Increasingly, risk analysis is becoming important ingredients in achieving the successful implementation and application in the area of the project management. The project management system is designed to manage or control the project resources on a given activity within time, cost and performance so called TPPM (Total Productive Project Management). In this research, a risk analysis model misproposed to identify potential problem areas, quantify the risks, and generated the chice of the action that can be taken to reduce the risk. In addition two analysis models are proposed : 1) risk factor model and 2) network simulation model using VERT (Venture Evaluation and Review Technique ). The objective of the remodels is to estimate the schedule, cost performance risks. These proposed quantitative models for project risk analysis are proving its value for the project managers who need to assess the risk of changes in cost, schedule, or performance. The proposed models will be used in the area of project selection, evaluation and the allocation of project resources.
R&D is inherently an uncertain endeavor, yet now more than ever those performing R&D with public funding are called upon to clarify the utility of their research. Calls for public accountability are mounting with the increase in constraints on government budgets due to the recent worldwide economic recession, in response to which both policymakers and researchers pay much more attention to rigorously assessing publicly funded R&D. A key issue complicating R&D evaluation in these circumstances is how to adequately account for the nature and degree of risk involved in a given R&D program or project. This study deliberates on certain issues involving the measurement of ex-ante risk in public R&D evaluation: (i) information asymmetry between R&D sponsors and performers, (ii) ambiguity in the measurement of returns in both prospective and retrospective evaluation, and (iii) the dilemma between measurement error and omitted variable bias for empirical estimation of R&D performance. The study then presents an analysis of hypothetical evaluation results that apply risk-relevant weights to the annual evaluation outcomes of South Korea's national R&D programs funded during 2006~2012. In this counterfactual re-evaluation of public R&D program performance, high-risk R&D programs turn out to receive higher evaluation than non-high-risk programs. The current study suggests that R&D evaluation ignoring ex-ante risk is not only conceptually invalid since R&D activities are intrinsically uncertain endeavors, but unfair as R&D performers are asked to be accountable for the results that were in fact out of their reach.
This study shows risk-based evaluation results of casualty accidents for passengers, railway staffs and MOP(Member of public) on the national railway in South Korea. To evaluate risk of these accidents, the hazardous events and the hazardous factors were identified by the review of the accident history and engineering interpretation of the accident behavior. A probability evaluation model for each hazardous event which was based on the accident appearance scenario was developed by using the Fault Tree Analysis (FTA) technique. The probability for each hazardous event was evaluated from the historical data and structured expert judgment. In addition, the severity assessment model utilized by the Event Tree Analysis (ETA) technique was composed of the accident progress scenarios. And the severity for the hazardous events was estimated using fatalities and weighted injuries. The risk assessment model developed can be effectively utilized in defining the risk reduction measures in connection with the option analysis.
일반적으로 리스크 관리는 리스크 확인, 리스크 분석, 리스크 평가, 리스크 대책, 리스크 재평가를 포함하는 일련의 과정으로 구성된다. 본 논문에서는 쉴드 TBM 터널에서 발생 가능한 리스크 요인들을 여러 문헌 자료와 워크샵을 바탕으로 조사하였다. 리스크 요인들은 지질 요인, 설계 요인, 시공 관리 요인으로 구분되었다. Fault Tree도는 리스크들을 커터, 기계 구속, 배토(굴진), 세그먼트과 관련된 4그룹으로 분류하여 작성되었다. FT도로부터 12가지 리스크 아이템을 확인하고 각각의 발생확률을 구하였다.
사이버 침해사고와 해킹의 위험성이 증대되고 있다. 이를 해결하기 위하여 정보보호기술중에서 보안위험분석 분야의 연구가 활발하게 이루어지고 있다. 하지만 평가를 위해서는 적지 않은 평가비용, 수개월의 평가기간, 평가 참여인원, 평가후의 보안대책비용, 보안관리비용에 대한 부담이 클 수밖에 없다. 이에 따라, 본 논문에서는 정량평가 형태의 위험분석평가를 프로젝트단위로 관리하며, 평가기간 및 적정 평가자 선정을 위한 사례기반추론알고리즘을 이용한 위험분석방법론 제안한다.
