• Title/Summary/Keyword: risk management method

Search Result 1,577, Processing Time 0.026 seconds

Determination of Risk Level Using Fuzzy Multi-Criteria Decision Method (퍼지 다기준 의사결정기법을 이용한 위험수준평가)

  • Jung, Sang-Yun;Cho, Sung-Ku
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.24 no.4
    • /
    • pp.627-638
    • /
    • 1998
  • For any hazardous operation or risky project to be carried out safely and economically, it is of the utmost importance to formulate proper risk management policies based on the rational assessment of the risk levels of various potential hazards. In this paper, a Fuzzy Multi-Criteria Decision Making(FMCDM) method for risk assessment is proposed. The method evaluates, on the basis of fuzzy set theory, the risk level of a risky situation by aggregating the assessed levels of risk factors and their subjective weights. The method also allows some flexibility for the future users in the sense that, first, the relative importance weights for the three risk factors can be adjusted according to the nature of projects or systems and, second, the users have the choice between the two types of risk assessment results, that is, the assessed risk levels or the ranks of the risk situations. A numerical example for the proposed FMCDM method is provided to illustrate the computational procedure. To see how the suggested FMCDM method describes well people's perceived risk level, we compared the risk values derived from the suggested method with the subjective risk evaluations for ten risky situations.

  • PDF

Capability, Service Orientation, and Performance in the Investment Management Industry

  • Lee, Kang Duck;Jung, Chang Ho;Kim, Yong Jin
    • Asia pacific journal of information systems
    • /
    • v.25 no.3
    • /
    • pp.597-625
    • /
    • 2015
  • Prior research has emphasized the significant effect of service orientation on organizational performance. However, little research on service orientation has been conducted in the financial field, including the investment management service industry in which high quality service for clients is required. In this paper, we propose a research model that centers on the concept of service orientation as a type of dynamic capability affecting firm performance. The research variables include job competency, risk management capability, operational capability, service orientation, and service performance. We assume that service orientation partially mediates the effects of risk management capability and operational capability on service performance. To test the model, we collected data from 391 fund managers in 86 teams (37 investment management companies) and analyzed it with partial least squares (PLS) method. Each of the 391 fund managers was asked to answer team level measures, which is effective for team level analysis. We find that job competency positively affects both risk management capability and operational capability, which in turn affect service orientation. Risk management capability and operational capability are assumed to directly affect service performance. However, risk management capability does not influence perceived service performance, whereas operational capability does affect it. This result indicates that risk management capability does not directly affect service performance. However, via service orientation, considering that risk management inconveniences customers and is geared to enhance service orientation, service performance is positively affected. Operational capability does not influence service orientation, whereas it affects perceived service performance. This result reveals that operational capability directly affects firm performance. As expected, service orientation significantly affects the service performance perception of fund managers. This study contributes to the literature by introducing service orientation to the financial industry and measures and tests team-level service performance. Our findings also provide insights to practitioners because to enhance team performance, managers must focus on service orientation in addition to operational capability.

Improvement of Post-earthquake Risk Assesment System for Damaged Buildings by Case Study on '11.15 Earthquake' (11.15 지진 사례를 통한 지진피해 시설물 위험도 평가 체계 개선)

  • Kang, Hyeong Gu;Yun, Nu-Ri;Kim, David;Lee, Jung Han;Kim, Hye Won;Oh, Keum Ho
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.22 no.3
    • /
    • pp.185-191
    • /
    • 2018
  • Post-earthquake risk assessment technique in Korea is developed in 2013 by National Disaster Management Research Institute, at the same time, related manual and standard regulation is distributed to every local government by National Emergency Management Agency. The objectives of this research are to investigate and evaluate the post-earthquake risk assessment of 9.12 Earthquake (M5.8, Gyeongju City, 2016) and 11.15 Earthquake (M5.4, Pohang City, 2017). To suggest and improve the assessment process of post-earthquake risk, first post-earthquake risk assessment method of advanced foreign countries including US, New Zealand and Japan are compared, and post-earthquake evaluation activities in 9.12 Earthquake and 11.15 Earthquake are analyzed. From the results, it is needed to expand the adapted building and structure types and strengthen the earthquake disaster response capacity of local government.

