• 제목/요약/키워드: replacement method

검색결과 1,398건 처리시간 0.036초

족관절 인공 관절 치환술 (Total Ankle Replacement)

  • 최기원;최우진;이진우
    • 대한족부족관절학회지
    • /
    • 제15권3호
    • /
    • pp.132-138
    • /
    • 2011
  • Although first generation total ankle replacement (TAR) had high failure rates, recent investigations have reported good results of the newer generations of TAR due to advances in implant designs and techniques. Patient selection is critical to performing TAR to obtain promising outcomes and to decrease complication rate. As the current concepts of correcting the accompanying deformity have been established, TAR in moderate to severe varus deformity of the ankle result in favorable outcomes and indications for TAR are expanding. Correction of deformity and hindfoot fusion should be performed in conjunction with TAR if needed. If radiolucency around components or osteolysis is progressive during follow-up, CT should be carried out as a confirmative diagnostic method. TAR is an effective treatment modality alternative to ankle fusion. However, we should recognize that TAR is a demanding procedure, which requires accurate techniques, enough experience, and preoperative plan for a concomitant deformity.

리젝트애쉬를 사용한 콘크리트 특성 (The Properties of Concrete with Reject Ash)

  • 백철우;김호수;박조범;류득현
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2006년도 춘계 학술발표회 논문집(II)
    • /
    • pp.481-484
    • /
    • 2006
  • The purpose of this study is to present the recycling method of reject-ash. The reject-ash, a significant portion of the pulverized fuel ash produced by coal-fired power plants and rejected from the ash classifying process, has remained unused due to its high carbon content and large particle size. This study compared reject-ash with fly-ash by physical properties, the properties of fresh & harden concrete with cement replacement ratio of reject-ash and fly-ash, 0, 5, 10, 15, 20, 25(wt. %). The loss of ignition of the reject-ash is similar to fly-ash and is suited to the KS L 5405. When the replacement ratio of reject-ash is increasing the air content of reject-ash concrete is lowly decreased. The results of the compressive strength measurement of reject-ash tends to decrease by increasing the replacement ratio.

  • PDF

장수명 주택의 수선교체주기 설정을 위한 BIM활용에 관한 연구 (A Study on the BIM Application for Establishment of the Repair and Replacement Cycle of Long-Life Housing)

  • 정수진;박정로;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.147-148
    • /
    • 2011
  • This study applied BIM(Building Information Modeling) technology for Long-life Housing within exterior, interior and building equipment. There has many changes and depression infill material after construction. Therefore to understand establishment of repair and replacement cycle is necessity. In addition, the method of classification is necessary because of construction equipment efficiency. On this study, we will find how can we manage them and establish the repair and repairment cycle by applying BIM technology.

  • PDF

발전소 제어설비의 신뢰성 평가를 이용한 최적 개조방안 도출(보령화력 사례) (The study of retrofit method for the used control system of Power Plants to improve its reliability)

  • 신윤오;정창기
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1999년도 하계학술대회 논문집 B
    • /
    • pp.737-739
    • /
    • 1999
  • All equipment generally has a specified design service life. As an equipment nears the end of its design service life, replacement must be considered. In some cases, it is possible and more economical to continue the usage of the existing equipment for a longer period. So, replacement should be carefully decided considering the feasibility and economic benefits of the existing equipments' life extension. In this paper, assessment procedure for deciding between life extension and replacement of the electronic control system is presented with an application example. In particular estimation of the electronic control system's remaining life is focused on.

  • PDF

쇄석말뚝의 지지력 특성에 관한 모형시험 연구 (A Model Test Study on the Bearing Capacity of the Crushed Stone Pile)

  • 이상익;박용원;김병일;윤길림
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2001년도 봄 학술발표회 논문집
    • /
    • pp.299-306
    • /
    • 2001
  • Crushed Stone Pile(CSP) is one of the ground improvement methods available to loose sand and clayey ground by forming compacted CSP in the weak soil layer. The effects of this method are enhancement of ground bearing capacity, reduction of settlement and prevention of lateral ground movement in cohesive layer, reduction of liquefaction potential in sandy ground. This study performs model tests in 1.0m${\times}$1.0m${\times}$1.0m and 1.5m${\times}$1.5m${\times}$l.2m model tank to observe bearing capacity of CSP treated ground. The area replacement ratio of CSP composite ground varies 20%, 30% and 40% with square grid pattern. After the composite ground was consolidated under pressure of 0.5kg/$\textrm{cm}^2$ and 1.0kg/$\textrm{cm}^2$, load tests were carried out. The results show that ultimate bearing capacity increases with area replacement ratio and the preconsolidation pressure of ground.