To account for uncertainties involved in an economic analysis of project, sensitivity analysis are usually being done in Korea. Though useful for policy analysis, but it larks explicit consideration of probability of occurring certain events considered in the sensitivity analysis. Risk analysis otherwise can explicitly account for the probability of certain event which has dire impact on project viability, such as cost, discount rate, and size of benefit. This paper reports experience of applying risk analysis method for economic evaluation of railroad investment. Probability distribution of event has paramount impact on the risk analysis results, while not many prior researches dealt with these issues. Probability distribution of rolling stock cost and operating cost, in addition to those cost variables, are developed considering railway demand in this study. Case study results are reported. Issues in applying risk analysis are reported in addition to further research direction.
도심지에서의 교통인프라 개발이 활발해 지고, 대심도 지하터널을 이용한 도시의 기반시설 확충으로 인하여 도심지 구간에서 대심도 터널시공이 많이 이루어지고 있다. 이에 따라 대심도 터널시공으로 인한 터널안전 문제와 주변 지반 및 구조물의 안전 확보여부는 중요한 이슈가 되고 있으며, 터널시공에 앞서 대심도 터널공사에 따른 리스크를 분석하고 평가하여 리스크 관리를 반드시 수행하여야 한다. 본 연구에서는 대심도 터널과 도심지 터널이라는 특성을 반영하여 터널구간에 대하여 지반조사 자료, 설계 도서, 각종 사전 검토자료 및 시공계획 등을 바탕으로 수직구, 본선터널 및 대단면 터널 정거장 구간의 지하 안전성에 대한 주요 리스크를 분석하고 평가함으로서 수직구, 본선터널과 대단면 터널정거장 구간에 대한 안전리스크를 정량적으로 관리하고자 하였다. 본 연구는 도심지 대심도 터널공사에서 시공시 리스크와 안전 문제를 사전에 검토하는 경우 기본적인 기초 참고 자료로 활용될 수 있을 것으로 기대된다.
Objective: This study aims to suggest different approaches in analyzing risks associated with musculoskeletal disorders (MSDS) for risk assessment. Background: Upon concluding that the changes in the industrial environments have made it hard to regulate diverse risk factors, the government has implemented a policy for risk assessment. Method: This study has proposed a method, creating programs using Excel that perform qualitative or quantitative analysis, for evaluating risk factors in risk assessments and has applied this in manufacture and service industries. Results: To verify the validity of the developed program, risk assessment has been performed on restaurant chefs as an example. For quantitative evaluation, the study has suggested approaches using the results for REBA evaluation and the analysis report on the work scenes of a fitting-shop in a shipbuilding industry. Application: Constructing and adapting a system using Excel in evaluating risk factors for risk assessments as this study suggests, is expected to contribute to revitalizing risk assessments.
최근 인적재난 발생의 불확실성에 대한 유연한 대처를 위해 확률 통계적 재난위험성 평가 및 위험관리 기술에 대한 필요성이 고조되고 있어 관련기술을 인적재난에 적용하기 위한 연구를 수행하였다. 먼저 재난위험성 평가 기법의 실효성, 경제성 및 지속가능한 시스템 구현을 위한 선제조건을 검토하였다. 이로부터 재난의 피해규모-발생확률 분포함수의 이론적 검토를 통해 확률 통계적인 재난위험 지표를 도출하고 재난안전(위험)도 평가에 활용함으로서 보다 간편한 정량적 재난위험도 평가기법을 개발하였기에 이를 소개한다. 또한 이를 활용하여 우리나라와 일본의 확률 통계적인 화재 안전유지 성능을 비교 분석하고 그 결과를 안전지수로 제시하였다. 향후 기존의 재난위험 평가기술과 융화 발전시켜 국내실정에 맞는 미래 재난 추정 및 예측 모델의 최적화 방안을 마련함으로써 지속적인 위험도 분석결과에 기반을 둔 합리적인 통합재난관리 방안 마련이 가능 할 것으로 기대된다.
위험분석과 내부통제평가는 조직 내 자산을 보호하기 위한 여러 보안관리 활동들 중 핵심적인 사항이다. 위험분석은 보호가 필요한 영역을 식별하는데 사용되는 활동인 반면, 내부통제평가는 현재의 내부통제시스템이 자산보호에 있어 만족할 수준인지를 확인하는데 사용되는 활동이다. 위험분석은 일반적으로 비인가된 사람으로부터의 비인가된 접근에 그 초점을 두고 있으며 인가된 사람으로부터의 잠재위협에는 상대적으로 적은 관심만을 가졌다. 부정행위에 대한 관심이 증가하는 현 상황에서는, 이들 위협들 또한 적절히 다루어져야 한다. 본 논문은 이 두 가지 활동을 비교하고 그 차이점을 논하는 것을 목적으로 한다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.