• 제목/요약/키워드: river improvement projects

검색결과 40건 처리시간 0.024초

Approach for International Exchange of River Restoration Technology

  • Kazumasa, Ito
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2006년도 학술발표회 논문집
    • /
    • pp.45-50
    • /
    • 2006
  • About 50% of the population and 75% of the properties concentrate on the flood plain in Japan. The rivers have intimate relationship with our lives. Those conditions have been seen after modern river improvement projects that began about a century ago. The technology which was introduced from foreign countries was improved in conformity with geographical features and the climate condition of our nation, and has redeveloped as a Japanese original technology. In 1940's, Japan had serious natural disasters that were caused by large- scale typhoons. Those typhoons wiped out everything completely. Even though the government realized the importance of flood control and management after those natural disasters, civil work still aimed to economic development. Those construction works have become the one of factors for concentrating population and degrading natural environment in urban areas. Deterioration of river environment has become serious issue in urban development and main cause of pollution. The approaches for environmental restorations which were started about 30 years ago aimed to harmonize with nature environment and cities and human lives. There have been going on many projects called 'river environmental improvement projects', the 'nature friendly river works' and 'natural restoration projects.' The society has tried to find a way to live in harmony with nature. As for societies symbiotic with habitats will form the safe country in the history and the spectacle. Such as the symbiotic of the river or the basin where discharge, water quality, nature, the history, landscape, the local society and also for culture were built in is achieved. Examples of working, applied to restoration technologies and the one to describe the mechanism construction are been shown in the paper. Furthermore, write for an international spread of the river technology of Japan to attempt.

  • PDF

공공 도로건설사업에서의 설계도서 납품체계 개선방안에 관한 연구 (A Study on Improvement Measures for the Design Documents Delivery System in Public Road Construction Projects)

  • 옥현;김성진;김태학;주기범
    • 한국도로학회논문집
    • /
    • 제20권2호
    • /
    • pp.45-55
    • /
    • 2018
  • PURPOSES : This study aims to survey and analyze the status of the design and completion documents output delivery system in public construction projects in order to assess the problems of the Ministry of Land, Infrastructure and Transport (MOLIT)'s electronic delivery system, with a focus on roads and rivers, and to offer improvement measures. METHODS : This study first surveys and analyzes laws and existing study trends with regard to the design and completion documents output delivery system in public construction projects. It further analyzes the status of the output delivery system in public construction projects, including roads, rivers, expressways, water resources, and railroads. In addition, a comparative analysis of the current electronic delivery system of MOLIT and Korea Expressway Corporation in the road field is conducted, and the problems and improvement measures for MOLIT's electronic output delivery system are presented. This study seeks to analyze problems and prepare improvement measures with regard to road and river public construction projects, as ordered by MOLIT's five regional offices. RESULTS : This study sought to prepare the electronic output delivery system with regard to public construction projects and present the analysis of its major problems and improvement measures in four categories: "the preparation of electronic design documents output delivery system improvement measures including inspection and delivery," "preparation of guidelines, systems, etc., concerning electronic design documents," "preparation of improvement measures for the construction project management system and electronic design document support tools", and "linking of MOLIT's electronic output delivery system with relevant agencies and the expansion thereof to local governments." CONCLUSIONS : This study analyzed the current status and problems of the MOLIT's electronic output delivery system in the field of road and river construction projects, and presented corresponding improvement measures. This study is expected to address the problems of the MOLIT's electronic output delivery system, and to provide the foundation for the preparation of an efficient electronic output delivery system for design and completion documents. In addition, this study is expected to boost the quality and utilization of the electronic design documents output, and to exchange, share, and link construction information among relevant agencies so as to prepare the foundation for sharing construction information.

국가하천사업 사후 평가를 위한 세부지표 개선 및 방법론 적용 (Improvement of Detailed Indicators and Application of Methodology for Post-Evaluation of National River Project)

