The Transactions of The Korean Institute of Electrical Engineers
/
v.62
no.4
/
pp.584-590
/
2013
Depending on the operating characteristics, track circuit is installed for the purpose of control directly or indirectly of the signal device, point switch machine and other security device. These are mainly used for train detection, transmission of information, broken train detection and transmission of return current. Especially, the return current is related to signal system, power system and catenary line, and track circuit systems. It is one of the most important component shall be dealt for the safety of track side staff and for the protection of railway-related electrical system according to electrification. Therefore, an accurate analysis of the return current is needed to prevent the return current unbalance and the system induced disorder and failure due to an over current condition. Also, if the malfunction occurred by the return current harmonics, it can cause problems including train operation interruption. In this paper, we presented measurement and analysis method at return current and it's harmonics by train operation. By the test criteria, we evaluated for safety. Hereafter, it is expected to contribute to the field associated with it.
In the electrified section, both of return current and signal current are flowing in the same rail in common. But signal current shall be allowed to flow in the specific track circuit and not in the other circuit while the traction return current shall come back to power sub-station. This paper presents measuring system that use both sensor and antenna. The aim of the system is to achieve the difference in current between the two rails and the presence of trimming capacitors. In order to improve the transmission level, trimming capacitors are connected between the two rails at constant spacing. To maintain the balance of traction return current, rails of both sides may be jointed by the so-called SVPMM. The traction return current is sometimes unbalanced owing to the ill-contact of SVPMM. In this paper, we propose a diagnosis method based on a short-circuited current(Icc), trimming capacitors and traction return current measured by Korail inspection vehicles. Whether Icc is good or bad depends not only on the presence of trimming capacitors but also on the unbalance of the traction return current.
In electrical railway system, power supplied to electrical locomotive by catenary is returned to sub-station on track. The current returned to sub-station on track is return current, which is an essential factor for the safety of the wayside electrical equipment and maintenance staff. Therefore, earth system acts an important role to protect wayside electrical equipment and maintenance staff against return current. In general, individual earth system protects partially the electrical railway system, but common earth system does the whole electrical railway system and minimizes the flow of return current. In this paper, we are compared the effect of return current according to earth type by actual measurement in existing electrical railway system. The measurement was conducted at Shinchungju sub~station in high speed trains, and Guro sub-station, which is electrified section in classical line.
The Journal of Korean Institute of Communications and Information Sciences
/
v.42
no.5
/
pp.1110-1116
/
2017
Depending on the operating characteristics, track circuit is installed for the purpose of direct or indirect control of the signal device, point switch machine and other security device. These are mainly used for train detection, transmission of information, broken rail detection and transmission of return current. Especially, the return current is related to signal system, power system and catenary line, and track circuit systems. It is one of the most important component shall be dealt for the safety of track side staff and for the protection of railway-related electrical system according to electrification. Therefore, an accurate analysis of the return current is needed to prevent the return current unbalance and the system induced disorder and failure due to an over current condition. Also, if the malfunction occurred by the return current harmonics, it can cause problems including train operation interruption. In this paper, we presented measurement and analysis method at return current and it's harmonics by high speed train operation on the honam high speed line.
Kim, Yong-Kyu;Kim, Ju-Yeop;Oh, Seh-Chan;Baek, Jong-Hyun;Yoon, Yong-Ki;Kwak, Woo-Hyun
The Transactions of The Korean Institute of Electrical Engineers
/
v.66
no.5
/
pp.877-884
/
2017
A method of common earth, which is proposed by French Railway(SNCF) and is applied to high speed railway, minimizes the effect of the traction return current from tracks so that trackside electric devices can be protected and operation and maintenance staffs are kept out from injury in an electric railway environment. According to it, all the new domestic electric railway lines are replaced from existing individual earth method to the common earth method. In this paper, we analyze the correlation between common earth method and traction return current to prove whether the common earth has surely contributed to minimize the effect of the traction return current. The analysis was done based on the measurement of the traction return current at the domestic high speed railway line.
The Transactions of the Korean Institute of Electrical Engineers B
/
v.51
no.9
/
pp.509-514
/
2002
The aim of this research is to find out how the common earth network affects the level of the traction return current in the $2{\times}25 kV$ Power Supply System. The traction return current plays a significant role in the operation of the facilities near the rails. It is shown that the common earth network in the $2{\times}25 kV$ power supply system not only minimizes the level of the traction return current, but also increases the safety of the working crew on the railways. In order to determine the relationship between common earth network and the traction return current, we investigated the earth system of the Gyongbu High Speed Line that is constructed following the SNCF regulations. We carried out the field test in the Osong station. The results of the test show that the common earth network minimizes the effect of the traction return current. We also find that the simulated results are very similar to the test results. We concluded that the results of the test can be applied for the rest of the Gyongbu High Speed Line under construction.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.28
no.9
/
pp.8-13
/
2014
Currently it is major problem of electric railway with increasing drive speed such as the arc generated by the pantograph detachment and the distortion current in the motor-block high speed switching. When physical contact between the pantograph and the catenary line is separated, the pantograph detachment arcing occurs and it makes up the conductive noise to the return feeder. We made the EMTP modeling of the railway traction system and the pantograph arc by circuit elements and switches. The influence of pantograph detachment frequency is investigated by changing some frequencies. The over-current occurs in each detachment and it oscillates some time at beginning and stabilizes gradually. The magnitude of over-current is decided by instantaneous value of existing traction return current. If the detachment occurs at a point of peak value or distortion current, the over-current will be more harmful to the power systems connected with the return feeder and will become to arise with increasing detachment frequency.
The method proposed by Carson contains indefinite complex integral which simulates earth return current. Although the Carson solution is proposed with power series, the solution is limited and valid at special range of frequency. We proposed a simplified Carson solution by modelling earth current path analytical method using ground transmission line return current. In this paper, we studied on trying to find the equivalent distance for earth current return path.
The Transactions of The Korean Institute of Electrical Engineers
/
v.65
no.12
/
pp.1958-1964
/
2016
AC railway feeding system use single phase to supply power to the railway vehicles. And the system use the rail track as a return current path, so that current flows in the rail. In this situation inductive interference on communication system and unsafe environment can appear on railway system. Therefore knowing the current distribution of catenary system and analysing the return current is required. In this study detail return current distribution was analyzed by modeling the catenary system as 4-conductors group. The distribution characteristics and trends of return current were studied by using the PSCAD/EMTDC and FDTD method that based on Maxwell equation was used to calculate the induced voltage. Simulation code was made by MATLAB. Using this study result data, we can suggest the proper installation location of digital device and these data can be used for additional studies related to return current or induced voltage as a base data.
The Transactions of The Korean Institute of Electrical Engineers
/
v.60
no.4
/
pp.892-898
/
2011
In DC electric railways, while an electric rail car is driving, a part of the working current returned to the substation through rails leaks into the ground. Such a stray current causes railway facilities and metal objects to corrode electrolytically. Therefore, change of stray current needs to be monitored constantly. But so far in domestic, the research on stray current measuring techniques and system adaption are insufficient. To estimate stray current, this paper addresses a method of monitoring the return current that is returned into the negative pole of the substation in real time.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.