• Title/Summary/Keyword: risk analysis&assessment

Search Result 2,365, Processing Time 0.031 seconds

Considerations for Quantitative Risk Assessment of Landslides using GIS (GIS기반 산사태재해의 정량적 피해 산정을 위한 고려사항 분석)

  • Kim, Jung-Ok;Kim, Ji-Young;Kim, Hyo-Joong;Kim, Yong-Il
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.645-648
    • /
    • 2008
  • This study provides considerations for quantitative risk assessment of landslide on GIS technology. It shows how the landslide possibility analysis is linked by GIS modeling to provide loss estimation tools for landslide hazards in support of socio-economic loss reduction efforts. Those risk assessment results can deliver factual damage situation prediction to policy making for the landslide damage mitigation.

  • PDF

Fault Tree Analysis for Risk Assessment of CO2 Leakage from Geologic Storage (지중 저장 이산화탄소의 누출 위험도 평가를 위한 결함수 분석)

  • Lee, Sang Il;Lee, Sang Ki;Hwang, Jin Hwan
    • Journal of Environmental Impact Assessment
    • /
    • v.18 no.6
    • /
    • pp.359-366
    • /
    • 2009
  • CCS (Carbon Capture and Storage) is considered as the most promising interim solution to deal with the greenhouse gas such as $CO_2$ responsible for global warming. Even though carefully chosen geologic formations are known to contain stored gas for a long time period, there are potential risks of leakage. Up to now, applicable risk assessment procedures for the leakage of $CO_2$ are not available. This study presents a basis for risk analysis applicable to a complex geologic storage system. It starts with the classification of potential leakage pathways. Receptors and the leakage effect on them are identified and quantified. Then, a fault tree is constructed, which yields the minimum cut set (i.e., the most vulnerable leakage pathway) and quantifies the probability of the leakage risk through the cut set. The methodology will provide a tool for risk assessment in a CCS project. The outcomes of the assessment will not only ensure the safety of the CCS system but also offer a reliable and efficient monitoring plan.

Uncertainty Analysis and Application to Risk Assessment (위해성평가의 불확실도 분석과 활용방안 고찰)

  • Jo, Areum;Kim, Taksoo;Seo, JungKwan;Yoon, Hyojung;Kim, Pilje;Choi, Kyunghee
    • Journal of Environmental Health Sciences
    • /
    • v.41 no.6
    • /
    • pp.425-437
    • /
    • 2015
  • Objectives: Risk assessment is a tool for predicting and reducing uncertainty related to the effects of future activities. Probability approaches are the main elements in risk assessment, but confusion about the interpretation and use of assessment factors often undermines the message of the analyses. The aim of this study is to provide a guideline for systematic reduction plans regarding uncertainty in risk assessment. Methods: Articles and reports were collected online using the key words "uncertainty analysis" on risk assessment. Uncertainty analysis was conducted based on reports focusing on procedures for analysis methods by the World Health Organization (WHO) and U.S. Environmental Protection Agency (USEPA). In addition, case studies were performed in order to verify suggested methods qualitatively and quantitatively with exposure data, including measured data on toluene and styrene in residential spaces and multi-use facilities. Results: Based on an analysis of the data on uncertainty, three major factors including scenario, model, and parameters were identified as the main sources of uncertainty, and tiered approaches were determined. In the case study, the risk of toluene and styrene was evaluated and the most influential factors were also determined. Five reduction plans were presented: providing standard guidelines, using reliable exposure factors, possessing quality controls for analysis and scientific expertise, and introducing a peer review system. Conclusion: In this study, we established a method for reducing uncertainty by taking into account the major factors. Also, we showed a method for uncertainty analysis with tiered approaches. However, uncertainties are difficult to define because they are generated by many factors. Therefore, further studies are needed for the development of technical guidelines based on the representative scenario, model, and parameters developed in this study.