  • 장초록;장문엽;송주일;김한태
    • 한국산학기술학회논문지
    • /
    • 제22권1호
    • /
    • pp.188-196
    • /
    • 2021
  • 우리나라는 국가하천 관련 사업들에 많은 투자를 하고 있으나 하천사업이 완료된 후 사업의 실효성을 평가할 수 있는 평가기법이나 하천사업을 관리할 수 있는 시스템은 부재한 실정이다. 평가기법과 시스템의 부재로 하천공사구간 정보, 사업효과 분석, 사업 간 벤치마킹 등의 불가로 이어진다. 이는 동일 구간 유사사업 수행으로 인한 예산의 과잉, 중복투자 문제를 야기할 수 있으며 잘못된 사업요소가 반복적으로 활용될 수 있다. 이러한 평가기법 및 시스템의 부재를 해결하고자 본 연구에서는 하천사업 평가기법 개발 및 하천사업(공사)관리시스템 개발을 진행하였다. 평가기법의 개발은 사업 간의 비교·분석을 가능하게 하며, 유지관리 계획 수립 시 활용될 수 있다. 또한 시스템을 통해 공사정보 조회 및 공사구간의 시각화, 성과품 관리 등을 제공할 수 있다. 본 연구에서는 선행연구를 통해 개발한 하천사업 평가기법을 수정·보완하였으며, 낙동강수계 국가하천인 A하천 ◯◯지구, B하천 △△지구 하천환경정비사업에 적용을 통해 실효성을 검증하였다. 또한 하천사업(공사)의 공정관리, 예산관리 등을 위한 시스템 구성(안)을 제시하였다. 본 연구에서 제시한 평가기법 및 시스템 활용방안을 통해 하천사업의 업무효율성 증대와 하천사업의 효율성을 제고할 수 있을 것으로 기대한다.

피라미에 대한 보 철거 구간에서의 물리서식처 모의(PHABSIM) 적용 (Application of Physical Habitat Simulation System (PHABSIM) in the Reach of Small Dam Removal for Zacco platypus)

  • 임동균;정상화;안홍규;김규호
    • 한국수자원학회논문집
    • /
    • 제40권11호
    • /
    • pp.909-920
    • /
    • 2007
  • 하천환경에 대한 사회적 요구에 의해 다양한 하천 복원 및 환경개선사업이 진행되고 있으므로, 이와 같은 사업의 효과를 평가할 방법론이 제공되어야 한다. PHABSIM은 하천 흐름과 관련되어 있는 수생 생물의 수리적 서식처 적합도를 평가하기 위해 제안된 방법이다. 본 연구에서는 보 철거 구간에 PHABSIM을 적용하여, 보 철거에 따른 피라미의 물리서식처 변화와 모형의 적절성을 평가하였다. 그 결과 일반적으로 보를 철거할 경우가 존치할 때보다 물리서식처가 향상된 것으로 나타났다. 그러나 유영력이 약한 산란기의 물리서식처는 보 상류의 유속이 증가되어 감소하는 것으로 나타났으며, 이에 대한 적절한 대책이 필요하다. 본 연구에 적용한 PHABSIM은 보 철거 사업을 포한한 다양한 하천사업의 평가와 필요성을 제시하는 효과적인 방법으로 활용될 수 있을 것이다.

An improvement on the concrete exothermic models considering self-temperature duration

  • Zhu, Zhenyang;Chen, Weimin;Qiang, Sheng;Zhang, Guoxin;Liu, Youzhi
    • Computers and Concrete
    • /
    • 제19권6호
    • /
    • pp.659-666
    • /
    • 2017
  • Based on the Arrhenius equations, several hydration exothermic models that precisely calculate the influence of concrete's self-temperature duration on its hydration exothermic rate have been presented. However, the models' convergence is difficult to achieve when applied to engineering projects, especially when the activation energy of the Arrhenius equation is precisely considered. Thus, the models' convergence performance should be improved. To solve this problem and apply the model to engineering projects, the relationship between fast iteration and proper expression forms of the adiabatic temperature rise, the coupling relationship between the pipe-cooling and hydration exothermic models, and the influence of concrete's self-temperature duration on its mechanical properties were studied. Based on these results, the rapid convergence of the hydration exothermic model and its coupling with pipe-cooling models were achieved. The calculation results for a particular engineering project show that the improved concrete hydration exothermic model and the corresponding mechanical model can be suitably applied to engineering projects.

ACCURACY IMPROVEMENT OF AN APPROXIMATE COST ESTIMATING MODEL FOR RIVER FACILITY CONSTRUCTION

  • Siwook Lee;Sungkwon Woo;Jeongyoon Lee;Inwook Choi
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1201-1208
    • /
    • 2009
  • A making a decision of construction cost has important meaning and function for both contractor and owner in construction projects. Especially, it should be premised that estimating the construction cost in efficient and rational way in public construction, which is invested by government funds, for efficient execution of the budget and investment as a side of government. The systematic methodology for estimating construction cost approximately of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. On this study, It collect and analyze a river facility construction historical cost data for develop an approximate cost estimating model for river applied by typical embankment section method and rate application of the others activity type. And it verify suitability of model through a that result of application of real river facility construction statement at developed model. By this study, it is expected to reasonable and systematic estimating construction cost through application of developed model.

