• Title/Summary/Keyword: river load

Search Result 496, Processing Time 0.029 seconds

Development and Application of Coliform Load Duration Curve for the Geum River (금강에 대한 대장균 부하 지속곡선의 개발 및 적용)

  • Kim, Geonha;Yoon, Jaeyoung
    • Journal of Korean Society on Water Environment
    • /
    • v.21 no.5
    • /
    • pp.516-519
    • /
    • 2005
  • An useful protocol coiled load duration curve methodology to estimate contaminant loading to a river on an exceedance probability scale was developed in this research. The technique was further applied to estimate total coliform loading to the Geum River, using the daily mean flow rate and total coliform concentration data during January, 1996 and July, 2004 for the Gongju where an automated monitoring station is located. Drought flow of the Gongju (=50.3 cms) was equivalent to 40% on an exceedance probability scale. Load duration curve for total coliform loading at the Gongju was constructed. Standard duration curve was constructed with the water quality criteria for the class 2 (total coliform concentration = 1000 MPN/100 mL). By plotting load duration curve with standard duration curve, it could be revealed that water quality do not meet the desired water quality for 47% on an exceedance probability scale. If linearity between flow rate and coliform concentration is assumed, it can be interpretated that water quality exceeds desired criteria when average mean flow rate is over 51 cms.

Application of Load Duration Curve and Estimation of Delivery Ratio by Flow Durations Using Discharge-Load Rating Curve at Jiseok Stream Watershed (유량-부하량관계식을 이용한 지석천 유역의 부하지속곡선 적용 및 유황별 유달율 산정)

  • Park, Jinhwan;Kim, Kapsoon;Hwang, Kyungsup;Lee, Yongwoon;Lim, Byungjin
    • Journal of Korean Society on Water Environment
    • /
    • v.29 no.4
    • /
    • pp.523-530
    • /
    • 2013
  • This study has been carried out to clarify the characteristics of discharge and pollutant loading according to flow conditions at jiseok stream watershed (JSW). A flow rate and pollutant load in the study watershed were estimated by equation of stage-discharge and discharge-loads rating curve. By using the methods above, I've evaluated the water quality (WQ) of the JSW if it is satisfied with the standard target. I've collected the data of BOD and T-P from the JSW every 8 days for the duration of 12 months. And then, I've schematized the data upon the load duration curve and the results showed me that the WQ of JSW was satisfied with the standard target. I've also collected the same data every each day for the duration of 12 months from JSW and have schematized the data again. And the results showed that it also was satisfied with the standard target. To be concluded, I've determined that point pollution sources of JSW gives more significant impacts to the WQ than non-point pollution sources of JSW and hence, as time goes, point pollution sources will keep depriciating the WQ of JSW. Therefore, further efforts will be required to JSW to maintain the WQ.

GIS Application for Rural Water Quality Management (농촌소유역 하천수질관리를 위한 GIS응용)

  • 김성준
    • Spatial Information Research
    • /
    • v.4 no.2
    • /
    • pp.147-157
    • /
    • 1996
  • A rural water quality management information system(RWQMIS) by integrating Geo¬graphic Information System(GIS) with the existing models (pollutants transport and river water quality) is described. A simple pollutant load model to calculate delivered pollutants to stream, Tank model to generate daily runoff and QUAL2E model to predict river water quality, were incorporated into GIS. The system was applied to $80km^2$ watershed in Icheon Gun and Yongin Gun, Kyonggi Do. The spatial distributions of produced pollutant load, discharged pollutant load, delivered ratio to the stream, and the river water quality status for given sites were successfully generated.

  • PDF

Design Specifications of Cable Stayed Bridge Across Chambal River (참발강 횡단 사장교의 설계기준)

  • Kim, Mo-Seh;Yoo, Jun-Yeol;Cho, Eu-Kyeong;Lee, Sang-Min
    • Magazine of the Korea Concrete Institute
    • /
    • v.20 no.6
    • /
    • pp.41-46
    • /
    • 2008
  • The bridge across Chambal River consists of two approach bridges and a cable stayed bridge with concrete girder and pylon. And the main bridge has been designed mainly based on AASHTO LRFD. This article covers design specifications from AASHTO LRFD, which are applied to load combinations and structural verification. And it also covers local standards applied in definition of loads such as live load, wind load, temperature, etc. In addition, the difference between applied design specifications and Korean standards is mentioned in this article briefly.