  • PDF

무릎관절 전치환술을 시행한 혈우병 환자의 무릎관절 가동범위를 향상시키기 위한 물리치료에 관한 고찰 (Consideration of Physiotherapy for the Improvement of Knee Joint Range of Motion after Total Knee Replacement in Patients with Hemopilic Arthropathy)

  • 전혜림;인태성
    • 대한물리치료과학회지
    • /
    • 제24권2호
    • /
    • pp.53-60
    • /
    • 2017
  • Purpose: This study aimed to investigate the effect of physiotherapy on the range of motion (ROM) of patients with hemophilic arthropathy after total knee replacement (TKR) during treadmill gait. Method: Nineteen patients (age range, 30-61 years) who received physiotherapy at the Korea Hemophilia Foundation (KHF) Clinic in Seoul between 2011 and 2013 after TKR were recruited. Protocol rehabilitation was performed (KHF Clinic, Department of Physiotherapy) with an average follow-up of 70 days (range, 6-141 days). Result: Physiotherapy after TKR improved the ROM parameters, including the post-operative average ROM. The post-operative and follow-up ROM also significantly increased. Conclusion: Patients with hemophilia require different physiotherapeutic techniques and need dedicated post-operative care in comparison with the general population.

진동치환 스톤칼럼공법에 의한 액상화 저감 효과 (Reduction Effect of liquefaction by Vibro-Replacement Stone Columns)

  • 이송;채점식;박상국
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2001년도 춘계학술대회 논문집
    • /
    • pp.443-450
    • /
    • 2001
  • This paper shows the reduction effect of tile earthquake-induced liquefaction potential of soils that improved by Vibro-Replacement Stone Columns. The Vibro-Replacement Stone Columns method transforms soft cohesive soils into a composite mass of compacted granular or crushed stone columns by using vibrating equipment and water jets. This study investigated and analyzed the behavior of the stone columns and composite ground using the results of in situ test and measurement at the job-site. This paper shows the evaluation of the earthquake-induced liquefaction potential of soils using in situ test. There are different types of in situ test used in the evaluation the liquefaction potential. In the particular study the Standard penetration test, and Cone penetration test were used. The N value of Standard Penetration test has been used all over for a very long time. The evaluation of the liquefaction of soil was performed using the worldwide renewed Cone penetration test

  • PDF

모래다짐말뚝 개량폭에 따른 보강효과에 관한 연구 (A Study on Effect of Ground Improvement by Sand Compaction Pile Changing Replacement Width)

  • 김시운;정길수;박병수;유남재
    • 산업기술연구
    • /
    • 제25권A호
    • /
    • pp.67-73
    • /
    • 2005
  • In this research, centrifuge model experiments and numerical approach of finite element method to analyze experimental results were performed to investigate the behavior of improved ground with sand compaction piles. One of typical clay minerals, kaolinite powder, were prepared for soft ground in model tests. Jumunjin standard sand was used to sand compaction pile installed in the soft soil. In order to investigate the characteristics of mechanical behavior of sand compaction piles with low replacement ratios, centrifuge model experiments with the replacement ratio of 40%, changing the width of improved area with respect to testing results the width of surcharge loads, were carried out to obtain of bearing capacity, characteristics of load-settlement, vertical stresses acting on the sand pile and the soft soil failure mechanism in improved ground.

  • PDF

Corrosion Resistance Properties of Rice Husk Ash Blended Concrete

  • Ganesan, K.;Rajagopal, K.;Thangavel, K.
    • Corrosion Science and Technology
    • /
    • 제6권1호
    • /
    • pp.12-17
    • /
    • 2007
  • Portland cement incorporating supplementary cementing material develops excellent mechanical properties and long term durability characteristics. India is a leading rice producing country and rice husk is considered as waste in the rice milling industries. In this present work, the rice husk ash (RHA) was added to concrete as cement replacement from 0 to 30%. Corrosion performance of reinforcing steel embedded in RHA blended concretes was studied using linear polarization, AC impedance and gravimetric methods. The corrosion rate of steel bars embedded in RHA concretes were compared with control concrete. The results clearly indicate that the corrosion rate of reinforcing steel embedded in concrete is significantly reduced with the incorporation of RHA. A good correlation among gravimetric method and electrochemical methods was observed. Electrochemical impedance study showed 98 percentage reduction in corrosion rate to the RHA blended concrete with 15% replacement than control concrete.

Load Redistribution of Prestressed Concrete Girder Bridges during the Bearing Replacement

  • Park, Sun-Kyu;Kim, Hyeong-Yeol;Kim, Jung-Hyuk
    • KCI Concrete Journal
    • /
    • 제11권3호
    • /
    • pp.141-151
    • /
    • 1999
  • In the replacement of bearing system of bridges, the jacking work to secure work spaces may cause damage of the superstructure, hence the behavior of superstructure by the jacking force must be considered. Especially, in prestressed concrete I-type girder bridges, considering the stress concentration at the girder and the load redistribution of superstructure, the allowable jacking force and jacking sequence have to be determined. In this study, an analytical method is proposed to calculate the jacking force and overall jacking sequence for the replacement of bearing system without any damage to the superstructure. The stress concentration at the girder and load redistribution of the deck due to jacking force are considered to compute the allowable jacking force for each girder and overall jacking sequence for girders in the deck. Using the solution algorithm developed in this study, the optimum jacking sequence and required jacking force for the prestressed concrete I-type gilder bridge having the standard sections are calculated.

  • PDF