• Title/Summary/Keyword: risk management method

Search Result 1,577, Processing Time 0.032 seconds

Introduction of the STPA Mechanism to Derivation of Risk Scenarios for Establishment of Disaster Reduction Activity Plans (재해경감활동계획 수립에 위험 시나리오 도출을 위한 STPA기법 도입)

  • Kim, Sang Duk;Lee, Seok Hyung;Kim, Chang Soo
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.4
    • /
    • pp.784-795
    • /
    • 2020
  • Purpose: This study intends to review the risk assessment procedures specified in the corporate disaster management standard. Method: The requirements for each stage of risk assessment stipulated in the corporate disaster management standard were identified, the case of application of the organization'A' and the partner companies were reviewed, and the risk assessment procedure in line with the requirements was reviewed. Result: It was reviewed that it was necessary to clearly define the method and procedure for deriving risk scenarios, which are the requirements of the corporate disaster management standard, and to introduce a standardized procedure for deriving risk scenarios. Conclusion: A method of deriving risk scenarios was implemented by applying the STPA technique based on the system theory for power generation fuel supply and demand, and it was suggested that the STPA technique be reflected in corporate disaster management standards as a risk scenario derivation technique for the establishment of a disaster reduction activity plan.

Development of the Safety Management Risk Assessment Factors and Indicators for Coastal/Offshore Fishing Vessels (연근해어선의 안전관리 위험성평가 인자 및 지표개발)

  • Song, Byung-Hwa;Kim, Cheol-Seong
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.27 no.6
    • /
    • pp.783-788
    • /
    • 2021
  • Although the Korean government (Ministry of Ocean and Fisheries) and related organizations are enforcing many policies to improve the marine safety of vessels with weak safety management, the effectiveness of each policy is deficient due to the lack of a risk assessment method for ship safety management. Most previous studies in Korea of the risk assessment of ships only dealt with fragmentary risks of individual marine accident risks, so a new assessment method for comprehensive marine accident risk is needed. Examples of comprehensive risk assessments for ship safety management are the selection method for inspection targets by the Port State Control and the Norwegian Maritime Authority. In this study, indicators for the comprehensive risk assessment of ship safety management were developed for and applied to coastal/offshore fishing vessels that occupy a high proportion of the registrations and marine accidents in Korea. As a result, the risk of each ship was confirmed quantitatively, and a ranking of the weakness factors for ship safety management was identified.

Integrated Safety Risk Assessment and Response Preparation on Construction Site Formwork Using FMECA Method (FMECA 기법을 적용한 건설현장 거푸집작업의 통합 안전위험성 평가 및 대응방안 마련)

  • An, Sun-Ju;Song, Sang-Hoon
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.3
    • /
    • pp.39-48
    • /
    • 2012
  • Risk Assessment to list possible safety disasters and their probability and severity is the starting point for effective safety management on construction project site. However, the safety managers in owners, construction supervisors, contractors, and sub-contractors still have difficulties in judging the priorities of safety activities and preparing responses to each potential safety disasters. Therefore, this study aimed to suggest a systematic method in assessing safety risk prior to commencement with the agreement of stakeholders. FMECA(failure mode effects and criticality analysis) was selected as a main assessment tool and it was modified according to the characteristics of construction projects and trades. Each risk is, firstly, evaluated with occurrence probability, possible loss and impacts to projects, and detections, and then risk priority number(RPN) is calculated. Subsequently, the managers of each stakeholder discuss the types, timing, and responsibilities of responses as a group decision-making process.

A Risk Performance Measurement System for the Construction Project

  • Seon Gyoo Kim;Jin Bong Kim;Moon Serk Young;Bong Cheol Jeon;Han Kim;Young Jeong Yu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1591-1598
    • /
    • 2009
  • Recently, the researches on the urban regeneration projects have been performed very actively. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

  • PDF

Development of System Model for Risk Management (건설공사 리스크관리를 위한 모형 개발 연구)

  • Park Seo-Young;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.418-421
    • /
    • 2003
  • Most construction companies recognize the necessity of risk management. The practical application, however, is not easy because of the absence of systematic procedure for risk management and the difficulty in objectification of subjective risk factors. This study suggests a systematic procedure and a models. In the first place for those researches, this study analyzes the present condition of risk management in the construction industry. The developed model can be used as a risk management tool that enables evaluation of construction risk factors by quantified method, and it provides project managers with the methods to prevent risk and to deal with potential risk factors in the planning and construction phases. The results of this study could be used as references for related researches because this study attempts to develop a systematic tool for risk management including risk identification, risk analysis. risk action phases.

  • PDF

A Case Study on the Risk Management for the Long-term Preservation Business Activities Related to Electronic Records (전자기록 장기보존 위험관리 사례)

  • Yim, Jin-Hee
    • The Korean Journal of Archival Studies
    • /
    • no.39
    • /
    • pp.3-43
    • /
    • 2014
  • This paper showed results of the risk management project in detail which was conducted by National Archives of Korea(NAK) in 2010. In the project NAK examined its long-term preservation business of electronic records using DRAMBORA(Digital Repository Audit Method Based on Risk Assessment). NAK has defined 44 different risk elements related to its business activities, assessed and classified them into several grades according to the severity calculated by risk probability score and risk potential impact score, and developed precise management plans for two of the most serious risks. This paper introduced the management plan for one of them. The risk was numbered with NR04 and described by 'Loss of integrity of records information'. This paper explained mitigation strategies, contingency organization, disaster control responsibilities, and personal mission cards for the NR04. This paper planned to give comprehensive understandings to Records Management Organizations about the risk management approaches as an effective way for business management through the case study.

