• Title/Summary/Keyword: replacement cycle

Search Result 217, Processing Time 0.029 seconds

Optimal replacement strategy under repair warranty with age-dependent minimal repair cost

  • Jung, K.M.
    • International Journal of Reliability and Applications
    • /
    • v.12 no.2
    • /
    • pp.117-122
    • /
    • 2011
  • In this paper, we suggest the optimal replacement policy following the expiration of repair warranty when the cost of minimal repair depends on the age of system. To do so, we first explain the replacement model under repair warranty. And then the optimal replacement policy following the expiration of repair warranty is discussed from the user's point of view. The criterion used to determine the optimality of the replacement model is the expected cost rate per unit time, which is obtained from the expected cycle length and the expected total cost for our replacement model. The numerical examples are given for illustrative purpose.

  • PDF

Extended warranty model under minimal repair-replacement warranty policy

  • Jung, Ki Mun
    • International Journal of Reliability and Applications
    • /
    • v.18 no.1
    • /
    • pp.1-8
    • /
    • 2017
  • In this paper, we study an extended warranty model under minimal repair-replacement warranty (MRRW) which is suggested by Park, Jung and Park (2013). Under MRRW policy, the manufacturer is responsible for providing the minimal repair-replacement services upon the system failures during the warranty period. And if the failure occurs during the extended warranty period, only the minimal repair is conducted. Following the expiration of extended warranty, the user is solely responsible for maintaining the system for a fixed length of time period and replaces the system at the end of such a maintenance period. During the maintenance period, only the minimally repair is given for each system failure. The main purpose of this article is to suggest the extended warranty and replacement model with MRRW. Given the cost structures incurred during the life cycle of the system, we formulate the expected cost and the expected length of life cycle to obtain the expected cost rate.

  • PDF

A Study on the Proposal of Amendment of Laws and Regulations on the Improvement of Defect Determination Criteria for Painting Work and the Establishment of Replacement Cycle for Fire door (도장공사 하자판정기준 개선 및 방화문 교체 주기 설정에 관한 법령 개정안 제안 연구)

  • Kim, Soo-Yeon;Kwon, Young-Jin;Kim, Yun-Seong;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.95-96
    • /
    • 2022
  • Based on the analysis of defects occurring before and after painting work, this study intends to derive a reasonable improvement in judgment criteria and propose an amendment to the relevant law through the establishment of a clear fire door replacement cycle in terms of fire safety.

  • PDF

Probabilistic Optimization for Improving Soft Marine Ground using a Low Replacement Ratio (해상 연약지반의 저치환율 개량에 대한 확률론적 최적화)

  • Han, Sang-Hyun;Kim, Hong-Yeon;Yea, Geu-Guwen
    • The Journal of Engineering Geology
    • /
    • v.26 no.4
    • /
    • pp.485-495
    • /
    • 2016
  • To reinforce and improve the soft ground under a breakwater while using materials efficiently, the replacement ratio and leaving periods of surcharge load are optimized probabilistically. The results of Bayesian updating of the random variables using prior information decrease uncertainty by up to 39.8%, and using prior information with more samples results in a sharp decrease in uncertainty. Replacement ratios of 15%-40% are analyzed using First Order Reliability Method and Monte Carlo simulation to optimize the replacement ratio. The results show that replacement ratios of 20% and 25% are acceptable at the column jet grouting area and the granular compaction pile area, respectively. Life cycle costs are also compared to optimize the replacement ratios within allowable ranges. The results show that a range of 20%-30% is the most economical during the total life cycle. This means that initial construction cost, maintenance cost and failure loss cost are minimized during total life cycle. Probabilistic analysis for leaving periods of shows that three months acceptable. Design optimization with respect to life cycle cost is important to minimize maintenance costs and retain the performance of the structures for the required period. Therefore, more case studies that consider the maintenance costs of soil structures are necessary to establish relevant design codes.

User Interface Design for Life Cycle Cost Estimation System (LCC 산정 시스템의 사용자인터페이스 설계)

  • Yang, Hoe-Ryeong;Shin, Han-Woo;Kim, Tae-Hui
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.149-150
    • /
    • 2012
  • According to the increase of demand of the deteriorated building. The interest of the building's maintenance is continually increased, so studies about how to increase building's stability & prolonged life span are increased. This study's purpose is to maintain building's function, so we suggest a protocol type system of UI to estimate reasonable planning of demand of repair & replacement and to distribute budget.

