting slope in the Investigation Evaluation step using AHP.

A Case Study on Collapsed Geosynthetic Reinforced Segmental Retaining Wall (블록식 보강토옹벽의 붕괴사례 연구)

  • Kim, Byoung-Il;Yoo, Wan-Kyu;Kim, Kyeong-Mo;Lee, Bong-Yeol
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.4
    • /
    • pp.2006-2012
    • /
    • 2013
  • This case study deal with the investigation of various causes and analyses concerning the cases of the collapse of reinforced segmental retaining walls installed for newly constructing a peripheral road within the campus of ${\bigcirc}{\bigcirc}$ University located in Gyeonggi-do. As results of stability analyses and reviewing of design documents concerning collapsed reinforced segmental retaining walls, such a collapse appeared because of problems related to construction including poor-compacted backfill, the omission of the investigation on the bearing capacity, the length and space in the installation of reinforced materials, and drainage systems. Also, problems during diverse types of designing were confirmed involving the stability analysis of the entire slope stability to be considered during designing and failure in application of the proposed methods of FHWA or NCMA which are generally used for two-tier reinforced segmental retaining walls. In addition, based on these details of the stability assessment, the study proposed reinforcement solutions and construction methods for stabilizing reinforced segmental retaining walls to be reconstructed in the future.

Characteristics of Grain Size Distribution of River Flooding Sediments in Ibang-myeon, Changnyeong and their Meaning (창녕 이방면 하천범람 퇴적물 입도분포 특성 및 그 의미)

  • Han, Min;Yang, Dong-Yoon;Lim, Jaesoo;Nahm, Wook-Hyun
    • Journal of The Geomorphological Association of Korea
    • /
    • v.27 no.3
    • /
    • pp.13-24
    • /
    • 2020
  • This study analyzed the characteristics of the grain size distribution of the sediments obtained from the flooding in Ibang-myeon, Changnyeong-gun, which was caused by the collapse of a embarkment on the Nakdong River on August 9, 2020. As a results, it was found that the mean grain size decreases and the sorting becomes poorer as the distance from the embarkment collapse point increases. This is attributed to the fact that the transport energy of the river decreases when flooding occurs, ensuring that coarse-grained sediments are deposited first. Further, as the transport energy further reduces and becomes dispersed, the sorting for the fine-grained sediments becomes poor. Considering the characteristics of spatial distribution, sediments along the farm road showed the properties of floodplain deposits that transport to natural levee and back swamp due to river flooding. On the other hand, sediments along the irrigation ditch exhibited the properties of the deposits that are carried by the flow backward of ditch from the river after the collapse of the embarkment. The results of this study are significant because characteristics of flood sediments were elucidated for major rivers where flooding rarely occurs due to the recently built artificial structures. In addition, by applying the grain size distribution characteristics of present river flood sediments, it will be able to contribute to clarifying the sedimentary environments of the paleo river flood deposits.

Analysis on Surface Collapse of the Road NATM Tunnel through the Weathered Rock (풍화대를 통과하는 도로 NATM 터널의 천단부 함몰에 대한 연구)

  • Shin, Eun-Chul;Yoo, Jai-Sung
    • Journal of the Korean Geosynthetics Society
    • /
    • v.15 no.2
    • /
    • pp.55-64
    • /
    • 2016
  • The construction of the road NATM tunnel, which undergoes the weathered zone of the mountain, was in process with the reinforcement methods such as the rock bolt, shotcrete depositing, and the multi step grout with large diameter steel pipe. The collapse from the ceiling, and on the ground surface area(sink hole), of which were measured to be 25m from the ground surface($V=12m(W){\times}14m(L){\times}5m(H)=840m^3$), as well as excessive displacements in the tunnel, had occurred. In order to execute the necessary reconstruction work, the causes of the surface collapses were inspected through the field investigation, in-situ tests, and numerical analysis. As a result, several proper solutions were suggested for both internal and external reinforcements for the tunnel. As a result of numerical analysis, the collapsed zone of the tunnel was reinforced up to 0.5D~1.0D laterally by the cement grouting on the ground surface, 0.5D longitudinally by the multi step grout with large diameter steel pipe in tunnel. With further reinforcement implemented by rebars in lining, the forward horizontal boring was executed to the rest of the tunnel to evaluate the overall status of the tunnel face. Appropriate reinforcement methods were provided if needed.

A Preliminary Study for Assessing the Risk of Road Collapse Using Accelerated Pavement Testing (도로함몰 위험도 평가를 위한 실대형 포장가속시험 기초 연구)

  • Park, Hee Mun;Kim, Yeon Tae;Choi, Ji Young;Kim, Ki Hyun
    • International Journal of Highway Engineering
    • /
    • v.18 no.5
    • /
    • pp.57-62
    • /
    • 2016
  • PURPOSES : The objective of this study is to evaluate the effect of size and depth of cavities on the pavement failure using the full-scale accelerated pavement testing. METHODS : A full-scale testbed was constructed by installing the artificial cavities at a depth of 0.3 m and 0.7 m from the pavement surface for accelerated pavement testing. The cavities were made of ice with a dimension of 0.5 m*0.5m*0.3m, and the thickness of asphalt and base layer were 0.2 m and 0.3 m, respectively. The ground penetrating radar and endoscope testing were conducted to determine the shape and location of cavities. The falling weight deflectometer testing was also performed on the cavity and intact sections to estimate the difference of structural capacity between the two sections. A wheel loading of 80 kN was applied on the pavement section with a speed of 10 km/h in accelerated pavement testing. The permanent deformation was measured periodically at a given number of repetitions. The correlation between the depth and size of cavities and pavement failure was investigated using the accelerated pavement testing results. RESULTS : It is found from FWD testing that the center deflection of cavity section is 10% greater than that of the intact section, indicating the 25% reduction of modulus in subbase layer due to the occurrence of the cavity. The measured permanent deformation of the intact section is approximately 10 mm at 90,000 load repetitions. However, for a cavity section of 0.7 m depth, a permanent deformation of 30 mm was measured at 90,000 load repetitions, which is three times greater than that of the intact section. At cavity section of 0.3 m, the permanent deformation reached up to approximately 90 mm and an elliptical hole occurred at pavement surface after testing. CONCLUSIONS : This study is aimed at determining the pavement failure mechanism due to the occurrence of cavities under the pavement using accelerated pavement testing. In the future, the accelerated pavement testing will be conducted at a pavement section with different depths and sizes of cavities. Test results will be utilized to establish the criteria of risk in road collapse based on the various conditions.