A two-step interval risk assessment method for water inrush during seaside tunnel excavation

  • Zhou, Binghua;Xue, Yiguo;Li, Zhiqiang;Gao, Haidong;Su, Maoxin;Qiu, Daohong;Kong, Fanmeng
    • Geomechanics and Engineering
    • /
    • v.28 no.6
    • /
    • pp.573-584
    • /
    • 2022
  • Water inrush may occur during seaside urban tunnel excavation. Various factors affect the water inrush, and the water inrush mechanism is complex. In this study, nine evaluation indices having potential effects on water inrush were analysed. Specifically, the geographic and geomorphic conditions, unfavourable geology, distance from the tunnel to sea, strength of the surrounding rock, groundwater level, tidal action, cyclical footage, grouting pressure, and grouting reinforced region were analysed. Furthermore, a two-step interval risk assessment method for water inrush management during seaside urban tunnel excavation was developed by a multi-index system and interval risk assessment comprised of an interval analytic hierarchy process, fuzzy comprehensive evaluation, and relative superiority analysis. The novel assessment method was applied to the Haicang Tunnel successfully. A preliminary interval risk assessment method for water inrush was performed based on engineering geological conditions. As a result, the risk level fell into a risk level IV, which represents a section with high risk. Subsequently, a secondary interval risk assessment method was performed based on engineering geological conditions and construction conditions. The risk level of water inrush is reduced to a risk level II. The results agreed with the current tunnel situation, which verified the reliability of this approach.

A Study on the Cost Risk Analysis Method for Construction Projects (건설 프로젝트의 코스트 리스크 분석방법론에 관한 연구)

  • Lee Dong-Un;Kim Yeong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.201-211
    • /
    • 2003
  • Considering about construction projects characteristics, there Is an existing uncertainty which causes inaccuracy or invalidity under decision making situation. Therefore, cost risk analysis of numerous construction projects are Inclined to depend on expert's experiences and subjective judgements. In Korean domestic construction works, however, there is no reasonable method or process for applying subjective elements. Only probabilistic analysis using objective calculation are being used now. This research suggests a cost risk analysis method to analyze quantitatively Cost Impact by risk, and it appraises expert's subjective elements for the purpose of enhancing validity of cost estimation. Moreover, a new cost risk analysis method is introduced for providing convenient user interface in practical business.

Process for Risk Severity Estimation of Weapon System Development Project using Parametric Estimation Method/Linear Kalman Filter (모수 추정기법/선형 칼만 필터를 이용한 무기체계개발 프로젝트 위험 요소의 영향도 추정 프로세스)

  • Lee, Seung-Yup
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.6
    • /
    • pp.567-574
    • /
    • 2018
  • Risk management is a method to 1) identify risks that can adversely affect the cost, schedule, and target achievement performance of a system development project, and 2) manage the identified risks based on the severity and likelihood assigned to each risk item. Risk management is applicable to various fields, since it can manage the cost/schedule and effectively guides accomplishing the target performance by identifying and managing the risks in advance, which necessitates many concurrent studies. This paper proposes a procedure to estimate the severity value for a risk item using a Kalman filter. It is assumed that the severity can be expressed as an equation consisting of cost/schedule loss during the risk event. A linear Kalman filter is used to reduce the error between the true and estimated values, which can eventually save resources spent on the risk management procedure. A simulation test case was conducted to demonstrate the validity of the proposed method.

A Study on Application Method & System Introduction of Laboratory Pre-hazards Risk Analysis (연구실 사전유해인자위험분석 적용방안 및 제도도입 연구)

  • Cho, Nam Joon;Ji, Yong Gu
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.4
    • /
    • pp.126-135
    • /
    • 2016
  • The purpose of this study is to develop risk assessment techniques and institutional analysis of domestic and international, the management techniques that can efficiently manage the harmful factor of the laboratory and to present the institutional measures that can be efficiently implemented. Due to a variety of adverse factors of laboratory, accidents of laboratory of various forms have occurred, but there is no risk assessment system in order to manage this effectively. So, we investigated this domestic existing risk assessment methods and the outside of the risk assessment system, and also analyzed accidents of domestic laboratory that occurred in 2014. In addition, we targeted the 24 laboratories in 21 universities to investigate the management of harmful factors of the laboratory and performed applying test for 12 domestic laboratories. Existing risk evaluation system, such as PMS, SMS, off-site impact assessment, since the industrial site is the subject, is a difficult problem to be directly applied to the laboratory of the research institute. So, we implemented management status and harmful factors survey and classified the research and development activities based on this data. Finally we developed "pre-hazards risk analysis method" to create each of the safety management measures. In addition, research activities personnel conducted voluntarily risk assessment, which is shared by institutions and government. It is presented the institutional system for safety management of laboratory. Its result, pre-hazards risk analysis method and institutionalization scheme will be able to achieve laboratory accident prevention system.