Pollutant Load Characterization with Flow Conditions in Heukcheon Stream |
Choi, Kyungwan
(Han-River Environment Research Center, National Institute of Environmental Research)
Lee, Sangwon (Han-River Environment Research Center, National Institute of Environmental Research) Noh, Changwan (Han-River Environment Research Center, National Institute of Environmental Research) Lee, Jaekwan (Han-River Environment Research Center, National Institute of Environmental Research) Lee, Youngjoon (Han-River Environment Research Center, National Institute of Environmental Research) |
1 | Cleland, B. R. (2003). TMDL Development from the "Bottom Up"-Part III: Duration Curves and Wet-Weather Assessments. National TMDL Science and Policy 2003-WEF Specialty Conference, Chicago, IL. |
2 | Han River Flood Control Office. http://www.hrfco.go.kr/. |
3 | Han, S. H., Shin, H. S. and Kim, S. D. (2007). Applicability of Load Duration Curve to Nakdong River Watershed Management. Journal of Korean Society on Water Quality. 23(5), pp.620-627. |
4 | Hwang, H. S., Yoon, C. G. and Kim, J. T. (2010). Application Load Duration Curve for Evaluation of Impaired Watershed at TMDL Unit Watershed in Korea. Journal of Korean Society on Water Quality. 26(6), pp.903-909. |
5 | Hwang, H. S., Park, B. K., Kim, Y. S., Park, K. J., Cheon, S. U. and Lee, S. J. (2011) Research on the Applicability of the Load Duration Curve to Evaluate the Achievement of Target Water Quality in the Watershed for a TMDL. Journal of Korean Society on Water Quality. 27(6), pp.885-895. |
6 | Kim, K. B. (2010). Assessment of Climate Change Impact on Water Quality Simulation for the Basin of Heuk Stream, Master's degree, Han-Kyung University. |
7 | Korea Meteorological Administration. http://www.kma.go.kr/. |
8 | Ministry of Environment. (2007). Standard Method for Examination of Water. |
9 | Ministry of Environment. (2013). The Target Water Quality for Total Amount Management at Boundary Point in Kyunggido of Han-River Watershed. |
10 | Min, K. H. (2014). Rainfall Network Design in Nakdong River Watershed By Areal Rainfall Estimation Methods, Master's degree, In-Ha University. |
11 | Nebraska Department of Environmental Quality Planning Unit(NDEQ), Water Quality Division (2004). Total Maximum Daily Loads for the Big Blue River Basin. |
12 | Nevada Division of Environmental Protection(NDEP), (2003). Load Duration Curve Methodology for Assessment and TMDL Development. |
13 | Park, J. H. (2010). A Study of Waterbody Health Diagnosis Method Master's degree, Kyungpook University. |
14 | U.S. EPA. Office of Wetlands, Oceans and Watersheds. (2007). An Approach for Using Load Duration Curves in the Development of TMDLs. |
15 | Yoon, S. Y., Ryu, J. N. and Oh, J. I. (2013). Water Quality Management Measures for TMDL Unit Watershed Using Load Duration Curve, Journal of Korean Society of Water and Wastewater, 27(4), pp.429-438. DOI |