  • PDF

전천후농업용수원 개발을 위한 중요하천 수계별 기본조사의 실시 (Basic Investigation on the Water Resource Development of the Principal Riever Basins for All Weather Farming)

  • 임은진
    • 한국농공학회지
    • /
    • 제9권2호
    • /
    • pp.1291-1295
    • /
    • 1967
  • This paper is a brief description on the task of the basic investigation of the water resource development of the principal river basins in this country for all- weather farming. In order to show how the people in the nation can best be benefited by further development of the water resources of the basins, this paper includes a description of the in individual basin's resource, its needs and problems, and its present and future development of the water resources within the natural drainage basin of the rivers are listed and their over-all results are summarised in the investigation report and separately filled. It is hoped that the government should continue and expand its detailed investigations of potential projects within the each principal river basin to obtain adequate information by which the Union of Land improvement Association can formulate a comprehensive plan for use of all the water resources of the basin's and select and recommend projects for successive stages of development.

  • PDF

영산강·섬진강 수계 효율적 물관리를 위한 유역관리 시스템 구축 (Establishment of Watershed Management System for Efficient Water Management in the Yeongsan and Seomjin River Basin)

  • 정희정;정재운;김갑순;박하나;임병진;허유정;이준배
    • 한국환경농학회지
    • /
    • 제31권2호
    • /
    • pp.200-204
    • /
    • 2012
  • BACKGROUND: Recently, the project for improvement of water quality and preservation of the Yeongsan and Seomjin river basin was actively promoted. However, the publicity for many results of the project is not actively done, thus they are rarely used. Furthermore, there are not sufficient information about the projects preformed by other research institutions. Therefore, the watershed management system for efficient water management is needed in the Yeongsan and Seomjin river basin. CONCLUSION: Firstly, establishment of the Yeongsan and Seomjin river basin management research center, Secondly, construciton of wed-based water management research network. These results will serve as a basic data for efficient water management.

한강유역 환경보전 종합계획 사업의 개요 (The Outline of Han River Basin Environmental master Plan Project)

  • 이선환
    • 기술사
    • /
    • 제15권1호
    • /
    • pp.46-50
    • /
    • 1982
  • Following rapid industrial development and urbanization in Korea, there is a need for the Government to implement effective control of pollution and to undertake specific schemes in areas where pollution of the environment is severe. In response to this need, Government of Korea prepare Han River Basin Environmental Master Plan Project for water, air, solid waste to cover environmental protection of the Han River Basin. The Project area is approximately 27,000 sq. Km extending over Seoul, Kyunggi, Kwangwon, Chungbuk Province. The total population of Master Plan Project area is approximately 11.6 million, or one-third of the total population of Korea. There are about 8,000 industries, including those located in 16 industrial complexes, in the project area. The scope of work and terms of reference are the following: (1) A Summary of existing land use and forecasts for changes in land use by the year 2,000. (2) Emission inventories for air, waste water, and solid wastes. (3) Forecasts of future population growth patterns and pollution loadings. (4) Identification of specific projects needs to reduce pollution levels and satisfy the environmental quality standards. (5) A Program of enforcement to include (i) self monitoring, and (ii) governmental inspections and surveillance. (6) A program for quality improvement and quality assurance of environmental measurements. (7) Reports summarizing all data collected analyzed during the study. (8) Conceptual design and feasibility studies, including cost estimates, for needed pollution control projects. (9) A financial plan for future detailed design and construction of public facilities, for financial incentives to industry, and for user charges for industrial use of public treatment of disposal works.

  • PDF

부산 점토의 퇴적 특성, 피압의 영향 및 지반 개량에서 얻은 경험 (Depositional Characteristics of Busan Clay, Effects of Artesian Pressure, and Experiences from Ground Improvement)

  • 김상규
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2007년 가을학술발표회
    • /
    • pp.3-38
    • /
    • 2007
  • The depositional characteristics of Busan clay are initially described in this paper. The deposits of the Nakdong River estuary are composed of some different layers, which have been affected by marine transgression and regression. The upper clay layer is thick and soft. The lower clay layer and some depth of the upper clay layer have been leached by artesian pressure existing in an aquifer below. The clay shows unique physical and engineering characteristics due to leaching. Several large-scale reclamation projects have been performed in this delta area. The preloading method using long vertical drains has been applied for soft ground improvement. Experiences obtained from ground improvement are mentioned in connection with the depositional characteristics of the clay layers.

  • PDF