  • PDF

A Case Study on the Life Cycle Cost Analysis of Steel Box Girder and Prestressed Concrete Box Girder Bridge (Steel Box교와 PSC Box교의 LCC 분석에 관한 사례연구)

  • Ahn Jang-Won;Cha Kang-Suk;Kim Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.2 s.6
    • /
    • pp.59-67
    • /
    • 2001
  • The purpose of this study is to evaluate economics by the Life Cycle cost(LCC) analysis of Steel Box Girder and Prestressed Box Girder bridge types. The study has been performed as a case study. A questionnaire survey for the repair and replacement cycle has been done in order to predict operation and maintenance costs. For LCC analysis and comparison, the present value technique is used. The results of this study are summarized as follows: (1) A LCC analysis model of Steel Box Girder and Prestressed Box Girder bridge types is suggested through a case study. (2) The repair and replacement cycle of elements of them are investigated using a questionnaire survey. (3) As a result of LCC case study, the type of Prestressed Box Girder bridge is analyzed more economic than Steel Box Girder.

  • PDF

A Bayesian approach to maintenance strategy for non-renewing free replacement-repair warranty

  • Jung, K.M.
    • International Journal of Reliability and Applications
    • /
    • v.12 no.1
    • /
    • pp.41-48
    • /
    • 2011
  • This paper considers the maintenance model suggested by Jung and Park (2010) to adopt the Bayesian approach and obtain an optimal replacement policy following the expiration of NFRRW. As the criteria to determine the optimal maintenance period, we use the expected cost during the life cycle of the system. When the failure times are assumed to follow a Weibull distribution with unknown parameters, we propose an optimal maintenance policy based on the Bayesian approach. Also, we describe the revision of uncertainty about parameters in the light of data observed. Some numerical examples are presented for illustrative purpose.

  • PDF

Optimal replacement policy following the expiration of payable RRNMW (유료 재생교체-비재생수리보증이 종료된 이후의 최적의 교체정책)

  • Jung, Ki-Mun
    • Journal of Applied Reliability
    • /
    • v.11 no.4
    • /
    • pp.409-417
    • /
    • 2011
  • In this paper, we consider a replacement model following the expiration of warranty. In other words, this paper proposes the optimal replacement policy for a repairable system following the expiration of payable renewing replacement-non-renewing minimal repair warranty. The expected cost rate per unit time from the user's perspective is used to determine the optimality of the replacement policy. Thus, we derive the expressions for the expected cycle length and the expected total cost to obtain the expected cost rate per unit time. Finally, the numerical examples are presented for illustrative purpose.

Replacement Model after Extended Two-phase Warranty (연장된 이단계 보증 이후의 교체모형)

  • Jung, Ki Mun
    • Journal of Integrative Natural Science
    • /
    • v.14 no.4
    • /
    • pp.197-204
    • /
    • 2021
  • Under the two-phase warranty, the warranty period is divided into two intervals, one of which is for renewing replacement warranty, and the other is for minimal repair warranty. Jung[13] discusses the two types of extended two-phase warranty models. In this paper, we suggest the replacement model after the extended two-phase warranty that has been proposed by Jung[13]. To determine the optimal replacement policy, we adopt the expected cost rate per unit time. So, the expressions for the total expected cost, the expected length of the cycle and the expected cost rate per unit time from the user's point of view are derived. Also, we discuss the optimal replacement policy and the uniqueness of the solution for the optimization. Furthermore, the numerical examples are provided to illustrate the proposed the replacement model.

Development of Repair and Replacement Cost Management System for Public Buildings to Establish Accurate Facility Management Budgets

  • Choi, Min-Chan;Lee, Chun-Kyong;Jung, Tae-Gab;Park, Tae-Keun
    • Architectural research
    • /
    • v.14 no.2
    • /
    • pp.75-83
    • /
    • 2012
  • Buildings that are more than 10 years old generally have considerable repair and replacement costs due to the rapid deterioration of their systems. For public buildings in particular, which have national and social significance, considerable effort is required not only to ensure a long life cycle and safety but also to minimize the overall public expense. Along with increasing repair and replacement requirements, however, there have been problems related to the establishment of an accurate facility management budget. To address these concerns, a repair and replacement cost management system was constructed. This system manages both invested maintenance and forecast costs to establish a reasonable repair and replacement planning process and budget. The effectiveness of the system was verified through a pilot test targeting one of public Corporation (K).