Evaluation of Effective Rainfall Ratio Method for Estimating Unit Load from Paddy Fields (비우량 방법에 의한 논 오염부하 원단위 산정시 적용성 평가)

  • Jung, Jae-Woon;Yoon, Kwang-Sik;Yoon, Suk-Gun;Choi, Woo-Jung;Choi, Woo-Young;Huh, Yu-Jeong;Cho, Kyeong-Min;Hong, Jung-Jin
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.6
    • /
    • pp.849-854
    • /
    • 2009
  • Pollutant unit load (unit-load) reported by Ministry of Environment (MOE) in 1995 has been a useful method for watershed management and environmental policy decision. The unit-load has been estimated using effective rainfall ratio method. However, reliability of unit-load determined by the method has been criticized especially for paddy field and upland conditions. In this paper the unit-load of paddy field estimated by effective rainfall ratio method was compared with continuous monitoring data. Annual loads was simulated by the method choosing 5~6 storm events randomly from whole events collected. Probability distribution of difference between results by the method and measured data was investigated. The results showed that unit-load derived by the method was generally lesser than measured unit-load and showed wide variations. Therefore, unit-load estimation of paddy fields by effective rainfall ratio method need caution.

Spatial and Temporal Variation Characteristics between Water Quality and Pollutant Loads of Yeong-il Bau(I) - Seasonal Variation of River Discharge and Inflowing Pollutant Loads - (영일만 유입오염부하량과 수질의 시ㆍ공간적 변동특성(I) - 하천유량과 유입오염부하량의 계절변동 -)

  • 윤한삼;이인철;류청로
    • Journal of Ocean Engineering and Technology
    • /
    • v.17 no.4
    • /
    • pp.23-30
    • /
    • 2003
  • This study investigates the seasonal variation and spatial distribution characteristics of pollutant load, as executing the quality valuation of pollutant load inflowing into Yeong-il Bay from on-land including the Hyeong-san River. Annual total pollutant generating rate from Yeong-il Bay region are 202ton-BOD/day, 620ton-SS/day, 42ton-TN/day, and 16ton-TP/day, respectively. Particularly, the generating ration of the pollutant loads from the Hyeong-san River is greater than that of any other watershed of the Yeong-il Bay, of which BOd is about 78.2%, SS 88.5%, T-N 62.5%, T-P 73.1%, As calculating Tank model with input value of daily precipitation and evaporation of 2001 year in drainage basin of the Hyeong-san River, the estimated result of the annual river discharge effluence from this river is 830106㎥, As a result to estimating annual effluence rate outflowing at the rivers from each drainage basin. annual inflow pollutant rates are 10,633ton-BOD/year, 19,302ton-SS/year, 15,369ton-TN/year, 305ton-TP/year, respectively. The population congestion region of the Pohang-city is a greater source of pollutant loads than the Neang-Chun region with wide drainage area. Therefore, the quantity of TN inflowing into Yeong-il Bay is much more than T-P. The accumulation of pollutant load effluenced from on-land will happen at the inner coast region of Yeon-il Bay. Finally, We would make a prediction that the water quality will take a bad turn.

Selection of Priority Management Target Tributary for Effective Watershed Management in Nam-River Mid-watershed (남강 중권역의 효율적인 유역관리를 위한 중점관리 대상지류 선정)