A Study on the Safety Enhancement of Chemical Plants Using Risk Based Inspection Method (Risk Based Inspection 기법을 이용한 화학공장의 안전성 향상에 관한 연구)

  • 노용해;유진환;서재민;임차순;고재욱
    • Journal of the Korean Society of Safety
    • /
    • v.17 no.3
    • /
    • pp.73-80
    • /
    • 2002
  • The RBI technique proposed by API is composed of three steps. The qualitative RBI method can be used for the purpose of screening the components with high risk. And the quantitative RBI method employs complex risk evaluation model for predicting component risk in a quantitative manner. The inspection program can be optimized based on the results obtained by these RBI technique. The forementioned RBI technique has been applied to a common hydrodesulfurizer unit and the technique is critically evaluated for studying its benefits and limitations, which is the main issue of this thesis. It's conducted that the RBI method can provide a method for defining and measuring the component risk, and also provide a powerful tool for managing many of the important elements of a process plant.

A Study on the Development of Risk Check List and Identification of Risk Factors for Survey in Road Construction (측량 분야의 리스크 식별을 위한 리스크 체크리스트 개발 -도로 공사를 중심으로-)

  • Kwak, Jun-Hwan;Park, Hyung-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.901-904
    • /
    • 2008
  • The purpose of this study is to identify the risk factors, analyze the risk factors and make a risk check list of survey in road construction. Generally. the risk management is consisted of 3 steps: risk identification, Risk analysis, Risk hedge. This study is focused on the identification of risk and analysis of risk. To identify the risk factors of survey, we used the specifications of road construction, law of survey, and check list of road construction. This study provides the risk check list of survey for road construction. This research was undertaken to analyze risk factors being determine by the FGI(Focus Group Interview) method with survey specialists.

  • PDF

The Recommendation of Controls for Hospital Information System Using CRAMM: Case Studies of Two Korean Hospitals

  • Moon, Song-Chul;Han, In-Goo;Lee, Sang-Jae
    • Korean Management Science Review
    • /
    • v.17 no.1
    • /
    • pp.145-158
    • /
    • 2000
  • The medical records of diagnostic and testing information include sensitive personal information that reveals some of the most intimate aspects of an individual's life. The hospital information system (HIS) operates in a state of high risk which may lead to the possible loss to the IS resources caused by various threats. This research addresses twofold : (1) to perform asset identification ad valuation and (2) to recommend countermeasures for secure HIS network using case studies This paper applied a risk management tool CRAMM (Central Computer and Tele-communications Agency's Risk Analysis and Management Method) to assess asset values and suggest countermeasures for the security of computerized medical information of two large hospitals in Korea. CRAMM countermeasures are recommended at the reference sites from the network security requirements of system utilized for the diagnosis and treatment of patients. The results of the study will enhance the awareness of IS risk management by IS managers.

  • PDF

The Risk Management of Information System Using CRAMM - Case of a Korean Credit Card Company - (CRAMM을 이용한 정보시스템 위험관리 - 신용카드회사 사례연구 -)

  • Kim, Bob-Jin;Han, In-Goo;Lee, Sang-Jae
    • Asia pacific journal of information systems
    • /
    • v.10 no.2
    • /
    • pp.149-176
    • /
    • 2000
  • As companies become more dependent upon information systems(IS), the potential losses of IS resources become critical. IS management must assume the increasing responsibility for protection of IS resources as the IS and business environments become more vulnerable to various threats. The major issues facing management, when attempting to manage risks, include the assessment of the impact of risks on business objectives and the design of security safeguards to reduce the unacceptable risks to an acceptable level. This paper provides a case study of the risk management for IS. A Korean credit card company which has the high sensitivity for customers security was selected as a case. The risk management procedure using a powerful tool, CRAMM(the Central Computer and Telecommunications Agencys Risk Analysis and Management Method) was applied for this company.