Seismic Risk Assessment of Bridges Using Fragility Analysis (지진취약도분석을 통한 교량의 지진위험도 평가)

  • Yi, Jin-Hak;Youn, Jin-Yeong;Yun, Chung-Bang
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.8 no.6 s.40
    • /
    • pp.31-43
    • /
    • 2004
  • Seismic risk assessment of bridge is presented using fragility curves which represent the probability of damage of a structure virsus the peak ground acceleration. In theseismic fragility analysis, the structural damage is defined using the rotational ductility at the base of the bridge pier, which is obtained through nonlinear dynamic analysis for various input earthquakes. For the assessment of seismic risk of bridge, peak ground accelerations are obatined for various return periods from the seismic hazard map of Korea, which enables to calculate the probability density function of peak ground acceleration. Combining the probability density function of peak ground acceleration and the seismic fragility analysis, seismic risk assessment is performed. In this study, seismic fragility analysis is developed as a function of not the surface motion which the bridge actually suffers, but the rock outcrop motion which the aseismic design code is defined on, so that further analysis for the seismic hazard assessment may become available. Besides, the effects of the friction pot bearings and the friction pendulum bearings on the seismic fragility and risk analysis are examined. Lastly, three regions in Korea are considered and compared in the seismic risk assessment.

A Study on Application Method & System Introduction of Laboratory Pre-hazards Risk Analysis (연구실 사전유해인자위험분석 적용방안 및 제도도입 연구)

  • Cho, Nam Joon;Ji, Yong Gu
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.4
    • /
    • pp.126-135
    • /
    • 2016
  • The purpose of this study is to develop risk assessment techniques and institutional analysis of domestic and international, the management techniques that can efficiently manage the harmful factor of the laboratory and to present the institutional measures that can be efficiently implemented. Due to a variety of adverse factors of laboratory, accidents of laboratory of various forms have occurred, but there is no risk assessment system in order to manage this effectively. So, we investigated this domestic existing risk assessment methods and the outside of the risk assessment system, and also analyzed accidents of domestic laboratory that occurred in 2014. In addition, we targeted the 24 laboratories in 21 universities to investigate the management of harmful factors of the laboratory and performed applying test for 12 domestic laboratories. Existing risk evaluation system, such as PMS, SMS, off-site impact assessment, since the industrial site is the subject, is a difficult problem to be directly applied to the laboratory of the research institute. So, we implemented management status and harmful factors survey and classified the research and development activities based on this data. Finally we developed "pre-hazards risk analysis method" to create each of the safety management measures. In addition, research activities personnel conducted voluntarily risk assessment, which is shared by institutions and government. It is presented the institutional system for safety management of laboratory. Its result, pre-hazards risk analysis method and institutionalization scheme will be able to achieve laboratory accident prevention system.

VULNERABILITY ASSESSMENTS AND RISK MANAGEMENT FOR CRITICAL INFRASTRUCTURES FROM HOMELAND SECURITY VIEWPOINTS

  • Chun Nen Huang;Yao-Chen Kuo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.292-301
    • /
    • 2009
  • The employment of risk management theory in Urban Disaster Management System (UDMS) has become an important trend in recent years. The viewpoint of risk management is mainly a comprehensive risk assessment of various internal and external factors, and a subsequent handling of risks. Through continuous and systematic accumulation and analysis of risk information, disaster prevention and rescue system is established. Taking risk management theory as the foundation, Organization for Economic Cooperation and Development (OECD) has developed a series of UDMS in the mega-cities all over the world. With this system as a common platform, OECD cooperates with different cities to develop disaster prevention and rescue system consisting of vulnerability assessment methods, risk assessment and countermeasures. The paper refers to the urban disaster vulnerability assessment and risk management of OECD and the mega-cities of different advanced and developed countries in the world, and then constructs a preliminarily drafted structure for the vulnerability assessment methods and risk management mechanism in the metropolitan districts of Taiwan.