An Study on Design Guidelines for Structural Fire Resistance of Road Tunnels (도로터널 구조물 내화설계기준 확립방안에 관한 연구)

  • Kim, Heung-Youl;Shin, Hyun-Jun;Yoo, Yong-Ho;Kim, Hyung-Jun
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2008.11a
    • /
    • pp.416-421
    • /
    • 2008
  • A growing number of larger and bigger tunnels are being constructed, along with the continuing enhancement of road design speed, thereby increasing the frequency of vehicles using tunnels. For such reasons, a fire in tunnels may lead to such situations. Gases and heat caused by fires are to be blamed for such disasters, as well as the development of vehicles leads to the construction of large tunnels. Therefore this study is to provide for the safety of public and rescue personnel in the event of a fire within the tunnel system. For these purpose, the tunnel system must be protected from collapse during a specified time period. This study introduced the role of ITA, it is to developed guidelines for techniques and materials to answer these structural requirements and make tunnels and their ancillary structures more resistant to fire damage.

  • PDF

The Analysis of Damage Characteristic and Cause on Infrastructures by Typhoon (시설물별 태풍에 따른 피해특성 및 원인분석)

  • Shin, Chang-Gun;Lee, Jong-Young;Kim, Seok-Jo;Ji, Young-Hwan
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.1602-1610
    • /
    • 2005
  • In this study was investigated and analyzed of damage characteristics for infrastructures by typhoon that have been many occur. The objective Structures were the road and hydraulic structure. The road structure was included the cut-slopes, retaining walls and bridges. The hydraulic structure is divided with the dike, small-scale dam, reservoir and floodgate. The analysis result of the bridge damage cause is river bottom height increase and passage ability decrease. The principal damage reasons of the cut-slope structure are weakening the ground due to the localized torrential downpour and drainage defective. Also, the principal damage reasons of the small-scale dam, reservoir, dike and the floodgate are continuous collapse of dike beside the floodgate.And we divided a typhoon damage occurrence cause with artificial and natural. As the result of analysis, the many damage occurrence cause will be removed by system improvement and technical development.

  • PDF

DEVELOPMENT OF PERFORMANCE MEASURES IN ASSET MANAGERMENT FOR BRIDGE MANAGEMENT IN KOREA

  • Cheolwoo Park;Kyung-Hoon Park;Min-Jae Lee;Jung-Sik Kong;Yoon-Koog Hwang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1166-1169
    • /
    • 2009
  • Bridges are exposed to very severe environment and experience, as service life increased, elevated traffic load and traffic flow, in addition to natural disasters. In comparing to other road structures, bridges may cause more significant damage, such as human-involved accidents, to the society in the event of collapse. A certain level of service shall be necessarily secured to assure the minimum safety of users. The cost for manage and preserve bridges will increase gradually and more restrictions will be loaded to efficiently distribute the limited resources, such as monetary budget and human resource etc. In order to enhance performance and serviceability of bridges with the limited resource, asset management technique has been applied into the bridge management system, which capitalizes the road infrastructures including bridges and assess them in accordance with the government finance report. In the application of asset management, there must be a tool for assess the performance of bridges and this study introduces the basic information on the definition and role of performance measures for asset management for bridges. This research suggests future development direction of performance measure for asset management for bridges in Korea.

  • PDF

Applications of Improved Low-Flow Mortar Type Grouting Method for Road Safety and Constructability in Dangerous Steep Slopes (급경사지 붕괴 위험지역의 도로 안전 및 시공성을 고려한 개선된 저유동 몰탈형 그라우팅공법 적용성 분석)

  • Choi, Gisung;Kim, Seokhyun;Kim, Nakseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.4
    • /
    • pp.409-415
    • /
    • 2020
  • Low-flow mortar injection method grouting technology was selected and the traffic area was preserved as much as possible in order to secure safety for road traffic when the outflow and subsidence of landfill occurred due to ground-water, and etc. In particular, the current existing method was newly improved since there are risks of damage such as hydraulic fracturing at the lower part of the road, spilling of soil particles on steep slopes, and bumps on the road due to excessive injection pressure during construction. This study was carried out at the site of reinforcement work on the road as a maintenance work for the danger zone for collapse of the steep slope of the 00 hill, which was ordered from the 00 city 00 province. The improved low-flow mortar type grouting method adopted a new automated grouting management system and especially, it composites the method for grouting conditions decision by high-pressure pre-grouting test and injection technology by AGS-controlled and studied about grouting effect analysis by using new technology. By applying the improved low-flow mortar type grouting method, it was possible to lay the groundwork for road maintenance work such as the prevention of subsidence of old roads, uneven subsidence of buildings and civil engineering structures, and of soil leakage of ground-water spills. Furthermore, the possibility of application on future grouting work not only for just construction that prevents subsidence of old roads but also for various buildings and civil engineering structures such as railroads, subways, bridges, underground structures, and boulder stone and limestone areas was confirmed.