  • Jung, Kang-Young;Kim, Gyeong-Hoon;Lee, Jae-Woon;Lee, In Jung;Yoon, Jong-Su;Lee, Kyung-Lak;Im, Tae-Hyo
    • Journal of Korean Society on Water Environment
    • /
    • v.29 no.4
    • /
    • pp.514-522
    • /
    • 2013
  • The major 24 tributaries in Nam-River mid-watershed were monitored for discharge and water quality in order to understand the characteristics of the watershed and to select the tributary catchment for improving water quality. According to the analytical results of discharge and water quality monitoring data of 24 tributaries, the mean value of discharge below $0.1m^3/s$ was 62.5% among the monitored tributaries and it mostly exceeded the water quality standards of Nam-river mid-watershed ($BOD_5$ = 3 mg/L, T-P = 0.1 mg/L over). According to the stream grouping method and the water quality delivery load density ($kg/day/km^2$) based on the results of tributary discharge and water quality monitoring, the tributary watersheds for improving the water quality were selected. In the Nam-River mid-watershed, tributaries in the GaJwaCheon, HaChonCheon catchment (Group D, $BOD_5$ = 3 mg/L over) and in the UirYeongCheon, SeokGyoCheon catchment (Group A, T-P = 0.1 mg/L over), which have a small flow (and/or large flow) and a high concentrations of water pollutants. The various water quality improving scheme for tributaries, in accordance with the reduction of potential point source pollution by living sewage and livestock wastewater, should be established and implemented.

Pollutant Load Characterization with Flow Conditions in Heukcheon Stream (흑천의 유량조건별 오염부하량 특성)

  • Choi, Kyungwan;Lee, Sangwon;Noh, Changwan;Lee, Jaekwan;Lee, Youngjoon
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.29 no.5
    • /
    • pp.551-557
    • /
    • 2015
  • The TMDL (Total Maximum Daily Load) has been used to determine the water quality target. LDC (Load Duration Curve) based on hydrology has been used to support water quality assessments and development of TMDL. Also FDC (Flow Duration Curve) analysis can be used as a general indicator of hydrologic condition. The LDC is developed by multiplying FDC with the numeric water quality target of the factor for the pollutant of concern. Therefore, this study was to create LDC using the stream flow data and numeric water quality target of BOD and T-P in order to evaluate the pollutant load characterization by flow conditions in Heukcheon stream. When it is to be a high-flows condition, BOD and T-P are necessary to manage. BOD and T-P did not satisfy the numeric water quality target for both seasons (spring and summer). In order to meet the numeric water quality target in Heukcheon stream, management of non point source pollutant is much more important than that of point source pollutant control.

The hydrologic flux of SS, TN and TP in Nakdong River Basin (낙동강 유역 SS, TN, TP 수문학적 플럭스)

  • Lee, Ayeon;Choi, Daegyu;Kim, Tae-Woong;Kim, Sangdan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6B
    • /
    • pp.551-560
    • /
    • 2010
  • This study presents the export of constituent transport loads through a river system. The proposed constituent transport load estimating procedure can be operated with the on-going Korean TMDL monitoring system. This study firstly discusses the use of a hydrologic simulation model (TANK) to estimate stream-flow for the 40 sub-catchments. Model parameters are estimated from 8-days intervals flow data which has been monitored by NIER since 2004. Constituent transport loads are estimated with the 7-parameter log linear model whose parameters are estimated by the minimum variance unbiased estimator. Results from Nakdong river basin reveals that the proposed procedure provides satisfactory TN, TP and SS transport load estimates. As an application, a representative load duration curve is derived to represent the overall hydrologic flux of TN, TP and SS at Nakdong river basin.

The Review of the Adequacy for the Estimation Formula of Existence Sediment Loads m the River of Gangwon - Province (Focused on Local River) (강원도 하천의 기존유사량 산정공식의 적정성 검토 (지방하천을 중심으로))

  • Choi, Han-Kuy;Lee, Woon-Bae;Park, Soo-Jin
    • Journal of Industrial Technology
    • /
    • v.28 no.B
    • /
    • pp.175-183
    • /
    • 2008
  • This study reviewed and compared the measured value with the calculated sediment loads value by the existing theory equation, after actually measuring the suspended load, focusing on locality river in Gangwon province. Next, it suggested the application problems of the existing sediment loads calculation equation in case of rivers in Gangwon province, and suggested the proper sediment loads calculation equation to rivers in Gangwon province, after implementing the statistical regression analysis by using the measured data for 5 rears, 2003 ~ 2007.

  • PDF