  • PDF

Application of Risk Management to Forecasting Transportation Demand by Delphi Technique (Delphi기법을 통한 교통수요예측 Risk Management 적용 방안)

  • Chung, Sung-Bong
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.2
    • /
    • pp.267-273
    • /
    • 2011
  • Since 'The Act on Private Investment of The Infrastructure' was established in 1994, private investment as well as government's investment in transport infrastructure has been active. However investment in transport infrastructure has more risks than others' due to uncertainty both in traffic volume and in construction cost. In the current appraisal procedure of deciding transportation infrastructure investment, instead of risk management, the sensitivity analysis considering only the changes of benefit, cost and social discount rate which are main factor affecting economic feasibility is carried out. Therefore the uncertainty of various factors affecting demand, cost and benefit are not considered in feasibility study. In this study the problems in current investment appraisal system were reviewed. Using Delphi technique the major factors which have high uncertainty in feasibility study were surveyed and then improvement plan was suggested in the respective of classic 4 step demand forecasting method. The range estimation technique was also mentioned to deal with the uncertainty of the future.

Risk analysis of the old pipe networks for priority determination of renovation (노후 상수관망 개량 우선순위 결정을 위한 구역별 위험도 분석)

  • Lee, Jae Hyeon;Lee, Sang Mok;Park, Byung Soo;Kwon, Hyuk Jae
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.spc1
    • /
    • pp.1167-1175
    • /
    • 2022
  • In this study, management index method has been developed to estimate the level of deterioration, applied to Cheongju city, and compared with the previous estimation methods of deterioration level of water distribution system. From the results, distribution systems of Yullyang, Naedeok1 and Yongam2 are found to be seriously deteriorated. And it was also found that probability of pipe breakage was estimated as 3.21%, 4.64% which is highest level at the steel pipe of 200 mm and 300 mm diameter. It was found that risk degree was estimated as 0.2609, 0.2644 by using management index method in Naedeok1 which is the most dangerous distribution system in the city. It was also found that results of risk analysis by management index method have been similar with the results of safety analysis by reliability method and indirect estimation method of deterioration level. Therefore, newly developed management index method can be applied and may be useful to the estimation of deterioration level for the future maintenance and management of water distribution system.

Perception of the Patient Safety Risk Factors and Safety Management by Nurses in Emergency Service, Hospitals (응급실 간호사의 환자안전 위험요인에 대한 위험성 인식과 안전 간호활동)

  • Yun, Jung MI;Park, Hyoung Sook
    • Journal of Korean Academy of Fundamentals of Nursing
    • /
    • v.21 no.4
    • /
    • pp.380-391
    • /
    • 2014
  • Purpose: This was a descriptive research study to examine the patient safety risk factors and the level of safety management of nurses in emergency service, hospitals and to analyze the relationship between the two factors. Method: Data for analysis were collected from 232 nurses in emergency service, hospitals in Busan and Gyeongnam from July 30 to September 7, 2013. Data were analyzed using descriptive statistics, t-test, one-way ANOVA, and Pearson correlation coefficients. Results: Therapeutic agents showed the highest risk level. The prevention of transfusion errors showed the highest performance. As the nurses were working in regional emergency medical centers and received education more than 7 sessions on patient safety, they readily recognized the riskiness of the safety risk factors. In addition, as the nurses were older than 40, married, having more education about safety and understood the incident report registration system well, they performed safety management better. There were significant correlations between perception of the patient safety risk factors and performance for safety management. Conclusion: Nurses in emergency service, hospitals should try to improve safety management to reduce the risk factors shown to be higher based on the results and ensure the patient safety.