  • PDF

A Study on the Effectiveness Improvement of Safety Education - Focused on the Education of Manufacturing Risk Assessment Officer - (안전교육의 효과성 향상에 관한 연구 - 제조업 위험성평가 담당자 교육을 중심으로 -)

  • Jin Eog Kim
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.1
    • /
    • pp.97-104
    • /
    • 2023
  • Purpose: The web based KRAS risk assessment support system to facilitate risk assessment in small businesses and provides an assessment model for each type of business. In order to help understand risk assessment, private institutions have opened and operated training in charge of risk assessment. It will present the effectiveness of education in charge of risk assessment and measures to improve and revitalize it accordingly. Method: Using SPSS 22 for 670 workplaces that completed risk assessment personnel training within 5 years from 2017 to 2021, the disaster rate was analyzed through correlation analysis and t-test by dividing groups of less than 100 people into groups of 100 people. Result: Hypothesis 1-5 are adopted and reject 5-8. Conclusion: It is possible to consider the organization of a curriculum according to the size of a company for corporate education with more than 100 employees and to enhance the benefits of recognizing risk assessment.

Comparative Study of Regional-scale Ecological Risk Assessment used in Developed Countries (지역단위 생태위해성평가 선진국사례 분석)

  • Shin, Yu-Jin;Lee, Woo-Mi;An, Youn-Joo
    • Environmental Analysis Health and Toxicology
    • /
    • v.25 no.2
    • /
    • pp.169-177
    • /
    • 2010
  • Ecological risk assessment (ERA) has been used to establish environmental quality standards or evaluate ecological risk in site-specific areas. The scope of ERA was expanded based on regions, and the concept of regional-scale ecological risk assessment was recently introduced in developed countries. In the present study, regional ERA approaches of relative risk model (RRM), contaminants in aquatic and terrestrial ecosystems (CATS) model, and procedure for ecological tired assessment of risks (PETAR) in advanced countries were extensively investigated. Regional ERA was compared with traditional ERA process. Stressors, receptor and response in traditional ERA were replaced with sources of stressors, habitats, and ecological impacts, respectively in regional ERA. This study introduces the concept and assessment process of regional ERA, and provides a wide perspective how the relative ERA could be applied in Korean ecosystem.

A study on quantitative risk assessment of mechanical accidents (사업장의 기계재해 위험성평가에 관환 연구)

  • Han, Ou-Sup
    • Journal of the Society of Disaster Information
    • /
    • v.5 no.2
    • /
    • pp.140-152
    • /
    • 2009
  • Recently the occurrence ratio of mechanical accidents in industrial disaster of korea is increased, but very little accident information has been given regarding the prevention of mechanical accidents. In this study, mechanical accidents by the analysis of industrial accident case was examined. And it was proposed the risk assessment method and building database for investigation of risk factors in mechanical accident. As a result, from mechanical accidents database, it was found that the occurrence ratio of mechanical accident by constriction and falling etc. is very high and death ratio by mechanical accident is larger than that of usual accident. And we applied the quantitative risk assessment method proposed by this study in the mechanical accident analysis of a domestic manufacturer. From the results, the risk factors due to constriction, curling, falling and scattering are principal causes of mechanical accidents. These result is similar to that of the analysis of mechanical accidents for recent 12 years in korea.

  • PDF

Concept Selection of NPP Construction Delay Risk Assessment Methodology Using Systems Engineering Approach

  • Hossen, Muhammed Mufazzal;Kang, Sunkoo;Jung, JC;Kim, Jonghyun
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.11 no.1
    • /
    • pp.9-24
    • /
    • 2015
  • Construction industry faces a lot of inherent uncertainties and issues and the construction phase of nuclear power project is not free from this risk. This paper investigates promising methodologies to be used on nuclear power plant (NPP) construction schedule delay risk assessment by using entry level systems engineering approach. This study contains how the initial concept for the risk assessment methodology has been developed. In this point of view, this work structured on three main phases: needs analysis (NA), concept exploration (CE), and concept definition (CD) through systems engineering (SE) approach. Traditionally, the SE process is applied to technical development programs but this study opens up a new avenue that SE can also be successfully applied to the development and optimization of the risk assessment model. This study provides a rational and systematic process for developing and selecting the best risk assessment model. This paper selects analytic hierarchy process (AHP) method to assess NPP construction schedule delay risk for international project. As conclusion, the proposed concept and selected method can discriminate successfully and clearly among schedule delay risk assessment methods.